![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
No | CODE | Description | Tank No. : TK-001 (VPDM) Shell Material : A537-CL2 Net Weight : 1670.592 (Ton) Gross Weight : 1802.294 (Ton) Welding Rod : 5.082 (Ton) | Tank No. : Turkey SECL (1 ONE-FOOT) Shell Material : A516-70 Net Weight : 235.93 (Ton) Gross Weight : 261.359 (Ton) Welding Rod : 1.222 (Ton) | ¿ø°¡³»¿ª | ||||||
Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | ||||
1 | FIXC | 1. ENG'G and Design | 150,000 | 90 | 2.21 (%) | 0.78 (%) | 150,000 | 636 | 13.31 (%) | 4.99 (%) | 1. ¼³°èºñ |
2 | 2. Material Cost | 2. Àç·áºñ | |||||||||
3 | MATC | 2.1 Main Material | 2,935,245 | 1,757 | 43.15 (%) | 15.28 (%) | 430,022 | 1,823 | 38.17 (%) | 14.3 (%) | 2.1 Main Steel ÀÚÀçºñ |
4 | ¡¡ 2.2 ¿ëÁ¢ºÀ ±¸¸Åºñ + Accessory | 31,865 | 6,270 | 0.47 (%) | 0.17 (%) | 2,831 | 2,317 | 0.25 (%) | 0.09 (%) | 2.2 ¾×¼¼¼¸® | |
7 | ¡¡ 2.5 Surrounding Pipe | 122,428 | 73 | 1.8 (%) | 0.64 (%) | 17,651 | 75 | 1.57 (%) | 0.59 (%) | 2.5 ÁÖº¯ ÆÄÀÌÇÁ | |
8 | ¡¡ 2.6 Insulation Material | 1,825,022 | 1,092 | 26.83 (%) | 9.5 (%) | 279,129 | 1,183 | 24.78 (%) | 9.28 (%) | 2.6 ´Ü¿Àç | |
9 | ¡¡ 2.7 Platform, handrail and Stairway for FD | 26,271 | 111 | 2.33 (%) | 0.87 (%) | 2.7 FDÀÇ Ç÷§Æû, ³°£ ¹× °è´Ü | |||||
12 | FABC | 3-1. Pre-fabrication (Bending, Cutting, Shop Weld) | 1,085,885 | 650 | 15.96 (%) | 5.65 (%) | 153,354 | 650 | 13.61 (%) | 5.1 (%) | 3-1. »çÀü Á¦ÀÛ(Àý°î, Àý´Ü, °øÀå ¿ëÁ¢) |
16 | 5. Shop Test and Inspection | 128,121 | 77 | 1.88 (%) | 0.67 (%) | 17,651 | 75 | 1.57 (%) | 0.59 (%) | 5. °øÀå Å×½ºÆ® ¹× °Ë»ç | |
17 | 6. (°øÀåÁ¦ÀÛºÐ) Á¦Ç°µµÀå+Ç¥¸éó¸®+»ê¼¼ | 224,925 | 135 | 3.31 (%) | 1.17 (%) | 29,555 | 125 | 2.62 (%) | 0.98 (%) | 6. Ç¥¸é Áغñ ¹× »ê¼º ¼¼Ã´À» Æ÷ÇÔÇÑ °øÀå ÆäÀÎÆÃ | |
18 | 7. Packing & Trans -portation | 298,951 | 179 | 4.39 (%) | 1.56 (%) | 20,114 | 85 | 1.79 (%) | 0.67 (%) | 7. Æ÷Àå ¹× ³»·ú¿î¼Û | |
21 | (1) Sub - Total (EP) | 6,802,441 | 4,072 | 100.0 (%) | 35.42 (%) | 1,126,578 | 4,775 | 100.0 (%) | 37.46 (%) | (1) ¼Ò°è(EP) | |
22 | 10. Constrcution Cost | 10. ¼³Ä¡ ºñ¿ë | |||||||||
23 | 10.1 Direct Labor Cost | 4,453,222 | 2,666 | 39.05 (%) | 23.19 (%) | 654,033 | 2,772 | 37.72 (%) | 21.74 (%) | 10.1 Á÷Á¢ÀΰǺñ | |
24 | 10.2 Construction Equipment Cost | 1,406,491 | 842 | 12.33 (%) | 7.32 (%) | 185,949 | 788 | 10.72 (%) | 6.18 (%) | 10.2 °Ç¼³Àåºñ ºñ¿ë | |
26 | ¡¡ 1) Tool & Consumables | 801,904 | 480 | 7.03 (%) | 4.18 (%) | 166,858 | 707 | 9.62 (%) | 5.55 (%) | -1) µµ±¸ ¹× ¼Ò¸ðǰ | |
29 | ¡¡ 2) Temporary Material ¡¡¡¡¡¡(For Erection Jig etc) | 532,217 | 319 | 4.67 (%) | 2.77 (%) | 76,354 | 324 | 4.4 (%) | 2.54 (%) | -2) °¡¼³Àç(¼³Ä¡ Áö±× µî¿ë) | |
30 | ¡¡ 3) Management & Supervisory Staff | 1,093,732 | 655 | 9.59 (%) | 5.69 (%) | 169,817 | 720 | 9.79 (%) | 5.65 (%) | -3) °ü¸® ¹× °¨µ¶ Á÷¿ø | |
31 | ¡¡ 4) Indirect Labor | 421,378 | 252 | 3.69 (%) | 2.19 (%) | 25,450 | 108 | 1.47 (%) | 0.85 (%) | -4) °£Á¢³ëµ¿ | |
34 | ¡¡ 7) Temporary Facilities | 296,104 | 177 | 2.6 (%) | 1.54 (%) | 28,734 | 122 | 1.66 (%) | 0.96 (%) | -7) Àӽýü³ | |
35 | ¡¡ 8) Catering and Housekeeping | 323,208 | 193 | 2.83 (%) | 1.68 (%) | 46,652 | 198 | 2.69 (%) | 1.55 (%) | -8) ÄÉÀÌÅ͸µ ¹× ÇϿ콺ŰÇÎ | |
36 | ¡¡ 9) General Field Expenses | 107,337 | 64 | 0.94 (%) | 0.56 (%) | 6,896 | 29 | 0.4 (%) | 0.23 (%) | -9) ÀϹÝÇöÀå°æºñ | |
37 | ¡¡ 10) HSE | 64,801 | 39 | 0.57 (%) | 0.34 (%) | 4,216 | 18 | 0.24 (%) | 0.14 (%) | -10) HSE | |
38 | 10.4 ¿ÜÁÖºñ | 10.4 ¿ÜÁÖºñ | |||||||||
39 | ¡¡ 1) NDE | 322,867 | 193 | 2.83 (%) | 1.68 (%) | 39,899 | 169 | 2.3 (%) | 1.33 (%) | -1) ÀÓ»çüÇè | |
41 | ¡¡ 3) Painting Work | 621,931 | 372 | 5.45 (%) | 3.24 (%) | 77,972 | 330 | 4.5 (%) | 2.59 (%) | -3) ÆäÀÎÆÃ ÀÛ¾÷ | |
42 | ¡¡ 4) Acid Cleaning & PTFE Coating | 219,230 | 131 | 1.92 (%) | 1.14 (%) | 31,607 | 134 | 1.82 (%) | 1.05 (%) | -4) »ê ¼¼Ã´ ¹× PTFE ÄÚÆÃ | |
43 | ¡¡ 5) Calibration | 8,542 | 5 | 0.07 (%) | 0.04 (%) | 1,026 | 4 | 0.06 (%) | 0.03 (%) | -5) ±³Á¤ | |
44 | ¡¡ 6) Insulation Work | 731,718 | 438 | 6.42 (%) | 3.81 (%) | 218,625 | 927 | 12.61 (%) | 7.27 (%) | -6) ´Ü¿°ø»ç | |
48 | (2) Sub - Total (Construction) | 11,404,682 | 6,827 | 100.0 (%) | 59.38 (%) | 1,734,089 | 7,350 | 100.0 (%) | 57.65 (%) | (2) ¼Ò°è(°Ç¼³) | |
50 | ¡¡ 11.1 Advance payment bond | 30,749 | 18 | 30.0 (%) | 0.16 (%) | 4,762 | 20 | 30.61 (%) | 0.16 (%) | 11.1 ¼±Áö±Þº¸Áõ±Ý | |
51 | ¡¡ 11.2 Performance bond | 30,749 | 18 | 30.0 (%) | 0.16 (%) | 4,762 | 20 | 30.61 (%) | 0.16 (%) | 11.2 ÀÌÇຸÁõ | |
52 | ¡¡ 11.3 Warranty bond | 41,000 | 25 | 40.0 (%) | 0.21 (%) | 6,034 | 26 | 38.79 (%) | 0.2 (%) | 11.3 º¸Áõä±Ç | |
53 | (3) Sub - Total (Bond) | 102,498 | 61 | 100.0 (%) | 0.53 (%) | 15,557 | 66 | 100.0 (%) | 0.52 (%) | (3) ¼Ò°è(ä±Ç) | |
54 | (1)+(2)+(3) EPC Total | 18,309,621 | 10,960 | 0.0 (%) | 95.33 (%) | 2,876,224 | 12,191 | 0.0 (%) | 95.63 (%) | EPC ÇÕ°è | |
55 | ¢Â °£Á¢ºñ | ¢Â µû·Îºñ | |||||||||
56 | 1) °í¿ëº¸Çè·á | 45,868 | 27 | 5.12 (%) | 0.24 (%) | 6,606 | 28 | 5.02 (%) | 0.22 (%) | 1) °í¿ëº¸Çè | |
57 | 2) °Ç°º¸Çè·á | 157,866 | 94 | 17.62 (%) | 0.82 (%) | 23,186 | 98 | 17.62 (%) | 0.77 (%) | 2) °Ç°º¸Çè | |
58 | 3) ³ëÀÎÀå±â¿ä¾çº¸Çè·á | 20,223 | 12 | 2.26 (%) | 0.11 (%) | 3,002 | 13 | 2.28 (%) | 0.1 (%) | 3) ¶°µéÀå±â¾çº¸Çè·á | |
59 | 4) ¿¬±Ýº¸Çè·á | 200,394 | 120 | 22.37 (%) | 1.04 (%) | 29,432 | 125 | 22.37 (%) | 0.98 (%) | 4) ¿¬±Ýº¸Çè | |
60 | 5) ÅðÁ÷°øÁ¦ºÎ±Ýºñ | 102,424 | 61 | 11.43 (%) | 0.53 (%) | 15,043 | 64 | 11.43 (%) | 0.5 (%) | 5) ºÎºÐ°øÁ¦ºÎ±Ýºñ | |
61 | 6) ¾ÈÀü°ü¸®ºñ | 241,803 | 145 | 26.99 (%) | 1.26 (%) | 35,641 | 151 | 27.09 (%) | 1.18 (%) | 6) ¾ÈÀü°ü¸®ºñ | |
62 | 7) ±ÙÀ纸Çè·á | 11,936 | 7 | 1.33 (%) | 0.06 (%) | 1,699 | 7 | 1.29 (%) | 0.06 (%) | 7) ±ÙÀ纸Çè | |
64 | 9) ȯ°æº¸Á¸ºñ | 82,472 | 49 | 9.2 (%) | 0.43 (%) | 12,130 | 51 | 9.22 (%) | 0.4 (%) | 9) ȯ°æº¸Á¸ºñ | |
65 | 10) °Ç¼³±â°è´ë¿©ºñ | 32,989 | 20 | 3.68 (%) | 0.17 (%) | 4,852 | 21 | 3.69 (%) | 0.16 (%) | 10) °Ç¼³±â°è´ë¿©ºñ | |
66 | (4) Sub - Total (°£Á¢°ø»çºñ) | 895,975 | 536 | 100.0 (%) | 4.67 (%) | 131,589 | 558 | 100.0 (%) | 4.37 (%) | (4) ¼Ò°è(°£Á¢°ø»çºñ) | |
67 | (EPC + °£Á¢ºñ) ÃÑ ÇÕ°è | 19,205,596 | 11,496 | 0.0 (%) | 100.0 (%) | 3,007,814 | 12,749 | 0.0 (%) | 100.0 (%) | ÃÑ ÇÕ°è (EP+C) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
No | CODE | Description | Tank No. : Turkey SECL (1 ONE-FOOT) Shell Material : A516-70 Net Weight : 235.93 (Ton) Gross Weight : 261.359 (Ton) Welding Rod : 1.222 (Ton) | Tank No. : Turkey SECL (2 ONE-FOOT) Shell Material : A516-70 Net Weight : 422.955 (Ton) Gross Weight : 457.485 (Ton) Welding Rod : 1.495 (Ton) | ¿ø°¡³»¿ª | ||||||
Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | ||||
1 | FIXC | 1. ENG'G and Design | 150,000 | 636 | 13.31 (%) | 5.21 (%) | 150,000 | 355 | 7.94 (%) | 2.85 (%) | 1. ¼³°èºñ |
2 | 2. Material Cost | 2. Àç·áºñ | |||||||||
3 | MATC | 2.1 Main Material | 430,022 | 1,823 | 38.16 (%) | 14.94 (%) | 716,913 | 1,695 | 37.93 (%) | 13.62 (%) | 2.1 Main Steel ÀÚÀçºñ |
4 | ¡¡ 2.2 ¿ëÁ¢ºÀ ±¸¸Åºñ + Accessory | 2,831 | 2,317 | 0.25 (%) | 0.1 (%) | 6,234 | 4,170 | 0.33 (%) | 0.12 (%) | 2.2 ¾×¼¼¼¸® | |
7 | ¡¡ 2.5 Surrounding Pipe | 17,290 | 73 | 1.53 (%) | 0.6 (%) | 31,643 | 75 | 1.67 (%) | 0.6 (%) | 2.5 ÁÖº¯ ÆÄÀÌÇÁ | |
8 | ¡¡ 2.6 Insulation Material | 257,739 | 1,092 | 22.87 (%) | 8.95 (%) | 500,399 | 1,183 | 26.47 (%) | 9.51 (%) | 2.6 ´Ü¿Àç | |
9 | ¡¡ 2.7 Platform, handrail and Stairway for FD | 47,096 | 111 | 2.49 (%) | 0.89 (%) | 2.7 FDÀÇ Ç÷§Æû, ³°£ ¹× °è´Ü | |||||
12 | FABC | 3-1. Pre-fabrication (Bending, Cutting, Shop Weld) | 176,948 | 750 | 15.7 (%) | 6.15 (%) | 317,216 | 750 | 16.78 (%) | 6.03 (%) | 3-1. »çÀü Á¦ÀÛ(Àý°î, Àý´Ü, °øÀå ¿ëÁ¢) |
16 | 5. Shop Test and Inspection | 18,094 | 77 | 1.61 (%) | 0.63 (%) | 31,643 | 75 | 1.67 (%) | 0.6 (%) | 5. °øÀå Å×½ºÆ® ¹× °Ë»ç | |
17 | 6. (°øÀåÁ¦ÀÛºÐ) Á¦Ç°µµÀå+Ç¥¸éó¸®+»ê¼¼ | 31,765 | 135 | 2.82 (%) | 1.1 (%) | 52,984 | 125 | 2.8 (%) | 1.01 (%) | 6. Ç¥¸é Áغñ ¹× »ê¼º ¼¼Ã´À» Æ÷ÇÔÇÑ °øÀå ÆäÀÎÆÃ | |
18 | 7. Packing & Trans -portation | 42,219 | 179 | 3.75 (%) | 1.47 (%) | 36,058 | 85 | 1.91 (%) | 0.69 (%) | 7. Æ÷Àå ¹× ³»·ú¿î¼Û | |
21 | (1) Sub - Total (EP) | 1,126,908 | 4,776 | 100.0 (%) | 39.15 (%) | 1,890,187 | 4,469 | 100.0 (%) | 35.92 (%) | (1) ¼Ò°è(EP) | |
22 | 10. Constrcution Cost | 10. ¼³Ä¡ ºñ¿ë | |||||||||
23 | 10.1 Direct Labor Cost | 628,908 | 2,666 | 39.05 (%) | 21.85 (%) | 1,172,494 | 2,772 | 37.72 (%) | 22.28 (%) | 10.1 Á÷Á¢ÀΰǺñ | |
24 | 10.2 Construction Equipment Cost | 198,632 | 842 | 12.33 (%) | 6.9 (%) | 333,354 | 788 | 10.72 (%) | 6.33 (%) | 10.2 °Ç¼³Àåºñ ºñ¿ë | |
26 | ¡¡ 1) Tool & Consumables | 113,249 | 480 | 7.03 (%) | 3.93 (%) | 299,129 | 707 | 9.62 (%) | 5.68 (%) | -1) µµ±¸ ¹× ¼Ò¸ðǰ | |
29 | ¡¡ 2) Temporary Material ¡¡¡¡¡¡(For Erection Jig etc) | 75,163 | 319 | 4.67 (%) | 2.61 (%) | 136,881 | 324 | 4.4 (%) | 2.6 (%) | -2) °¡¼³Àç(¼³Ä¡ Áö±× µî¿ë) | |
30 | ¡¡ 3) Management & Supervisory Staff | 154,463 | 655 | 9.59 (%) | 5.37 (%) | 304,434 | 720 | 9.79 (%) | 5.78 (%) | -3) °ü¸® ¹× °¨µ¶ Á÷¿ø | |
31 | ¡¡ 4) Indirect Labor | 59,509 | 252 | 3.69 (%) | 2.07 (%) | 45,625 | 108 | 1.47 (%) | 0.87 (%) | -4) °£Á¢³ëµ¿ | |
34 | ¡¡ 7) Temporary Facilities | 41,817 | 177 | 2.6 (%) | 1.45 (%) | 51,512 | 122 | 1.66 (%) | 0.98 (%) | -7) Àӽýü³ | |
35 | ¡¡ 8) Catering and Housekeeping | 45,645 | 193 | 2.83 (%) | 1.59 (%) | 83,633 | 198 | 2.69 (%) | 1.59 (%) | -8) ÄÉÀÌÅ͸µ ¹× ÇϿ콺ŰÇÎ | |
36 | ¡¡ 9) General Field Expenses | 15,159 | 64 | 0.94 (%) | 0.53 (%) | 12,363 | 29 | 0.4 (%) | 0.23 (%) | -9) ÀϹÝÇöÀå°æºñ | |
37 | ¡¡ 10) HSE | 9,151 | 39 | 0.57 (%) | 0.32 (%) | 7,557 | 18 | 0.24 (%) | 0.14 (%) | -10) HSE | |
38 | 10.4 ¿ÜÁÖºñ | 10.4 ¿ÜÁÖºñ | |||||||||
39 | ¡¡ 1) NDE | 45,597 | 193 | 2.83 (%) | 1.58 (%) | 71,528 | 169 | 2.3 (%) | 1.36 (%) | -1) ÀÓ»çüÇè | |
41 | ¡¡ 3) Painting Work | 87,832 | 372 | 5.45 (%) | 3.05 (%) | 139,781 | 330 | 4.5 (%) | 2.66 (%) | -3) ÆäÀÎÆÃ ÀÛ¾÷ | |
42 | ¡¡ 4) Acid Cleaning & PTFE Coating | 30,961 | 131 | 1.92 (%) | 1.08 (%) | 56,663 | 134 | 1.82 (%) | 1.08 (%) | -4) »ê ¼¼Ã´ ¹× PTFE ÄÚÆÃ | |
43 | ¡¡ 5) Calibration | 1,206 | 5 | 0.07 (%) | 0.04 (%) | 1,840 | 4 | 0.06 (%) | 0.03 (%) | -5) ±³Á¤ | |
44 | ¡¡ 6) Insulation Work | 103,337 | 438 | 6.42 (%) | 3.59 (%) | 391,933 | 927 | 12.61 (%) | 7.45 (%) | -6) ´Ü¿°ø»ç | |
48 | (2) Sub - Total (Construction) | 1,610,631 | 6,827 | 100.0 (%) | 55.95 (%) | 3,108,725 | 7,350 | 100.0 (%) | 59.07 (%) | (2) ¼Ò°è(°Ç¼³) | |
50 | ¡¡ 11.1 Advance payment bond | 4,343 | 18 | 30.0 (%) | 0.15 (%) | 8,536 | 20 | 30.61 (%) | 0.16 (%) | 11.1 ¼±Áö±Þº¸Áõ±Ý | |
51 | ¡¡ 11.2 Performance bond | 4,343 | 18 | 30.0 (%) | 0.15 (%) | 8,536 | 20 | 30.61 (%) | 0.16 (%) | 11.2 ÀÌÇຸÁõ | |
52 | ¡¡ 11.3 Warranty bond | 5,790 | 25 | 40.0 (%) | 0.2 (%) | 10,817 | 26 | 38.79 (%) | 0.21 (%) | 11.3 º¸Áõä±Ç | |
53 | (3) Sub - Total (Bond) | 14,475 | 61 | 100.0 (%) | 0.5 (%) | 27,890 | 66 | 100.0 (%) | 0.53 (%) | (3) ¼Ò°è(ä±Ç) | |
54 | (1)+(2)+(3) EPC Total | 2,752,014 | 11,665 | 0.0 (%) | 95.6 (%) | 5,026,801 | 11,885 | 0.0 (%) | 95.52 (%) | EPC ÇÕ°è | |
55 | ¢Â °£Á¢ºñ | ¢Â µû·Îºñ | |||||||||
56 | 1) °í¿ëº¸Çè·á | 6,478 | 27 | 5.12 (%) | 0.23 (%) | 11,842 | 28 | 5.02 (%) | 0.23 (%) | 1) °í¿ëº¸Çè | |
57 | 2) °Ç°º¸Çè·á | 22,295 | 94 | 17.62 (%) | 0.77 (%) | 41,565 | 98 | 17.62 (%) | 0.79 (%) | 2) °Ç°º¸Çè | |
58 | 3) ³ëÀÎÀå±â¿ä¾çº¸Çè·á | 2,856 | 12 | 2.26 (%) | 0.1 (%) | 5,383 | 13 | 2.28 (%) | 0.1 (%) | 3) ¶°µéÀå±â¾çº¸Çè·á | |
59 | 4) ¿¬±Ýº¸Çè·á | 28,301 | 120 | 22.37 (%) | 0.98 (%) | 52,762 | 125 | 22.37 (%) | 1.0 (%) | 4) ¿¬±Ýº¸Çè | |
60 | 5) ÅðÁ÷°øÁ¦ºÎ±Ýºñ | 14,465 | 61 | 11.43 (%) | 0.5 (%) | 26,967 | 64 | 11.43 (%) | 0.51 (%) | 5) ºÎºÐ°øÁ¦ºÎ±Ýºñ | |
61 | 6) ¾ÈÀü°ü¸®ºñ | 34,149 | 145 | 26.99 (%) | 1.19 (%) | 63,895 | 151 | 27.09 (%) | 1.21 (%) | 6) ¾ÈÀü°ü¸®ºñ | |
62 | 7) ±ÙÀ纸Çè·á | 1,686 | 7 | 1.33 (%) | 0.06 (%) | 3,045 | 7 | 1.29 (%) | 0.06 (%) | 7) ±ÙÀ纸Çè | |
64 | 9) ȯ°æº¸Á¸ºñ | 11,647 | 49 | 9.2 (%) | 0.4 (%) | 21,745 | 51 | 9.22 (%) | 0.41 (%) | 9) ȯ°æº¸Á¸ºñ | |
65 | 10) °Ç¼³±â°è´ë¿©ºñ | 4,659 | 20 | 3.68 (%) | 0.16 (%) | 8,698 | 21 | 3.69 (%) | 0.17 (%) | 10) °Ç¼³±â°è´ë¿©ºñ | |
66 | (4) Sub - Total (°£Á¢°ø»çºñ) | 126,534 | 536 | 100.0 (%) | 4.4 (%) | 235,902 | 558 | 100.0 (%) | 4.48 (%) | (4) ¼Ò°è(°£Á¢°ø»çºñ) | |
67 | (EPC + °£Á¢ºñ) ÃÑ ÇÕ°è | 2,878,549 | 12,201 | 0.0 (%) | 100.0 (%) | 5,262,704 | 12,443 | 0.0 (%) | 100.0 (%) | ÃÑ ÇÕ°è (EP+C) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
No | CODE | Description | Tank No. : Turkey SECL (2 ONE-FOOT) Shell Material : A516-70 Net Weight : 422.955 (Ton) Gross Weight : 457.485 (Ton) Welding Rod : 1.495 (Ton) | Tank No. : TK-002 (ONE-FOOT) Shell Material : A537-CL2 Net Weight : 657.274 (Ton) Gross Weight : 700.683 (Ton) Welding Rod : 1.753 (Ton) | ¿ø°¡³»¿ª | ||||||
Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | ||||
1 | FIXC | 1. ENG'G and Design | 150,000 | 355 | 8.21 (%) | 3.02 (%) | 150,000 | 228 | 5.29 (%) | 1.86 (%) | 1. ¼³°èºñ |
2 | 2. Material Cost | 2. Àç·áºñ | |||||||||
3 | MATC | 2.1 Main Material | 716,913 | 1,695 | 39.23 (%) | 14.43 (%) | 1,130,092 | 1,719 | 39.82 (%) | 13.99 (%) | 2.1 Main Steel ÀÚÀçºñ |
4 | ¡¡ 2.2 ¿ëÁ¢ºÀ ±¸¸Åºñ + Accessory | 6,234 | 4,170 | 0.34 (%) | 0.13 (%) | 10,349 | 5,903 | 0.36 (%) | 0.13 (%) | 2.2 ¾×¼¼¼¸® | |
7 | ¡¡ 2.5 Surrounding Pipe | 30,996 | 73 | 1.7 (%) | 0.62 (%) | 49,173 | 75 | 1.73 (%) | 0.61 (%) | 2.5 ÁÖº¯ ÆÄÀÌÇÁ | |
8 | ¡¡ 2.6 Insulation Material | 462,053 | 1,092 | 25.29 (%) | 9.3 (%) | 777,623 | 1,183 | 27.4 (%) | 9.63 (%) | 2.6 ´Ü¿Àç | |
9 | ¡¡ 2.7 Platform, handrail and Stairway for FD | 73,188 | 111 | 2.58 (%) | 0.91 (%) | 2.7 FDÀÇ Ç÷§Æû, ³°£ ¹× °è´Ü | |||||
12 | FABC | 3-1. Pre-fabrication (Bending, Cutting, Shop Weld) | 296,068 | 700 | 16.2 (%) | 5.96 (%) | 460,092 | 700 | 16.21 (%) | 5.69 (%) | 3-1. »çÀü Á¦ÀÛ(Àý°î, Àý´Ü, °øÀå ¿ëÁ¢) |
16 | 5. Shop Test and Inspection | 32,437 | 77 | 1.78 (%) | 0.65 (%) | 49,173 | 75 | 1.73 (%) | 0.61 (%) | 5. °øÀå Å×½ºÆ® ¹× °Ë»ç | |
17 | 6. (°øÀåÁ¦ÀÛºÐ) Á¦Ç°µµÀå+Ç¥¸éó¸®+»ê¼¼ | 56,946 | 135 | 3.12 (%) | 1.15 (%) | 82,337 | 125 | 2.9 (%) | 1.02 (%) | 6. Ç¥¸é Áغñ ¹× »ê¼º ¼¼Ã´À» Æ÷ÇÔÇÑ °øÀå ÆäÀÎÆÃ | |
18 | 7. Packing & Trans -portation | 75,687 | 179 | 4.14 (%) | 1.52 (%) | 56,035 | 85 | 1.97 (%) | 0.69 (%) | 7. Æ÷Àå ¹× ³»·ú¿î¼Û | |
21 | (1) Sub - Total (EP) | 1,827,335 | 4,320 | 100.0 (%) | 36.79 (%) | 2,838,061 | 4,318 | 100.0 (%) | 35.13 (%) | (1) ¼Ò°è(EP) | |
22 | 10. Constrcution Cost | 10. ¼³Ä¡ ºñ¿ë | |||||||||
23 | 10.1 Direct Labor Cost | 1,127,452 | 2,666 | 39.05 (%) | 22.7 (%) | 1,822,061 | 2,772 | 37.72 (%) | 22.55 (%) | 10.1 Á÷Á¢ÀΰǺñ | |
24 | 10.2 Construction Equipment Cost | 356,091 | 842 | 12.33 (%) | 7.17 (%) | 518,034 | 788 | 10.72 (%) | 6.41 (%) | 10.2 °Ç¼³Àåºñ ºñ¿ë | |
26 | ¡¡ 1) Tool & Consumables | 203,023 | 480 | 7.03 (%) | 4.09 (%) | 464,848 | 707 | 9.62 (%) | 5.75 (%) | -1) µµ±¸ ¹× ¼Ò¸ðǰ | |
29 | ¡¡ 2) Temporary Material ¡¡¡¡¡¡(For Erection Jig etc) | 134,745 | 319 | 4.67 (%) | 2.71 (%) | 212,713 | 324 | 4.4 (%) | 2.63 (%) | -2) °¡¼³Àç(¼³Ä¡ Áö±× µî¿ë) | |
30 | ¡¡ 3) Management & Supervisory Staff | 276,907 | 655 | 9.59 (%) | 5.57 (%) | 473,092 | 720 | 9.79 (%) | 5.86 (%) | -3) °ü¸® ¹× °¨µ¶ Á÷¿ø | |
31 | ¡¡ 4) Indirect Labor | 106,683 | 252 | 3.69 (%) | 2.15 (%) | 70,901 | 108 | 1.47 (%) | 0.88 (%) | -4) °£Á¢³ëµ¿ | |
34 | ¡¡ 7) Temporary Facilities | 74,967 | 177 | 2.6 (%) | 1.51 (%) | 80,049 | 122 | 1.66 (%) | 0.99 (%) | -7) Àӽýü³ | |
35 | ¡¡ 8) Catering and Housekeeping | 81,829 | 193 | 2.83 (%) | 1.65 (%) | 129,966 | 198 | 2.69 (%) | 1.61 (%) | -8) ÄÉÀÌÅ͸µ ¹× ÇϿ콺ŰÇÎ | |
36 | ¡¡ 9) General Field Expenses | 27,175 | 64 | 0.94 (%) | 0.55 (%) | 19,212 | 29 | 0.4 (%) | 0.24 (%) | -9) ÀϹÝÇöÀå°æºñ | |
37 | ¡¡ 10) HSE | 16,406 | 39 | 0.57 (%) | 0.33 (%) | 11,744 | 18 | 0.24 (%) | 0.15 (%) | -10) HSE | |
38 | 10.4 ¿ÜÁÖºñ | 10.4 ¿ÜÁÖºñ | |||||||||
39 | ¡¡ 1) NDE | 81,742 | 193 | 2.83 (%) | 1.65 (%) | 111,154 | 169 | 2.3 (%) | 1.38 (%) | -1) ÀÓ»çüÇè | |
41 | ¡¡ 3) Painting Work | 157,459 | 372 | 5.45 (%) | 3.17 (%) | 217,220 | 330 | 4.5 (%) | 2.69 (%) | -3) ÆäÀÎÆÃ ÀÛ¾÷ | |
42 | ¡¡ 4) Acid Cleaning & PTFE Coating | 55,504 | 131 | 1.92 (%) | 1.12 (%) | 88,054 | 134 | 1.82 (%) | 1.09 (%) | -4) »ê ¼¼Ã´ ¹× PTFE ÄÚÆÃ | |
43 | ¡¡ 5) Calibration | 2,163 | 5 | 0.07 (%) | 0.04 (%) | 2,859 | 4 | 0.06 (%) | 0.04 (%) | -5) ±³Á¤ | |
44 | ¡¡ 6) Insulation Work | 185,254 | 438 | 6.42 (%) | 3.73 (%) | 609,065 | 927 | 12.61 (%) | 7.54 (%) | -6) ´Ü¿°ø»ç | |
48 | (2) Sub - Total (Construction) | 2,887,400 | 6,827 | 100.0 (%) | 58.13 (%) | 4,830,973 | 7,350 | 100.0 (%) | 59.8 (%) | (2) ¼Ò°è(°Ç¼³) | |
50 | ¡¡ 11.1 Advance payment bond | 7,785 | 18 | 30.0 (%) | 0.16 (%) | 13,265 | 20 | 30.61 (%) | 0.16 (%) | 11.1 ¼±Áö±Þº¸Áõ±Ý | |
51 | ¡¡ 11.2 Performance bond | 7,785 | 18 | 30.0 (%) | 0.16 (%) | 13,265 | 20 | 30.61 (%) | 0.16 (%) | 11.2 ÀÌÇຸÁõ | |
52 | ¡¡ 11.3 Warranty bond | 10,380 | 25 | 40.0 (%) | 0.21 (%) | 16,810 | 26 | 38.79 (%) | 0.21 (%) | 11.3 º¸Áõä±Ç | |
53 | (3) Sub - Total (Bond) | 25,950 | 61 | 100.0 (%) | 0.52 (%) | 43,341 | 66 | 100.0 (%) | 0.54 (%) | (3) ¼Ò°è(ä±Ç) | |
54 | (1)+(2)+(3) EPC Total | 4,740,685 | 11,208 | 0.0 (%) | 95.43 (%) | 7,712,375 | 11,734 | 0.0 (%) | 95.46 (%) | EPC ÇÕ°è | |
55 | ¢Â °£Á¢ºñ | ¢Â µû·Îºñ | |||||||||
56 | 1) °í¿ëº¸Çè·á | 11,613 | 27 | 5.12 (%) | 0.23 (%) | 18,403 | 28 | 5.02 (%) | 0.23 (%) | 1) °í¿ëº¸Çè | |
57 | 2) °Ç°º¸Çè·á | 39,968 | 94 | 17.62 (%) | 0.8 (%) | 64,592 | 98 | 17.62 (%) | 0.8 (%) | 2) °Ç°º¸Çè | |
58 | 3) ³ëÀÎÀå±â¿ä¾çº¸Çè·á | 5,120 | 12 | 2.26 (%) | 0.1 (%) | 8,364 | 13 | 2.28 (%) | 0.1 (%) | 3) ¶°µéÀå±â¾çº¸Çè·á | |
59 | 4) ¿¬±Ýº¸Çè·á | 50,735 | 120 | 22.37 (%) | 1.02 (%) | 81,993 | 125 | 22.37 (%) | 1.01 (%) | 4) ¿¬±Ýº¸Çè | |
60 | 5) ÅðÁ÷°øÁ¦ºÎ±Ýºñ | 25,931 | 61 | 11.43 (%) | 0.52 (%) | 41,907 | 64 | 11.43 (%) | 0.52 (%) | 5) ºÎºÐ°øÁ¦ºÎ±Ýºñ | |
61 | 6) ¾ÈÀü°ü¸®ºñ | 61,219 | 145 | 26.99 (%) | 1.23 (%) | 99,292 | 151 | 27.09 (%) | 1.23 (%) | 6) ¾ÈÀü°ü¸®ºñ | |
62 | 7) ±ÙÀ纸Çè·á | 3,022 | 7 | 1.33 (%) | 0.06 (%) | 4,732 | 7 | 1.29 (%) | 0.06 (%) | 7) ±ÙÀ纸Çè | |
64 | 9) ȯ°æº¸Á¸ºñ | 20,880 | 49 | 9.2 (%) | 0.42 (%) | 33,792 | 51 | 9.22 (%) | 0.42 (%) | 9) ȯ°æº¸Á¸ºñ | |
65 | 10) °Ç¼³±â°è´ë¿©ºñ | 8,352 | 20 | 3.68 (%) | 0.17 (%) | 13,517 | 21 | 3.69 (%) | 0.17 (%) | 10) °Ç¼³±â°è´ë¿©ºñ | |
66 | (4) Sub - Total (°£Á¢°ø»çºñ) | 226,840 | 536 | 100.0 (%) | 4.57 (%) | 366,593 | 558 | 100.0 (%) | 4.54 (%) | (4) ¼Ò°è(°£Á¢°ø»çºñ) | |
67 | (EPC + °£Á¢ºñ) ÃÑ ÇÕ°è | 4,967,525 | 11,745 | 0.0 (%) | 100.0 (%) | 8,078,968 | 12,292 | 0.0 (%) | 100.0 (%) | ÃÑ ÇÕ°è (EP+C) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
No | CODE | Description | Tank No. : [SECL] LP Ethylene Shell Material : A553-TYPE1 Net Weight : 578.822 (Ton) Gross Weight : 609.862 (Ton) Welding Rod : 3.009 (Ton) | Tank No. : [SECL] LP Ethylene Shell Material : A553-TYPE1 Net Weight : 994.42 (Ton) Gross Weight : 1059.941 (Ton) Welding Rod : 4.635 (Ton) | ¿ø°¡³»¿ª | ||||||
Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | ||||
1 | FIXC | 1. ENG'G and Design | 150,000 | 259 | 2.51 (%) | 1.46 (%) | 150,000 | 151 | 1.74 (%) | 0.91 (%) | 1. ¼³°èºñ |
2 | 2. Material Cost | 2. Àç·áºñ | |||||||||
3 | MATC | 2.1 Main Material | 4,242,810 | 7,330 | 70.89 (%) | 41.26 (%) | 5,924,935 | 5,958 | 68.74 (%) | 35.8 (%) | 2.1 Main Steel ÀÚÀçºñ |
4 | ¡¡ 2.2 ¿ëÁ¢ºÀ ±¸¸Åºñ + Accessory | 286,051 | 95,065 | 4.78 (%) | 2.78 (%) | 203,261 | 43,854 | 2.36 (%) | 1.23 (%) | 2.2 ¾×¼¼¼¸® | |
7 | ¡¡ 2.5 Surrounding Pipe | 42,418 | 73 | 0.71 (%) | 0.41 (%) | 74,397 | 75 | 0.86 (%) | 0.45 (%) | 2.5 ÁÖº¯ ÆÄÀÌÇÁ | |
8 | ¡¡ 2.6 Insulation Material | 632,328 | 1,092 | 10.57 (%) | 6.15 (%) | 1,176,501 | 1,183 | 13.65 (%) | 7.11 (%) | 2.6 ´Ü¿Àç | |
9 | ¡¡ 2.7 Platform, handrail and Stairway for FD | 110,730 | 111 | 1.28 (%) | 0.67 (%) | 2.7 FDÀÇ Ç÷§Æû, ³°£ ¹× °è´Ü | |||||
12 | FABC | 3-1. Pre-fabrication (Bending, Cutting, Shop Weld) | 405,175 | 700 | 6.77 (%) | 3.94 (%) | 696,094 | 700 | 8.08 (%) | 4.21 (%) | 3-1. »çÀü Á¦ÀÛ(Àý°î, Àý´Ü, °øÀå ¿ëÁ¢) |
16 | 5. Shop Test and Inspection | 44,391 | 77 | 0.74 (%) | 0.43 (%) | 74,397 | 75 | 0.86 (%) | 0.45 (%) | 5. °øÀå Å×½ºÆ® ¹× °Ë»ç | |
17 | 6. (°øÀåÁ¦ÀÛºÐ) Á¦Ç°µµÀå+Ç¥¸éó¸®+»ê¼¼ | 77,931 | 135 | 1.3 (%) | 0.76 (%) | 124,571 | 125 | 1.45 (%) | 0.75 (%) | 6. Ç¥¸é Áغñ ¹× »ê¼º ¼¼Ã´À» Æ÷ÇÔÇÑ °øÀå ÆäÀÎÆÃ | |
18 | 7. Packing & Trans -portation | 103,580 | 179 | 1.73 (%) | 1.01 (%) | 84,777 | 85 | 0.98 (%) | 0.51 (%) | 7. Æ÷Àå ¹× ³»·ú¿î¼Û | |
21 | (1) Sub - Total (EP) | 5,984,685 | 10,339 | 100.0 (%) | 58.2 (%) | 8,619,663 | 8,668 | 100.0 (%) | 52.09 (%) | (1) ¼Ò°è(EP) | |
22 | 10. Constrcution Cost | 10. ¼³Ä¡ ºñ¿ë | |||||||||
23 | 10.1 Direct Labor Cost | 1,542,940 | 2,666 | 39.05 (%) | 15.01 (%) | 2,756,679 | 2,772 | 37.72 (%) | 16.66 (%) | 10.1 Á÷Á¢ÀΰǺñ | |
24 | 10.2 Construction Equipment Cost | 487,317 | 842 | 12.33 (%) | 4.74 (%) | 783,757 | 788 | 10.72 (%) | 4.74 (%) | 10.2 °Ç¼³Àåºñ ºñ¿ë | |
26 | ¡¡ 1) Tool & Consumables | 277,842 | 480 | 7.03 (%) | 2.7 (%) | 703,291 | 707 | 9.62 (%) | 4.25 (%) | -1) µµ±¸ ¹× ¼Ò¸ðǰ | |
29 | ¡¡ 2) Temporary Material ¡¡¡¡¡¡(For Erection Jig etc) | 184,401 | 319 | 4.67 (%) | 1.79 (%) | 321,823 | 324 | 4.4 (%) | 1.94 (%) | -2) °¡¼³Àç(¼³Ä¡ Áö±× µî¿ë) | |
30 | ¡¡ 3) Management & Supervisory Staff | 378,953 | 655 | 9.59 (%) | 3.69 (%) | 715,763 | 720 | 9.79 (%) | 4.33 (%) | -3) °ü¸® ¹× °¨µ¶ Á÷¿ø | |
31 | ¡¡ 4) Indirect Labor | 145,998 | 252 | 3.69 (%) | 1.42 (%) | 107,269 | 108 | 1.47 (%) | 0.65 (%) | -4) °£Á¢³ëµ¿ | |
34 | ¡¡ 7) Temporary Facilities | 102,593 | 177 | 2.6 (%) | 1.0 (%) | 121,110 | 122 | 1.66 (%) | 0.73 (%) | -7) Àӽýü³ | |
35 | ¡¡ 8) Catering and Housekeeping | 111,984 | 193 | 2.83 (%) | 1.09 (%) | 196,632 | 198 | 2.69 (%) | 1.19 (%) | -8) ÄÉÀÌÅ͸µ ¹× ÇϿ콺ŰÇÎ | |
36 | ¡¡ 9) General Field Expenses | 37,190 | 64 | 0.94 (%) | 0.36 (%) | 29,067 | 29 | 0.4 (%) | 0.18 (%) | -9) ÀϹÝÇöÀå°æºñ | |
37 | ¡¡ 10) HSE | 22,452 | 39 | 0.57 (%) | 0.22 (%) | 17,768 | 18 | 0.24 (%) | 0.11 (%) | -10) HSE | |
38 | 10.4 ¿ÜÁÖºñ | 10.4 ¿ÜÁÖºñ | |||||||||
39 | ¡¡ 1) NDE | 111,866 | 193 | 2.83 (%) | 1.09 (%) | 168,170 | 169 | 2.3 (%) | 1.02 (%) | -1) ÀÓ»çüÇè | |
41 | ¡¡ 3) Painting Work | 215,485 | 372 | 5.45 (%) | 2.1 (%) | 328,642 | 330 | 4.5 (%) | 1.99 (%) | -3) ÆäÀÎÆÃ ÀÛ¾÷ | |
42 | ¡¡ 4) Acid Cleaning & PTFE Coating | 75,958 | 131 | 1.92 (%) | 0.74 (%) | 133,221 | 134 | 1.82 (%) | 0.81 (%) | -4) »ê ¼¼Ã´ ¹× PTFE ÄÚÆÃ | |
43 | ¡¡ 5) Calibration | 2,960 | 5 | 0.07 (%) | 0.03 (%) | 4,326 | 4 | 0.06 (%) | 0.03 (%) | -5) ±³Á¤ | |
44 | ¡¡ 6) Insulation Work | 253,523 | 438 | 6.42 (%) | 2.47 (%) | 921,482 | 927 | 12.61 (%) | 5.57 (%) | -6) ´Ü¿°ø»ç | |
48 | (2) Sub - Total (Construction) | 3,951,462 | 6,827 | 100.0 (%) | 38.43 (%) | 7,309,001 | 7,350 | 100.0 (%) | 44.17 (%) | (2) ¼Ò°è(°Ç¼³) | |
50 | ¡¡ 11.1 Advance payment bond | 10,654 | 18 | 30.0 (%) | 0.1 (%) | 20,069 | 20 | 30.61 (%) | 0.12 (%) | 11.1 ¼±Áö±Þº¸Áõ±Ý | |
51 | ¡¡ 11.2 Performance bond | 10,654 | 18 | 30.0 (%) | 0.1 (%) | 20,069 | 20 | 30.61 (%) | 0.12 (%) | 11.2 ÀÌÇຸÁõ | |
52 | ¡¡ 11.3 Warranty bond | 14,205 | 25 | 40.0 (%) | 0.14 (%) | 25,433 | 26 | 38.79 (%) | 0.15 (%) | 11.3 º¸Áõä±Ç | |
53 | (3) Sub - Total (Bond) | 35,513 | 61 | 100.0 (%) | 0.35 (%) | 65,572 | 66 | 100.0 (%) | 0.4 (%) | (3) ¼Ò°è(ä±Ç) | |
54 | (1)+(2)+(3) EPC Total | 9,971,660 | 17,228 | 0.0 (%) | 96.98 (%) | 15,994,236 | 16,084 | 0.0 (%) | 96.65 (%) | EPC ÇÕ°è | |
55 | ¢Â °£Á¢ºñ | ¢Â µû·Îºñ | |||||||||
56 | 1) °í¿ëº¸Çè·á | 15,892 | 27 | 5.12 (%) | 0.15 (%) | 27,843 | 28 | 5.02 (%) | 0.17 (%) | 1) °í¿ëº¸Çè | |
57 | 2) °Ç°º¸Çè·á | 54,697 | 94 | 17.62 (%) | 0.53 (%) | 97,725 | 98 | 17.62 (%) | 0.59 (%) | 2) °Ç°º¸Çè | |
58 | 3) ³ëÀÎÀå±â¿ä¾çº¸Çè·á | 7,007 | 12 | 2.26 (%) | 0.07 (%) | 12,655 | 13 | 2.28 (%) | 0.08 (%) | 3) ¶°µéÀå±â¾çº¸Çè·á | |
59 | 4) ¿¬±Ýº¸Çè·á | 69,432 | 120 | 22.37 (%) | 0.68 (%) | 124,051 | 125 | 22.37 (%) | 0.75 (%) | 4) ¿¬±Ýº¸Çè | |
60 | 5) ÅðÁ÷°øÁ¦ºÎ±Ýºñ | 35,488 | 61 | 11.43 (%) | 0.35 (%) | 63,403 | 64 | 11.43 (%) | 0.38 (%) | 5) ºÎºÐ°øÁ¦ºÎ±Ýºñ | |
61 | 6) ¾ÈÀü°ü¸®ºñ | 83,779 | 145 | 26.99 (%) | 0.81 (%) | 150,224 | 151 | 27.09 (%) | 0.91 (%) | 6) ¾ÈÀü°ü¸®ºñ | |
62 | 7) ±ÙÀ纸Çè·á | 4,136 | 7 | 1.33 (%) | 0.04 (%) | 7,160 | 7 | 1.29 (%) | 0.04 (%) | 7) ±ÙÀ纸Çè | |
64 | 9) ȯ°æº¸Á¸ºñ | 28,575 | 49 | 9.2 (%) | 0.28 (%) | 51,125 | 51 | 9.22 (%) | 0.31 (%) | 9) ȯ°æº¸Á¸ºñ | |
65 | 10) °Ç¼³±â°è´ë¿©ºñ | 11,430 | 20 | 3.68 (%) | 0.11 (%) | 20,450 | 21 | 3.69 (%) | 0.12 (%) | 10) °Ç¼³±â°è´ë¿©ºñ | |
66 | (4) Sub - Total (°£Á¢°ø»çºñ) | 310,435 | 536 | 100.0 (%) | 3.02 (%) | 554,636 | 558 | 100.0 (%) | 3.35 (%) | (4) ¼Ò°è(°£Á¢°ø»çºñ) | |
67 | (EPC + °£Á¢ºñ) ÃÑ ÇÕ°è | 10,282,095 | 17,764 | 0.0 (%) | 100.0 (%) | 16,548,872 | 16,642 | 0.0 (%) | 100.0 (%) | ÃÑ ÇÕ°è (EP+C) |
No | CODE | Description | Tank No. : [SECL] LP Ethylene Shell Material : A553-TYPE1 Net Weight : 578.822 (Ton) Gross Weight : 609.862 (Ton) Welding Rod : 3.009 (Ton) | ¿ø°¡³»¿ª | PLATE ÀçÁúº° ±¸¸Å´Ü°¡ Å×À̺í | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | FIXC | 1. ENG'G and Design | 300,000 | 518 | 2.05 (%) | 1.12 (%) | 1. ¼³°èºñ |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2. Material Cost | 2. Àç·áºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 | MATC | 2.1 Main Material | 10,167,745 | 6,089 | 69.62 (%) | 37.9 (%) | 2.1 Main Steel ÀÚÀçºñ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | ¡¡ 2.2 ¿ëÁ¢ºÀ ±¸¸Åºñ + Accessory | 489,312 | 64,013 | 3.35 (%) | 1.82 (%) | 2.2 ¾×¼¼¼¸® | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7 | ¡¡ 2.5 Surrounding Pipe | 116,815 | 202 | 0.8 (%) | 0.44 (%) | 2.5 ÁÖº¯ ÆÄÀÌÇÁ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8 | ¡¡ 2.6 Insulation Material | 1,808,830 | 3,125 | 12.39 (%) | 6.74 (%) | 2.6 ´Ü¿Àç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | ¡¡ 2.7 Platform, handrail and Stairway for FD | 110,730 | 191 | 0.76 (%) | 0.41 (%) | 2.7 FDÀÇ Ç÷§Æû, ³°£ ¹× °è´Ü | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12 | FABC | 3-1. Pre-fabrication (Bending, Cutting, Shop Weld) | 1,101,269 | 1,903 | 7.54 (%) | 4.1 (%) | 3-1. »çÀü Á¦ÀÛ(Àý°î, Àý´Ü, °øÀå ¿ëÁ¢) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16 | 5. Shop Test and Inspection | 118,788 | 205 | 0.81 (%) | 0.44 (%) | 5. °øÀå Å×½ºÆ® ¹× °Ë»ç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17 | 6. (°øÀåÁ¦ÀÛºÐ) Á¦Ç°µµÀå+Ç¥¸éó¸®+»ê¼¼ | 202,502 | 350 | 1.39 (%) | 0.75 (%) | 6. Ç¥¸é Áغñ ¹× »ê¼º ¼¼Ã´À» Æ÷ÇÔÇÑ °øÀå ÆäÀÎÆÃ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
18 | 7. Packing & Trans -portation | 188,357 | 325 | 1.29 (%) | 0.7 (%) | 7. Æ÷Àå ¹× ³»·ú¿î¼Û | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
21 | (1) Sub - Total (EP) | 14,604,348 | 25,231 | 100.0 (%) | 54.43 (%) | (1) ¼Ò°è(EP) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
22 | 10. Constrcution Cost | 10. ¼³Ä¡ ºñ¿ë | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
23 | 10.1 Direct Labor Cost | 4,299,619 | 7,428 | 38.18 (%) | 16.02 (%) | 10.1 Á÷Á¢ÀΰǺñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
24 | 10.2 Construction Equipment Cost | 1,271,074 | 2,196 | 11.29 (%) | 4.74 (%) | 10.2 °Ç¼³Àåºñ ºñ¿ë | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
26 | ¡¡ 1) Tool & Consumables | 981,132 | 1,695 | 8.71 (%) | 3.66 (%) | -1) µµ±¸ ¹× ¼Ò¸ðǰ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
29 | ¡¡ 2) Temporary Material ¡¡¡¡¡¡(For Erection Jig etc) | 506,224 | 875 | 4.5 (%) | 1.89 (%) | -2) °¡¼³Àç(¼³Ä¡ Áö±× µî¿ë) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
30 | ¡¡ 3) Management & Supervisory Staff | 1,094,716 | 1,891 | 9.72 (%) | 4.08 (%) | -3) °ü¸® ¹× °¨µ¶ Á÷¿ø | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
31 | ¡¡ 4) Indirect Labor | 253,267 | 438 | 2.25 (%) | 0.94 (%) | -4) °£Á¢³ëµ¿ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
34 | ¡¡ 7) Temporary Facilities | 223,704 | 386 | 1.99 (%) | 0.83 (%) | -7) Àӽýü³ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
35 | ¡¡ 8) Catering and Housekeeping | 308,616 | 533 | 2.74 (%) | 1.15 (%) | -8) ÄÉÀÌÅ͸µ ¹× ÇϿ콺ŰÇÎ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
36 | ¡¡ 9) General Field Expenses | 66,257 | 114 | 0.59 (%) | 0.25 (%) | -9) ÀϹÝÇöÀå°æºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
37 | ¡¡ 10) HSE | 40,220 | 69 | 0.36 (%) | 0.15 (%) | -10) HSE | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
38 | 10.4 ¿ÜÁÖºñ | 10.4 ¿ÜÁÖºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
39 | ¡¡ 1) NDE | 280,036 | 484 | 2.49 (%) | 1.04 (%) | -1) ÀÓ»çüÇè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
41 | ¡¡ 3) Painting Work | 544,127 | 940 | 4.83 (%) | 2.03 (%) | -3) ÆäÀÎÆÃ ÀÛ¾÷ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
42 | ¡¡ 4) Acid Cleaning & PTFE Coating | 209,180 | 361 | 1.86 (%) | 0.78 (%) | -4) »ê ¼¼Ã´ ¹× PTFE ÄÚÆÃ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
43 | ¡¡ 5) Calibration | 7,285 | 13 | 0.06 (%) | 0.03 (%) | -5) ±³Á¤ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
44 | ¡¡ 6) Insulation Work | 1,175,006 | 2,030 | 10.43 (%) | 4.38 (%) | -6) ´Ü¿°ø»ç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
48 | (2) Sub - Total (Construction) | 11,260,463 | 19,454 | 100.0 (%) | 41.97 (%) | (2) ¼Ò°è(°Ç¼³) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
50 | ¡¡ 11.1 Advance payment bond | 30,723 | 53 | 30.39 (%) | 0.11 (%) | 11.1 ¼±Áö±Þº¸Áõ±Ý | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
51 | ¡¡ 11.2 Performance bond | 30,723 | 53 | 30.39 (%) | 0.11 (%) | 11.2 ÀÌÇຸÁõ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
52 | ¡¡ 11.3 Warranty bond | 39,639 | 68 | 39.21 (%) | 0.15 (%) | 11.3 º¸Áõä±Ç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
53 | (3) Sub - Total (Bond) | 101,085 | 175 | 100.0 (%) | 0.38 (%) | (3) ¼Ò°è(ä±Ç) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
54 | (1)+(2)+(3) EPC Total | 25,965,896 | 44,860 | 0.0 (%) | 96.78 (%) | EPC ÇÕ°è | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
55 | ¢Â °£Á¢ºñ | ¢Â µû·Îºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
56 | 1) °í¿ëº¸Çè·á | 43,735 | 76 | 5.06 (%) | 0.16 (%) | 1) °í¿ëº¸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
57 | 2) °Ç°º¸Çè·á | 152,422 | 263 | 17.62 (%) | 0.57 (%) | 2) °Ç°º¸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
58 | 3) ³ëÀÎÀå±â¿ä¾çº¸Çè·á | 19,662 | 34 | 2.27 (%) | 0.07 (%) | 3) ¶°µéÀå±â¾çº¸Çè·á | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
59 | 4) ¿¬±Ýº¸Çè·á | 193,483 | 334 | 22.37 (%) | 0.72 (%) | 4) ¿¬±Ýº¸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
60 | 5) ÅðÁ÷°øÁ¦ºÎ±Ýºñ | 98,891 | 171 | 11.43 (%) | 0.37 (%) | 5) ºÎºÐ°øÁ¦ºÎ±Ýºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
61 | 6) ¾ÈÀü°ü¸®ºñ | 234,003 | 404 | 27.05 (%) | 0.87 (%) | 6) ¾ÈÀü°ü¸®ºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
62 | 7) ±ÙÀ纸Çè·á | 11,296 | 20 | 1.31 (%) | 0.04 (%) | 7) ±ÙÀ纸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
64 | 9) ȯ°æº¸Á¸ºñ | 79,700 | 138 | 9.21 (%) | 0.3 (%) | 9) ȯ°æº¸Á¸ºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
65 | 10) °Ç¼³±â°è´ë¿©ºñ | 31,880 | 55 | 3.69 (%) | 0.12 (%) | 10) °Ç¼³±â°è´ë¿©ºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
66 | (4) Sub - Total (°£Á¢°ø»çºñ) | 865,071 | 1,495 | 100.0 (%) | 3.22 (%) | (4) ¼Ò°è(°£Á¢°ø»çºñ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
67 | (EPC + °£Á¢ºñ) ÃÑ ÇÕ°è | 26,830,967 | 46,354 | 0.0 (%) | 100.0 (%) | ÃÑ ÇÕ°è (EP+C) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
No | CODE | Description | Tank No. : ÇÑÈ-´ë»ê LPG Shell Material : A537-CL2+S5 Net Weight : 1799.714 (Ton) Gross Weight : 1875.898 (Ton) Welding Rod : 5.983 (Ton) | Tank No. : ÇÑÈ-´ë»ê LPG Shell Material : A537-CL2+S5 Net Weight : 2780.618 (Ton) Gross Weight : 2940.863 (Ton) Welding Rod : 6.317 (Ton) | ¿ø°¡³»¿ª | ||||||
Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | ||||
1 | FIXC | 1. ENG'G and Design | 150,000 | 83 | 1.92 (%) | 0.71 (%) | 150,000 | 54 | 1.27 (%) | 0.44 (%) | 1. ¼³°èºñ |
2 | 2. Material Cost | 2. Àç·áºñ | |||||||||
3 | MATC | 2.1 Main Material | 3,626,712 | 2,015 | 46.54 (%) | 17.14 (%) | 5,166,035 | 1,858 | 43.83 (%) | 15.21 (%) | 2.1 Main Steel ÀÚÀçºñ |
4 | ¡¡ 2.2 ¿ëÁ¢ºÀ ±¸¸Åºñ + Accessory | 45,700 | 7,638 | 0.59 (%) | 0.22 (%) | 62,953 | 9,966 | 0.53 (%) | 0.19 (%) | 2.2 ¾×¼¼¼¸® | |
7 | ¡¡ 2.5 Surrounding Pipe | 131,890 | 73 | 1.69 (%) | 0.62 (%) | 208,029 | 75 | 1.76 (%) | 0.61 (%) | 2.5 ÁÖº¯ ÆÄÀÌÇÁ | |
8 | ¡¡ 2.6 Insulation Material | 1,966,080 | 1,092 | 25.23 (%) | 9.29 (%) | 3,289,757 | 1,183 | 27.91 (%) | 9.69 (%) | 2.6 ´Ü¿Àç | |
9 | ¡¡ 2.7 Platform, handrail and Stairway for FD | 309,625 | 111 | 2.63 (%) | 0.91 (%) | 2.7 FDÀÇ Ç÷§Æû, ³°£ ¹× °è´Ü | |||||
12 | FABC | 3-1. Pre-fabrication (Bending, Cutting, Shop Weld) | 1,169,814 | 650 | 15.01 (%) | 5.53 (%) | 1,807,402 | 650 | 15.33 (%) | 5.32 (%) | 3-1. »çÀü Á¦ÀÛ(Àý°î, Àý´Ü, °øÀå ¿ëÁ¢) |
16 | 5. Shop Test and Inspection | 138,024 | 77 | 1.77 (%) | 0.65 (%) | 208,029 | 75 | 1.76 (%) | 0.61 (%) | 5. °øÀå Å×½ºÆ® ¹× °Ë»ç | |
17 | 6. (°øÀåÁ¦ÀÛºÐ) Á¦Ç°µµÀå+Ç¥¸éó¸®+»ê¼¼ | 242,310 | 135 | 3.11 (%) | 1.15 (%) | 348,328 | 125 | 2.96 (%) | 1.03 (%) | 6. Ç¥¸é Áغñ ¹× »ê¼º ¼¼Ã´À» Æ÷ÇÔÇÑ °øÀå ÆäÀÎÆÃ | |
18 | 7. Packing & Trans -portation | 322,057 | 179 | 4.13 (%) | 1.52 (%) | 237,056 | 85 | 2.01 (%) | 0.7 (%) | 7. Æ÷Àå ¹× ³»·ú¿î¼Û | |
21 | (1) Sub - Total (EP) | 7,792,586 | 4,330 | 100.0 (%) | 36.84 (%) | 11,787,214 | 4,239 | 100.0 (%) | 34.71 (%) | (1) ¼Ò°è(EP) | |
22 | 10. Constrcution Cost | 10. ¼³Ä¡ ºñ¿ë | |||||||||
23 | 10.1 Direct Labor Cost | 4,797,417 | 2,666 | 39.05 (%) | 22.68 (%) | 7,708,285 | 2,772 | 37.72 (%) | 22.7 (%) | 10.1 Á÷Á¢ÀΰǺñ | |
24 | 10.2 Construction Equipment Cost | 1,515,201 | 842 | 12.33 (%) | 7.16 (%) | 2,191,558 | 788 | 10.72 (%) | 6.45 (%) | 10.2 °Ç¼³Àåºñ ºñ¿ë | |
26 | ¡¡ 1) Tool & Consumables | 863,884 | 480 | 7.03 (%) | 4.08 (%) | 1,966,556 | 707 | 9.62 (%) | 5.79 (%) | -1) µµ±¸ ¹× ¼Ò¸ðǰ | |
29 | ¡¡ 2) Temporary Material ¡¡¡¡¡¡(For Erection Jig etc) | 573,353 | 319 | 4.67 (%) | 2.71 (%) | 899,889 | 324 | 4.4 (%) | 2.65 (%) | -2) °¡¼³Àç(¼³Ä¡ Áö±× µî¿ë) | |
30 | ¡¡ 3) Management & Supervisory Staff | 1,178,267 | 655 | 9.59 (%) | 5.57 (%) | 2,001,430 | 720 | 9.79 (%) | 5.89 (%) | -3) °ü¸® ¹× °¨µ¶ Á÷¿ø | |
31 | ¡¡ 4) Indirect Labor | 453,947 | 252 | 3.69 (%) | 2.15 (%) | 299,948 | 108 | 1.47 (%) | 0.88 (%) | -4) °£Á¢³ëµ¿ | |
34 | ¡¡ 7) Temporary Facilities | 318,990 | 177 | 2.6 (%) | 1.51 (%) | 338,651 | 122 | 1.66 (%) | 1.0 (%) | -7) Àӽýü³ | |
35 | ¡¡ 8) Catering and Housekeeping | 348,189 | 193 | 2.83 (%) | 1.65 (%) | 549,826 | 198 | 2.69 (%) | 1.62 (%) | -8) ÄÉÀÌÅ͸µ ¹× ÇϿ콺ŰÇÎ | |
36 | ¡¡ 9) General Field Expenses | 115,633 | 64 | 0.94 (%) | 0.55 (%) | 81,277 | 29 | 0.4 (%) | 0.24 (%) | -9) ÀϹÝÇöÀå°æºñ | |
37 | ¡¡ 10) HSE | 69,809 | 39 | 0.57 (%) | 0.33 (%) | 49,684 | 18 | 0.24 (%) | 0.15 (%) | -10) HSE | |
38 | 10.4 ¿ÜÁÖºñ | 10.4 ¿ÜÁÖºñ | |||||||||
39 | ¡¡ 1) NDE | 347,822 | 193 | 2.83 (%) | 1.64 (%) | 470,241 | 169 | 2.3 (%) | 1.38 (%) | -1) ÀÓ»çüÇè | |
41 | ¡¡ 3) Painting Work | 670,001 | 372 | 5.45 (%) | 3.17 (%) | 918,955 | 330 | 4.5 (%) | 2.71 (%) | -3) ÆäÀÎÆÃ ÀÛ¾÷ | |
42 | ¡¡ 4) Acid Cleaning & PTFE Coating | 236,175 | 131 | 1.92 (%) | 1.12 (%) | 372,517 | 134 | 1.82 (%) | 1.1 (%) | -4) »ê ¼¼Ã´ ¹× PTFE ÄÚÆÃ | |
43 | ¡¡ 5) Calibration | 9,202 | 5 | 0.07 (%) | 0.04 (%) | 12,096 | 4 | 0.06 (%) | 0.04 (%) | -5) ±³Á¤ | |
44 | ¡¡ 6) Insulation Work | 788,273 | 438 | 6.42 (%) | 3.73 (%) | 2,576,668 | 927 | 12.61 (%) | 7.59 (%) | -6) ´Ü¿°ø»ç | |
48 | (2) Sub - Total (Construction) | 12,286,163 | 6,827 | 100.0 (%) | 58.08 (%) | 20,437,581 | 7,350 | 100.0 (%) | 60.18 (%) | (2) ¼Ò°è(°Ç¼³) | |
50 | ¡¡ 11.1 Advance payment bond | 33,126 | 18 | 30.0 (%) | 0.16 (%) | 56,118 | 20 | 30.61 (%) | 0.17 (%) | 11.1 ¼±Áö±Þº¸Áõ±Ý | |
51 | ¡¡ 11.2 Performance bond | 33,126 | 18 | 30.0 (%) | 0.16 (%) | 56,118 | 20 | 30.61 (%) | 0.17 (%) | 11.2 ÀÌÇຸÁõ | |
52 | ¡¡ 11.3 Warranty bond | 44,169 | 25 | 40.0 (%) | 0.21 (%) | 71,117 | 26 | 38.79 (%) | 0.21 (%) | 11.3 º¸Áõä±Ç | |
53 | (3) Sub - Total (Bond) | 110,420 | 61 | 100.0 (%) | 0.52 (%) | 183,354 | 66 | 100.0 (%) | 0.54 (%) | (3) ¼Ò°è(ä±Ç) | |
54 | (1)+(2)+(3) EPC Total | 20,189,169 | 11,218 | 0.0 (%) | 95.44 (%) | 32,408,150 | 11,655 | 0.0 (%) | 95.43 (%) | EPC ÇÕ°è | |
55 | ¢Â °£Á¢ºñ | ¢Â µû·Îºñ | |||||||||
56 | 1) °í¿ëº¸Çè·á | 49,413 | 27 | 5.12 (%) | 0.23 (%) | 77,855 | 28 | 5.02 (%) | 0.23 (%) | 1) °í¿ëº¸Çè | |
57 | 2) °Ç°º¸Çè·á | 170,068 | 94 | 17.62 (%) | 0.8 (%) | 273,260 | 98 | 17.62 (%) | 0.8 (%) | 2) °Ç°º¸Çè | |
58 | 3) ³ëÀÎÀå±â¿ä¾çº¸Çè·á | 21,786 | 12 | 2.26 (%) | 0.1 (%) | 35,386 | 13 | 2.28 (%) | 0.1 (%) | 3) ¶°µéÀå±â¾çº¸Çè·á | |
59 | 4) ¿¬±Ýº¸Çè·á | 215,883 | 120 | 22.37 (%) | 1.02 (%) | 346,874 | 125 | 22.37 (%) | 1.02 (%) | 4) ¿¬±Ýº¸Çè | |
60 | 5) ÅðÁ÷°øÁ¦ºÎ±Ýºñ | 110,340 | 61 | 11.43 (%) | 0.52 (%) | 177,289 | 64 | 11.43 (%) | 0.52 (%) | 5) ºÎºÐ°øÁ¦ºÎ±Ýºñ | |
61 | 6) ¾ÈÀü°ü¸®ºñ | 260,492 | 145 | 26.99 (%) | 1.23 (%) | 420,060 | 151 | 27.09 (%) | 1.24 (%) | 6) ¾ÈÀü°ü¸®ºñ | |
62 | 7) ±ÙÀ纸Çè·á | 12,859 | 7 | 1.33 (%) | 0.06 (%) | 20,020 | 7 | 1.29 (%) | 0.06 (%) | 7) ±ÙÀ纸Çè | |
64 | 9) ȯ°æº¸Á¸ºñ | 88,846 | 49 | 9.2 (%) | 0.42 (%) | 142,957 | 51 | 9.22 (%) | 0.42 (%) | 9) ȯ°æº¸Á¸ºñ | |
65 | 10) °Ç¼³±â°è´ë¿©ºñ | 35,539 | 20 | 3.68 (%) | 0.17 (%) | 57,183 | 21 | 3.69 (%) | 0.17 (%) | 10) °Ç¼³±â°è´ë¿©ºñ | |
66 | (4) Sub - Total (°£Á¢°ø»çºñ) | 965,226 | 536 | 100.0 (%) | 4.56 (%) | 1,550,884 | 558 | 100.0 (%) | 4.57 (%) | (4) ¼Ò°è(°£Á¢°ø»çºñ) | |
67 | (EPC + °£Á¢ºñ) ÃÑ ÇÕ°è | 21,154,396 | 11,754 | 0.0 (%) | 100.0 (%) | 33,959,034 | 12,213 | 0.0 (%) | 100.0 (%) | ÃÑ ÇÕ°è (EP+C) |
No | CODE | Description | Tank No. : ÇÑÈ-´ë»ê LPG Shell Material : A537-CL2+S5 Net Weight : 1799.714 (Ton) Gross Weight : 1875.898 (Ton) Welding Rod : 5.983 (Ton) | ¿ø°¡³»¿ª | PLATE ÀçÁúº° ±¸¸Å´Ü°¡ Å×À̺í | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | FIXC | 1. ENG'G and Design | 300,000 | 167 | 1.53 (%) | 0.54 (%) | 1. ¼³°èºñ |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2. Material Cost | 2. Àç·áºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 | MATC | 2.1 Main Material | 8,792,747 | 1,825 | 44.91 (%) | 15.95 (%) | 2.1 Main Steel ÀÚÀçºñ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | ¡¡ 2.2 ¿ëÁ¢ºÀ ±¸¸Åºñ + Accessory | 108,653 | 8,834 | 0.55 (%) | 0.2 (%) | 2.2 ¾×¼¼¼¸® | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7 | ¡¡ 2.5 Surrounding Pipe | 339,919 | 189 | 1.74 (%) | 0.62 (%) | 2.5 ÁÖº¯ ÆÄÀÌÇÁ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8 | ¡¡ 2.6 Insulation Material | 5,255,837 | 2,920 | 26.84 (%) | 9.54 (%) | 2.6 ´Ü¿Àç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | ¡¡ 2.7 Platform, handrail and Stairway for FD | 309,625 | 172 | 1.58 (%) | 0.56 (%) | 2.7 FDÀÇ Ç÷§Æû, ³°£ ¹× °è´Ü | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12 | FABC | 3-1. Pre-fabrication (Bending, Cutting, Shop Weld) | 2,977,216 | 1,654 | 15.21 (%) | 5.4 (%) | 3-1. »çÀü Á¦ÀÛ(Àý°î, Àý´Ü, °øÀå ¿ëÁ¢) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16 | 5. Shop Test and Inspection | 346,053 | 192 | 1.77 (%) | 0.63 (%) | 5. °øÀå Å×½ºÆ® ¹× °Ë»ç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17 | 6. (°øÀåÁ¦ÀÛºÐ) Á¦Ç°µµÀå+Ç¥¸éó¸®+»ê¼¼ | 590,638 | 328 | 3.02 (%) | 1.07 (%) | 6. Ç¥¸é Áغñ ¹× »ê¼º ¼¼Ã´À» Æ÷ÇÔÇÑ °øÀå ÆäÀÎÆÃ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
18 | 7. Packing & Trans -portation | 559,113 | 311 | 2.86 (%) | 1.01 (%) | 7. Æ÷Àå ¹× ³»·ú¿î¼Û | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
21 | (1) Sub - Total (EP) | 19,579,801 | 10,879 | 100.0 (%) | 35.53 (%) | (1) ¼Ò°è(EP) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
22 | 10. Constrcution Cost | 10. ¼³Ä¡ ºñ¿ë | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
23 | 10.1 Direct Labor Cost | 12,505,701 | 6,949 | 38.22 (%) | 22.69 (%) | 10.1 Á÷Á¢ÀΰǺñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
24 | 10.2 Construction Equipment Cost | 3,706,759 | 2,060 | 11.33 (%) | 6.73 (%) | 10.2 °Ç¼³Àåºñ ºñ¿ë | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
26 | ¡¡ 1) Tool & Consumables | 2,830,440 | 1,573 | 8.65 (%) | 5.14 (%) | -1) µµ±¸ ¹× ¼Ò¸ðǰ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
29 | ¡¡ 2) Temporary Material ¡¡¡¡¡¡(For Erection Jig etc) | 1,473,242 | 819 | 4.5 (%) | 2.67 (%) | -2) °¡¼³Àç(¼³Ä¡ Áö±× µî¿ë) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
30 | ¡¡ 3) Management & Supervisory Staff | 3,179,698 | 1,767 | 9.72 (%) | 5.77 (%) | -3) °ü¸® ¹× °¨µ¶ Á÷¿ø | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
31 | ¡¡ 4) Indirect Labor | 753,895 | 419 | 2.3 (%) | 1.37 (%) | -4) °£Á¢³ëµ¿ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
34 | ¡¡ 7) Temporary Facilities | 657,642 | 365 | 2.01 (%) | 1.19 (%) | -7) Àӽýü³ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
35 | ¡¡ 8) Catering and Housekeeping | 898,014 | 499 | 2.74 (%) | 1.63 (%) | -8) ÄÉÀÌÅ͸µ ¹× ÇϿ콺ŰÇÎ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
36 | ¡¡ 9) General Field Expenses | 196,911 | 109 | 0.6 (%) | 0.36 (%) | -9) ÀϹÝÇöÀå°æºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
37 | ¡¡ 10) HSE | 119,493 | 66 | 0.37 (%) | 0.22 (%) | -10) HSE | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
38 | 10.4 ¿ÜÁÖºñ | 10.4 ¿ÜÁÖºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
39 | ¡¡ 1) NDE | 818,063 | 455 | 2.5 (%) | 1.48 (%) | -1) ÀÓ»çüÇè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
41 | ¡¡ 3) Painting Work | 1,588,956 | 883 | 4.86 (%) | 2.88 (%) | -3) ÆäÀÎÆÃ ÀÛ¾÷ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
42 | ¡¡ 4) Acid Cleaning & PTFE Coating | 608,691 | 338 | 1.86 (%) | 1.1 (%) | -4) »ê ¼¼Ã´ ¹× PTFE ÄÚÆÃ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
43 | ¡¡ 5) Calibration | 21,298 | 12 | 0.07 (%) | 0.04 (%) | -5) ±³Á¤ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
44 | ¡¡ 6) Insulation Work | 3,364,941 | 1,870 | 10.28 (%) | 6.11 (%) | -6) ´Ü¿°ø»ç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
48 | (2) Sub - Total (Construction) | 32,723,745 | 18,183 | 100.0 (%) | 59.38 (%) | (2) ¼Ò°è(°Ç¼³) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
50 | ¡¡ 11.1 Advance payment bond | 89,244 | 50 | 30.38 (%) | 0.16 (%) | 11.1 ¼±Áö±Þº¸Áõ±Ý | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
51 | ¡¡ 11.2 Performance bond | 89,244 | 50 | 30.38 (%) | 0.16 (%) | 11.2 ÀÌÇຸÁõ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
52 | ¡¡ 11.3 Warranty bond | 115,286 | 64 | 39.24 (%) | 0.21 (%) | 11.3 º¸Áõä±Ç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
53 | (3) Sub - Total (Bond) | 293,774 | 163 | 100.0 (%) | 0.53 (%) | (3) ¼Ò°è(ä±Ç) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
54 | (1)+(2)+(3) EPC Total | 52,597,319 | 29,225 | 0.0 (%) | 95.43 (%) | EPC ÇÕ°è | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
55 | ¢Â °£Á¢ºñ | ¢Â µû·Îºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
56 | 1) °í¿ëº¸Çè·á | 127,267 | 71 | 5.06 (%) | 0.23 (%) | 1) °í¿ëº¸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
57 | 2) °Ç°º¸Çè·á | 443,327 | 246 | 17.62 (%) | 0.8 (%) | 2) °Ç°º¸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
58 | 3) ³ëÀÎÀå±â¿ä¾çº¸Çè·á | 57,172 | 32 | 2.27 (%) | 0.1 (%) | 3) ¶°µéÀå±â¾çº¸Çè·á | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
59 | 4) ¿¬±Ýº¸Çè·á | 562,757 | 313 | 22.37 (%) | 1.02 (%) | 4) ¿¬±Ýº¸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
60 | 5) ÅðÁ÷°øÁ¦ºÎ±Ýºñ | 287,630 | 160 | 11.43 (%) | 0.52 (%) | 5) ºÎºÐ°øÁ¦ºÎ±Ýºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
61 | 6) ¾ÈÀü°ü¸®ºñ | 680,552 | 378 | 27.05 (%) | 1.23 (%) | 6) ¾ÈÀü°ü¸®ºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
62 | 7) ±ÙÀ纸Çè·á | 32,879 | 18 | 1.31 (%) | 0.06 (%) | 7) ±ÙÀ纸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
64 | 9) ȯ°æº¸Á¸ºñ | 231,804 | 129 | 9.21 (%) | 0.42 (%) | 9) ȯ°æº¸Á¸ºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
65 | 10) °Ç¼³±â°è´ë¿©ºñ | 92,722 | 52 | 3.69 (%) | 0.17 (%) | 10) °Ç¼³±â°è´ë¿©ºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
66 | (4) Sub - Total (°£Á¢°ø»çºñ) | 2,516,110 | 1,398 | 100.0 (%) | 4.57 (%) | (4) ¼Ò°è(°£Á¢°ø»çºñ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
67 | (EPC + °£Á¢ºñ) ÃÑ ÇÕ°è | 55,113,429 | 30,623 | 0.0 (%) | 100.0 (%) | ÃÑ ÇÕ°è (EP+C) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
No | CODE | Description | Tank No. : T-201 SUMBAWA 50000 KL LNG Shell Material : A553-TYPE1 Net Weight : 582.532 (Ton) Gross Weight : 613.721 (Ton) Welding Rod : 2.192 (Ton) | Tank No. : T-201 SUMBAWA 50000 KL LNG Shell Material : A553-TYPE1 Net Weight : 1369.067 (Ton) Gross Weight : 1475.775 (Ton) Welding Rod : 4.672 (Ton) | ¿ø°¡³»¿ª | ||||||
Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | ||||
1 | FIXC | 1. ENG'G and Design | 150,000 | 257 | 2.72 (%) | 1.53 (%) | 150,000 | 110 | 1.61 (%) | 0.74 (%) | 1. ¼³°èºñ |
2 | 2. Material Cost | 2. Àç·áºñ | |||||||||
3 | MATC | 2.1 Main Material | 3,840,894 | 6,593 | 69.72 (%) | 39.06 (%) | 5,852,614 | 4,275 | 62.93 (%) | 28.95 (%) | 2.1 Main Steel ÀÚÀçºñ |
4 | ¡¡ 2.2 ¿ëÁ¢ºÀ ±¸¸Åºñ + Accessory | 203,567 | 92,868 | 3.7 (%) | 2.07 (%) | 73,490 | 15,730 | 0.79 (%) | 0.36 (%) | 2.2 ¾×¼¼¼¸® | |
7 | ¡¡ 2.5 Surrounding Pipe | 42,690 | 73 | 0.77 (%) | 0.43 (%) | 102,425 | 75 | 1.1 (%) | 0.51 (%) | 2.5 ÁÖº¯ ÆÄÀÌÇÁ | |
8 | ¡¡ 2.6 Insulation Material | 636,381 | 1,092 | 11.55 (%) | 6.47 (%) | 1,619,747 | 1,183 | 17.42 (%) | 8.01 (%) | 2.6 ´Ü¿Àç | |
9 | ¡¡ 2.7 Platform, handrail and Stairway for FD | 152,447 | 111 | 1.64 (%) | 0.75 (%) | 2.7 FDÀÇ Ç÷§Æû, ³°£ ¹× °è´Ü | |||||
12 | FABC | 3-1. Pre-fabrication (Bending, Cutting, Shop Weld) | 407,772 | 700 | 7.4 (%) | 4.15 (%) | 958,347 | 700 | 10.31 (%) | 4.74 (%) | 3-1. »çÀü Á¦ÀÛ(Àý°î, Àý´Ü, °øÀå ¿ëÁ¢) |
16 | 5. Shop Test and Inspection | 44,676 | 77 | 0.81 (%) | 0.45 (%) | 102,425 | 75 | 1.1 (%) | 0.51 (%) | 5. °øÀå Å×½ºÆ® ¹× °Ë»ç | |
17 | 6. (°øÀåÁ¦ÀÛºÐ) Á¦Ç°µµÀå+Ç¥¸éó¸®+»ê¼¼ | 78,431 | 135 | 1.42 (%) | 0.8 (%) | 171,503 | 125 | 1.84 (%) | 0.85 (%) | 6. Ç¥¸é Áغñ ¹× »ê¼º ¼¼Ã´À» Æ÷ÇÔÇÑ °øÀå ÆäÀÎÆÃ | |
18 | 7. Packing & Trans -portation | 104,244 | 179 | 1.89 (%) | 1.06 (%) | 116,717 | 85 | 1.26 (%) | 0.58 (%) | 7. Æ÷Àå ¹× ³»·ú¿î¼Û | |
21 | (1) Sub - Total (EP) | 5,508,655 | 9,456 | 100.0 (%) | 56.02 (%) | 9,299,716 | 6,793 | 100.0 (%) | 46.0 (%) | (1) ¼Ò°è(EP) | |
22 | 10. Constrcution Cost | 10. ¼³Ä¡ ºñ¿ë | |||||||||
23 | 10.1 Direct Labor Cost | 1,552,829 | 2,666 | 39.05 (%) | 15.79 (%) | 3,795,256 | 2,772 | 37.72 (%) | 18.77 (%) | 10.1 Á÷Á¢ÀΰǺñ | |
24 | 10.2 Construction Equipment Cost | 490,441 | 842 | 12.33 (%) | 4.99 (%) | 1,079,037 | 788 | 10.72 (%) | 5.34 (%) | 10.2 °Ç¼³Àåºñ ºñ¿ë | |
26 | ¡¡ 1) Tool & Consumables | 279,622 | 480 | 7.03 (%) | 2.84 (%) | 968,255 | 707 | 9.62 (%) | 4.79 (%) | -1) µµ±¸ ¹× ¼Ò¸ðǰ | |
29 | ¡¡ 2) Temporary Material ¡¡¡¡¡¡(For Erection Jig etc) | 185,583 | 319 | 4.67 (%) | 1.89 (%) | 443,070 | 324 | 4.4 (%) | 2.19 (%) | -2) °¡¼³Àç(¼³Ä¡ Áö±× µî¿ë) | |
30 | ¡¡ 3) Management & Supervisory Staff | 381,382 | 655 | 9.59 (%) | 3.88 (%) | 985,426 | 720 | 9.79 (%) | 4.87 (%) | -3) °ü¸® ¹× °¨µ¶ Á÷¿ø | |
31 | ¡¡ 4) Indirect Labor | 146,934 | 252 | 3.69 (%) | 1.49 (%) | 147,683 | 108 | 1.47 (%) | 0.73 (%) | -4) °£Á¢³ëµ¿ | |
34 | ¡¡ 7) Temporary Facilities | 103,251 | 177 | 2.6 (%) | 1.05 (%) | 166,739 | 122 | 1.66 (%) | 0.82 (%) | -7) Àӽýü³ | |
35 | ¡¡ 8) Catering and Housekeeping | 112,702 | 193 | 2.83 (%) | 1.15 (%) | 270,712 | 198 | 2.69 (%) | 1.34 (%) | -8) ÄÉÀÌÅ͸µ ¹× ÇϿ콺ŰÇÎ | |
36 | ¡¡ 9) General Field Expenses | 37,428 | 64 | 0.94 (%) | 0.38 (%) | 40,018 | 29 | 0.4 (%) | 0.2 (%) | -9) ÀϹÝÇöÀå°æºñ | |
37 | ¡¡ 10) HSE | 22,596 | 39 | 0.57 (%) | 0.23 (%) | 24,462 | 18 | 0.24 (%) | 0.12 (%) | -10) HSE | |
38 | 10.4 ¿ÜÁÖºñ | 10.4 ¿ÜÁÖºñ | |||||||||
39 | ¡¡ 1) NDE | 112,583 | 193 | 2.83 (%) | 1.14 (%) | 231,528 | 169 | 2.3 (%) | 1.15 (%) | -1) ÀÓ»çüÇè | |
41 | ¡¡ 3) Painting Work | 216,866 | 372 | 5.45 (%) | 2.21 (%) | 452,457 | 330 | 4.5 (%) | 2.24 (%) | -3) ÆäÀÎÆÃ ÀÛ¾÷ | |
42 | ¡¡ 4) Acid Cleaning & PTFE Coating | 76,445 | 131 | 1.92 (%) | 0.78 (%) | 183,413 | 134 | 1.82 (%) | 0.91 (%) | -4) »ê ¼¼Ã´ ¹× PTFE ÄÚÆÃ | |
43 | ¡¡ 5) Calibration | 2,978 | 5 | 0.07 (%) | 0.03 (%) | 5,955 | 4 | 0.06 (%) | 0.03 (%) | -5) ±³Á¤ | |
44 | ¡¡ 6) Insulation Work | 255,148 | 438 | 6.42 (%) | 2.59 (%) | 1,268,650 | 927 | 12.61 (%) | 6.28 (%) | -6) ´Ü¿°ø»ç | |
48 | (2) Sub - Total (Construction) | 3,976,789 | 6,827 | 100.0 (%) | 40.44 (%) | 10,062,662 | 7,350 | 100.0 (%) | 49.78 (%) | (2) ¼Ò°è(°Ç¼³) | |
50 | ¡¡ 11.1 Advance payment bond | 10,722 | 18 | 30.0 (%) | 0.11 (%) | 27,631 | 20 | 30.61 (%) | 0.14 (%) | 11.1 ¼±Áö±Þº¸Áõ±Ý | |
51 | ¡¡ 11.2 Performance bond | 10,722 | 18 | 30.0 (%) | 0.11 (%) | 27,631 | 20 | 30.61 (%) | 0.14 (%) | 11.2 ÀÌÇຸÁõ | |
52 | ¡¡ 11.3 Warranty bond | 14,297 | 25 | 40.0 (%) | 0.15 (%) | 35,015 | 26 | 38.79 (%) | 0.17 (%) | 11.3 º¸Áõä±Ç | |
53 | (3) Sub - Total (Bond) | 35,741 | 61 | 100.0 (%) | 0.36 (%) | 90,276 | 66 | 100.0 (%) | 0.45 (%) | (3) ¼Ò°è(ä±Ç) | |
54 | (1)+(2)+(3) EPC Total | 9,521,185 | 16,344 | 0.0 (%) | 96.82 (%) | 19,452,654 | 14,209 | 0.0 (%) | 96.22 (%) | EPC ÇÕ°è | |
55 | ¢Â °£Á¢ºñ | ¢Â µû·Îºñ | |||||||||
56 | 1) °í¿ëº¸Çè·á | 15,994 | 27 | 5.12 (%) | 0.16 (%) | 38,333 | 28 | 5.02 (%) | 0.19 (%) | 1) °í¿ëº¸Çè | |
57 | 2) °Ç°º¸Çè·á | 55,048 | 94 | 17.62 (%) | 0.56 (%) | 134,542 | 98 | 17.62 (%) | 0.67 (%) | 2) °Ç°º¸Çè | |
58 | 3) ³ëÀÎÀå±â¿ä¾çº¸Çè·á | 7,052 | 12 | 2.26 (%) | 0.07 (%) | 17,423 | 13 | 2.28 (%) | 0.09 (%) | 3) ¶°µéÀå±â¾çº¸Çè·á | |
59 | 4) ¿¬±Ýº¸Çè·á | 69,877 | 120 | 22.37 (%) | 0.71 (%) | 170,787 | 125 | 22.37 (%) | 0.84 (%) | 4) ¿¬±Ýº¸Çè | |
60 | 5) ÅðÁ÷°øÁ¦ºÎ±Ýºñ | 35,715 | 61 | 11.43 (%) | 0.36 (%) | 87,290 | 64 | 11.43 (%) | 0.43 (%) | 5) ºÎºÐ°øÁ¦ºÎ±Ýºñ | |
61 | 6) ¾ÈÀü°ü¸®ºñ | 84,316 | 145 | 26.99 (%) | 0.86 (%) | 206,821 | 151 | 27.09 (%) | 1.02 (%) | 6) ¾ÈÀü°ü¸®ºñ | |
62 | 7) ±ÙÀ纸Çè·á | 4,162 | 7 | 1.33 (%) | 0.04 (%) | 9,857 | 7 | 1.29 (%) | 0.05 (%) | 7) ±ÙÀ纸Çè | |
64 | 9) ȯ°æº¸Á¸ºñ | 28,758 | 49 | 9.2 (%) | 0.29 (%) | 70,386 | 51 | 9.22 (%) | 0.35 (%) | 9) ȯ°æº¸Á¸ºñ | |
65 | 10) °Ç¼³±â°è´ë¿©ºñ | 11,503 | 20 | 3.68 (%) | 0.12 (%) | 28,155 | 21 | 3.69 (%) | 0.14 (%) | 10) °Ç¼³±â°è´ë¿©ºñ | |
66 | (4) Sub - Total (°£Á¢°ø»çºñ) | 312,425 | 536 | 100.0 (%) | 3.18 (%) | 763,594 | 558 | 100.0 (%) | 3.78 (%) | (4) ¼Ò°è(°£Á¢°ø»çºñ) | |
67 | (EPC + °£Á¢ºñ) ÃÑ ÇÕ°è | 9,833,609 | 16,881 | 0.0 (%) | 100.0 (%) | 20,216,248 | 14,766 | 0.0 (%) | 100.0 (%) | ÃÑ ÇÕ°è (EP+C) |
No | CODE | Description | Tank No. : T-201 SUMBAWA 50000 KL LNG Shell Material : A553-TYPE1 Net Weight : 582.532 (Ton) Gross Weight : 613.721 (Ton) Welding Rod : 2.192 (Ton) | ¿ø°¡³»¿ª | PLATE ÀçÁúº° ±¸¸Å´Ü°¡ Å×À̺í | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | FIXC | 1. ENG'G and Design | 300,000 | 515 | 2.03 (%) | 1.0 (%) | 1. ¼³°èºñ |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2. Material Cost | 2. Àç·áºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 | MATC | 2.1 Main Material | 9,693,507 | 4,639 | 65.46 (%) | 32.26 (%) | 2.1 Main Steel ÀÚÀçºñ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | ¡¡ 2.2 ¿ëÁ¢ºÀ ±¸¸Åºñ + Accessory | 277,057 | 40,364 | 1.87 (%) | 0.92 (%) | 2.2 ¾×¼¼¼¸® | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7 | ¡¡ 2.5 Surrounding Pipe | 145,116 | 249 | 0.98 (%) | 0.48 (%) | 2.5 ÁÖº¯ ÆÄÀÌÇÁ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8 | ¡¡ 2.6 Insulation Material | 2,256,129 | 3,873 | 15.24 (%) | 7.51 (%) | 2.6 ´Ü¿Àç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | ¡¡ 2.7 Platform, handrail and Stairway for FD | 152,447 | 262 | 1.03 (%) | 0.51 (%) | 2.7 FDÀÇ Ç÷§Æû, ³°£ ¹× °è´Ü | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12 | FABC | 3-1. Pre-fabrication (Bending, Cutting, Shop Weld) | 1,366,119 | 2,345 | 9.23 (%) | 4.55 (%) | 3-1. »çÀü Á¦ÀÛ(Àý°î, Àý´Ü, °øÀå ¿ëÁ¢) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16 | 5. Shop Test and Inspection | 147,101 | 253 | 0.99 (%) | 0.49 (%) | 5. °øÀå Å×½ºÆ® ¹× °Ë»ç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17 | 6. (°øÀåÁ¦ÀÛºÐ) Á¦Ç°µµÀå+Ç¥¸éó¸®+»ê¼¼ | 249,934 | 429 | 1.69 (%) | 0.83 (%) | 6. Ç¥¸é Áغñ ¹× »ê¼º ¼¼Ã´À» Æ÷ÇÔÇÑ °øÀå ÆäÀÎÆÃ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
18 | 7. Packing & Trans -portation | 220,961 | 379 | 1.49 (%) | 0.74 (%) | 7. Æ÷Àå ¹× ³»·ú¿î¼Û | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
21 | (1) Sub - Total (EP) | 14,808,370 | 25,421 | 100.0 (%) | 49.28 (%) | (1) ¼Ò°è(EP) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
22 | 10. Constrcution Cost | 10. ¼³Ä¡ ºñ¿ë | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
23 | 10.1 Direct Labor Cost | 5,348,086 | 9,181 | 38.09 (%) | 17.8 (%) | 10.1 Á÷Á¢ÀΰǺñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
24 | 10.2 Construction Equipment Cost | 1,569,478 | 2,694 | 11.18 (%) | 5.22 (%) | 10.2 °Ç¼³Àåºñ ºñ¿ë | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
26 | ¡¡ 1) Tool & Consumables | 1,247,877 | 2,142 | 8.89 (%) | 4.15 (%) | -1) µµ±¸ ¹× ¼Ò¸ðǰ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
29 | ¡¡ 2) Temporary Material ¡¡¡¡¡¡(For Erection Jig etc) | 628,653 | 1,079 | 4.48 (%) | 2.09 (%) | -2) °¡¼³Àç(¼³Ä¡ Áö±× µî¿ë) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
30 | ¡¡ 3) Management & Supervisory Staff | 1,366,808 | 2,346 | 9.74 (%) | 4.55 (%) | -3) °ü¸® ¹× °¨µ¶ Á÷¿ø | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
31 | ¡¡ 4) Indirect Labor | 294,616 | 506 | 2.1 (%) | 0.98 (%) | -4) °£Á¢³ëµ¿ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
34 | ¡¡ 7) Temporary Facilities | 269,990 | 463 | 1.92 (%) | 0.9 (%) | -7) Àӽýü³ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
35 | ¡¡ 8) Catering and Housekeeping | 383,414 | 658 | 2.73 (%) | 1.28 (%) | -8) ÄÉÀÌÅ͸µ ¹× ÇϿ콺ŰÇÎ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
36 | ¡¡ 9) General Field Expenses | 77,446 | 133 | 0.55 (%) | 0.26 (%) | -9) ÀϹÝÇöÀå°æºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
37 | ¡¡ 10) HSE | 47,058 | 81 | 0.34 (%) | 0.16 (%) | -10) HSE | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
38 | 10.4 ¿ÜÁÖºñ | 10.4 ¿ÜÁÖºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
39 | ¡¡ 1) NDE | 344,111 | 591 | 2.45 (%) | 1.15 (%) | -1) ÀÓ»çüÇè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
41 | ¡¡ 3) Painting Work | 669,324 | 1,149 | 4.77 (%) | 2.23 (%) | -3) ÆäÀÎÆÃ ÀÛ¾÷ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
42 | ¡¡ 4) Acid Cleaning & PTFE Coating | 259,858 | 446 | 1.85 (%) | 0.86 (%) | -4) »ê ¼¼Ã´ ¹× PTFE ÄÚÆÃ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
43 | ¡¡ 5) Calibration | 8,934 | 15 | 0.06 (%) | 0.03 (%) | -5) ±³Á¤ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
44 | ¡¡ 6) Insulation Work | 1,523,798 | 2,616 | 10.85 (%) | 5.07 (%) | -6) ´Ü¿°ø»ç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
48 | (2) Sub - Total (Construction) | 14,039,451 | 24,101 | 100.0 (%) | 46.72 (%) | (2) ¼Ò°è(°Ç¼³) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
50 | ¡¡ 11.1 Advance payment bond | 38,353 | 66 | 30.43 (%) | 0.13 (%) | 11.1 ¼±Áö±Þº¸Áõ±Ý | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
51 | ¡¡ 11.2 Performance bond | 38,353 | 66 | 30.43 (%) | 0.13 (%) | 11.2 ÀÌÇຸÁõ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
52 | ¡¡ 11.3 Warranty bond | 49,312 | 85 | 39.13 (%) | 0.16 (%) | 11.3 º¸Áõä±Ç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
53 | (3) Sub - Total (Bond) | 126,017 | 216 | 100.0 (%) | 0.42 (%) | (3) ¼Ò°è(ä±Ç) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
54 | (1)+(2)+(3) EPC Total | 28,973,838 | 49,738 | 0.0 (%) | 96.42 (%) | EPC ÇÕ°è | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
55 | ¢Â °£Á¢ºñ | ¢Â µû·Îºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
56 | 1) °í¿ëº¸Çè·á | 54,327 | 93 | 5.05 (%) | 0.18 (%) | 1) °í¿ëº¸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
57 | 2) °Ç°º¸Çè·á | 189,590 | 325 | 17.62 (%) | 0.63 (%) | 2) °Ç°º¸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
58 | 3) ³ëÀÎÀå±â¿ä¾çº¸Çè·á | 24,474 | 42 | 2.27 (%) | 0.08 (%) | 3) ¶°µéÀå±â¾çº¸Çè·á | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
59 | 4) ¿¬±Ýº¸Çè·á | 240,664 | 413 | 22.37 (%) | 0.8 (%) | 4) ¿¬±Ýº¸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
60 | 5) ÅðÁ÷°øÁ¦ºÎ±Ýºñ | 123,005 | 211 | 11.43 (%) | 0.41 (%) | 5) ºÎºÐ°øÁ¦ºÎ±Ýºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
61 | 6) ¾ÈÀü°ü¸®ºñ | 291,137 | 500 | 27.06 (%) | 0.97 (%) | 6) ¾ÈÀü°ü¸®ºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
62 | 7) ±ÙÀ纸Çè·á | 14,019 | 24 | 1.3 (%) | 0.05 (%) | 7) ±ÙÀ纸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
64 | 9) ȯ°æº¸Á¸ºñ | 99,144 | 170 | 9.21 (%) | 0.33 (%) | 9) ȯ°æº¸Á¸ºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
65 | 10) °Ç¼³±â°è´ë¿©ºñ | 39,658 | 68 | 3.69 (%) | 0.13 (%) | 10) °Ç¼³±â°è´ë¿©ºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
66 | (4) Sub - Total (°£Á¢°ø»çºñ) | 1,076,019 | 1,847 | 100.0 (%) | 3.58 (%) | (4) ¼Ò°è(°£Á¢°ø»çºñ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
67 | (EPC + °£Á¢ºñ) ÃÑ ÇÕ°è | 30,049,857 | 51,585 | 0.0 (%) | 100.0 (%) | ÃÑ ÇÕ°è (EP+C) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
No | CODE | Description | Tank No. : [T201] CAP2 LP Ethylene Shell Material : A553-TYPE1 Net Weight : 381.799 (Ton) Gross Weight : 408.6 (Ton) Welding Rod : 1.474 (Ton) | Tank No. : [T201] CAP2 LP Ethylene Shell Material : A553-TYPE1 Net Weight : 721.034 (Ton) Gross Weight : 786.077 (Ton) Welding Rod : 5.595 (Ton) | ¿ø°¡³»¿ª | ||||||
Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | ||||
1 | FIXC | 1. ENG'G and Design | 150,000 | 393 | 3.77 (%) | 2.2 (%) | 150,000 | 208 | 2.63 (%) | 1.31 (%) | 1. ¼³°èºñ |
2 | 2. Material Cost | 2. Àç·áºñ | |||||||||
3 | MATC | 2.1 Main Material | 2,842,630 | 7,445 | 71.41 (%) | 41.71 (%) | 3,649,768 | 5,062 | 64.05 (%) | 31.88 (%) | 2.1 Main Steel ÀÚÀçºñ |
4 | ¡¡ 2.2 ¿ëÁ¢ºÀ ±¸¸Åºñ + Accessory | 126,921 | 86,107 | 3.19 (%) | 1.86 (%) | 201,079 | 35,939 | 3.53 (%) | 1.76 (%) | 2.2 ¾×¼¼¼¸® | |
7 | ¡¡ 2.5 Surrounding Pipe | 27,980 | 73 | 0.7 (%) | 0.41 (%) | 53,943 | 75 | 0.95 (%) | 0.47 (%) | 2.5 ÁÖº¯ ÆÄÀÌÇÁ | |
8 | ¡¡ 2.6 Insulation Material | 417,092 | 1,092 | 10.48 (%) | 6.12 (%) | 853,057 | 1,183 | 14.97 (%) | 7.45 (%) | 2.6 ´Ü¿Àç | |
9 | ¡¡ 2.7 Platform, handrail and Stairway for FD | 80,288 | 111 | 1.41 (%) | 0.7 (%) | 2.7 FDÀÇ Ç÷§Æû, ³°£ ¹× °è´Ü | |||||
12 | FABC | 3-1. Pre-fabrication (Bending, Cutting, Shop Weld) | 267,259 | 700 | 6.71 (%) | 3.92 (%) | 504,724 | 700 | 8.86 (%) | 4.41 (%) | 3-1. »çÀü Á¦ÀÛ(Àý°î, Àý´Ü, °øÀå ¿ëÁ¢) |
16 | 5. Shop Test and Inspection | 29,281 | 77 | 0.74 (%) | 0.43 (%) | 53,943 | 75 | 0.95 (%) | 0.47 (%) | 5. °øÀå Å×½ºÆ® ¹× °Ë»ç | |
17 | 6. (°øÀåÁ¦ÀÛºÐ) Á¦Ç°µµÀå+Ç¥¸éó¸®+»ê¼¼ | 51,405 | 135 | 1.29 (%) | 0.75 (%) | 90,324 | 125 | 1.59 (%) | 0.79 (%) | 6. Ç¥¸é Áغñ ¹× »ê¼º ¼¼Ã´À» Æ÷ÇÔÇÑ °øÀå ÆäÀÎÆÃ | |
18 | 7. Packing & Trans -portation | 68,323 | 179 | 1.72 (%) | 1.0 (%) | 61,470 | 85 | 1.08 (%) | 0.54 (%) | 7. Æ÷Àå ¹× ³»·ú¿î¼Û | |
21 | (1) Sub - Total (EP) | 3,980,891 | 10,427 | 100.0 (%) | 58.41 (%) | 5,698,597 | 7,903 | 100.0 (%) | 49.78 (%) | (1) ¼Ò°è(EP) | |
22 | 10. Constrcution Cost | 10. ¼³Ä¡ ºñ¿ë | |||||||||
23 | 10.1 Direct Labor Cost | 1,017,744 | 2,666 | 39.05 (%) | 14.93 (%) | 1,998,813 | 2,772 | 37.72 (%) | 17.46 (%) | 10.1 Á÷Á¢ÀΰǺñ | |
24 | 10.2 Construction Equipment Cost | 321,441 | 842 | 12.33 (%) | 4.72 (%) | 568,287 | 788 | 10.72 (%) | 4.96 (%) | 10.2 °Ç¼³Àåºñ ºñ¿ë | |
26 | ¡¡ 1) Tool & Consumables | 183,268 | 480 | 7.03 (%) | 2.69 (%) | 509,942 | 707 | 9.62 (%) | 4.45 (%) | -1) µµ±¸ ¹× ¼Ò¸ðǰ | |
29 | ¡¡ 2) Temporary Material ¡¡¡¡¡¡(For Erection Jig etc) | 121,634 | 319 | 4.67 (%) | 1.78 (%) | 233,348 | 324 | 4.4 (%) | 2.04 (%) | -2) °¡¼³Àç(¼³Ä¡ Áö±× µî¿ë) | |
30 | ¡¡ 3) Management & Supervisory Staff | 249,963 | 655 | 9.59 (%) | 3.67 (%) | 518,985 | 720 | 9.79 (%) | 4.53 (%) | -3) °ü¸® ¹× °¨µ¶ Á÷¿ø | |
31 | ¡¡ 4) Indirect Labor | 96,302 | 252 | 3.69 (%) | 1.41 (%) | 77,779 | 108 | 1.47 (%) | 0.68 (%) | -4) °£Á¢³ëµ¿ | |
34 | ¡¡ 7) Temporary Facilities | 67,672 | 177 | 2.6 (%) | 0.99 (%) | 87,815 | 122 | 1.66 (%) | 0.77 (%) | -7) Àӽýü³ | |
35 | ¡¡ 8) Catering and Housekeeping | 73,866 | 193 | 2.83 (%) | 1.08 (%) | 142,574 | 198 | 2.69 (%) | 1.25 (%) | -8) ÄÉÀÌÅ͸µ ¹× ÇϿ콺ŰÇÎ | |
36 | ¡¡ 9) General Field Expenses | 24,531 | 64 | 0.94 (%) | 0.36 (%) | 21,076 | 29 | 0.4 (%) | 0.18 (%) | -9) ÀϹÝÇöÀå°æºñ | |
37 | ¡¡ 10) HSE | 14,810 | 39 | 0.57 (%) | 0.22 (%) | 12,883 | 18 | 0.24 (%) | 0.11 (%) | -10) HSE | |
38 | 10.4 ¿ÜÁÖºñ | 10.4 ¿ÜÁÖºñ | |||||||||
39 | ¡¡ 1) NDE | 73,788 | 193 | 2.83 (%) | 1.08 (%) | 121,937 | 169 | 2.3 (%) | 1.07 (%) | -1) ÀÓ»çüÇè | |
41 | ¡¡ 3) Painting Work | 142,137 | 372 | 5.45 (%) | 2.09 (%) | 238,292 | 330 | 4.5 (%) | 2.08 (%) | -3) ÆäÀÎÆÃ ÀÛ¾÷ | |
42 | ¡¡ 4) Acid Cleaning & PTFE Coating | 50,103 | 131 | 1.92 (%) | 0.74 (%) | 96,596 | 134 | 1.82 (%) | 0.84 (%) | -4) »ê ¼¼Ã´ ¹× PTFE ÄÚÆÃ | |
43 | ¡¡ 5) Calibration | 1,952 | 5 | 0.07 (%) | 0.03 (%) | 3,136 | 4 | 0.06 (%) | 0.03 (%) | -5) ±³Á¤ | |
44 | ¡¡ 6) Insulation Work | 167,228 | 438 | 6.42 (%) | 2.45 (%) | 668,148 | 927 | 12.61 (%) | 5.84 (%) | -6) ´Ü¿°ø»ç | |
48 | (2) Sub - Total (Construction) | 2,606,439 | 6,827 | 100.0 (%) | 38.24 (%) | 5,299,610 | 7,350 | 100.0 (%) | 46.29 (%) | (2) ¼Ò°è(°Ç¼³) | |
50 | ¡¡ 11.1 Advance payment bond | 7,027 | 18 | 30.0 (%) | 0.1 (%) | 14,552 | 20 | 30.61 (%) | 0.13 (%) | 11.1 ¼±Áö±Þº¸Áõ±Ý | |
51 | ¡¡ 11.2 Performance bond | 7,027 | 18 | 30.0 (%) | 0.1 (%) | 14,552 | 20 | 30.61 (%) | 0.13 (%) | 11.2 ÀÌÇຸÁõ | |
52 | ¡¡ 11.3 Warranty bond | 9,370 | 25 | 40.0 (%) | 0.14 (%) | 18,441 | 26 | 38.79 (%) | 0.16 (%) | 11.3 º¸Áõä±Ç | |
53 | (3) Sub - Total (Bond) | 23,425 | 61 | 100.0 (%) | 0.34 (%) | 47,545 | 66 | 100.0 (%) | 0.42 (%) | (3) ¼Ò°è(ä±Ç) | |
54 | (1)+(2)+(3) EPC Total | 6,610,755 | 17,315 | 0.0 (%) | 97.0 (%) | 11,045,752 | 15,319 | 0.0 (%) | 96.49 (%) | EPC ÇÕ°è | |
55 | ¢Â °£Á¢ºñ | ¢Â µû·Îºñ | |||||||||
56 | 1) °í¿ëº¸Çè·á | 10,483 | 27 | 5.12 (%) | 0.15 (%) | 20,188 | 28 | 5.02 (%) | 0.18 (%) | 1) °í¿ëº¸Çè | |
57 | 2) °Ç°º¸Çè·á | 36,079 | 94 | 17.62 (%) | 0.53 (%) | 70,858 | 98 | 17.62 (%) | 0.62 (%) | 2) °Ç°º¸Çè | |
58 | 3) ³ëÀÎÀå±â¿ä¾çº¸Çè·á | 4,622 | 12 | 2.26 (%) | 0.07 (%) | 9,176 | 13 | 2.28 (%) | 0.08 (%) | 3) ¶°µéÀå±â¾çº¸Çè·á | |
59 | 4) ¿¬±Ýº¸Çè·á | 45,798 | 120 | 22.37 (%) | 0.67 (%) | 89,947 | 125 | 22.37 (%) | 0.79 (%) | 4) ¿¬±Ýº¸Çè | |
60 | 5) ÅðÁ÷°øÁ¦ºÎ±Ýºñ | 23,408 | 61 | 11.43 (%) | 0.34 (%) | 45,972 | 64 | 11.43 (%) | 0.4 (%) | 5) ºÎºÐ°øÁ¦ºÎ±Ýºñ | |
61 | 6) ¾ÈÀü°ü¸®ºñ | 55,262 | 145 | 26.99 (%) | 0.81 (%) | 108,924 | 151 | 27.09 (%) | 0.95 (%) | 6) ¾ÈÀü°ü¸®ºñ | |
62 | 7) ±ÙÀ纸Çè·á | 2,728 | 7 | 1.33 (%) | 0.04 (%) | 5,191 | 7 | 1.29 (%) | 0.05 (%) | 7) ±ÙÀ纸Çè | |
64 | 9) ȯ°æº¸Á¸ºñ | 18,848 | 49 | 9.2 (%) | 0.28 (%) | 37,070 | 51 | 9.22 (%) | 0.32 (%) | 9) ȯ°æº¸Á¸ºñ | |
65 | 10) °Ç¼³±â°è´ë¿©ºñ | 7,539 | 20 | 3.68 (%) | 0.11 (%) | 14,828 | 21 | 3.69 (%) | 0.13 (%) | 10) °Ç¼³±â°è´ë¿©ºñ | |
66 | (4) Sub - Total (°£Á¢°ø»çºñ) | 204,767 | 536 | 100.0 (%) | 3.0 (%) | 402,155 | 558 | 100.0 (%) | 3.51 (%) | (4) ¼Ò°è(°£Á¢°ø»çºñ) | |
67 | (EPC + °£Á¢ºñ) ÃÑ ÇÕ°è | 6,815,522 | 17,851 | 0.0 (%) | 100.0 (%) | 11,447,908 | 15,877 | 0.0 (%) | 100.0 (%) | ÃÑ ÇÕ°è (EP+C) |
No | CODE | Description | Tank No. : [T201] CAP2 LP Ethylene Shell Material : A553-TYPE1 Net Weight : 381.799 (Ton) Gross Weight : 408.6 (Ton) Welding Rod : 1.474 (Ton) | ¿ø°¡³»¿ª | PLATE ÀçÁúº° ±¸¸Å´Ü°¡ Å×À̺í | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | FIXC | 1. ENG'G and Design | 300,000 | 786 | 3.1 (%) | 1.64 (%) | 1. ¼³°èºñ |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2. Material Cost | 2. Àç·áºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 | MATC | 2.1 Main Material | 6,492,398 | 5,434 | 67.07 (%) | 35.55 (%) | 2.1 Main Steel ÀÚÀçºñ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | ¡¡ 2.2 ¿ëÁ¢ºÀ ±¸¸Åºñ + Accessory | 328,000 | 46,400 | 3.39 (%) | 1.8 (%) | 2.2 ¾×¼¼¼¸® | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7 | ¡¡ 2.5 Surrounding Pipe | 81,923 | 215 | 0.85 (%) | 0.45 (%) | 2.5 ÁÖº¯ ÆÄÀÌÇÁ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8 | ¡¡ 2.6 Insulation Material | 1,270,150 | 3,327 | 13.12 (%) | 6.95 (%) | 2.6 ´Ü¿Àç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | ¡¡ 2.7 Platform, handrail and Stairway for FD | 80,288 | 210 | 0.83 (%) | 0.44 (%) | 2.7 FDÀÇ Ç÷§Æû, ³°£ ¹× °è´Ü | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12 | FABC | 3-1. Pre-fabrication (Bending, Cutting, Shop Weld) | 771,983 | 2,022 | 7.98 (%) | 4.23 (%) | 3-1. »çÀü Á¦ÀÛ(Àý°î, Àý´Ü, °øÀå ¿ëÁ¢) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16 | 5. Shop Test and Inspection | 83,224 | 218 | 0.86 (%) | 0.46 (%) | 5. °øÀå Å×½ºÆ® ¹× °Ë»ç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17 | 6. (°øÀåÁ¦ÀÛºÐ) Á¦Ç°µµÀå+Ç¥¸éó¸®+»ê¼¼ | 141,729 | 371 | 1.46 (%) | 0.78 (%) | 6. Ç¥¸é Áغñ ¹× »ê¼º ¼¼Ã´À» Æ÷ÇÔÇÑ °øÀå ÆäÀÎÆÃ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
18 | 7. Packing & Trans -portation | 129,793 | 340 | 1.34 (%) | 0.71 (%) | 7. Æ÷Àå ¹× ³»·ú¿î¼Û | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
21 | (1) Sub - Total (EP) | 9,679,488 | 25,352 | 100.0 (%) | 53.0 (%) | (1) ¼Ò°è(EP) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
22 | 10. Constrcution Cost | 10. ¼³Ä¡ ºñ¿ë | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
23 | 10.1 Direct Labor Cost | 3,016,557 | 7,901 | 38.16 (%) | 16.52 (%) | 10.1 Á÷Á¢ÀΰǺñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
24 | 10.2 Construction Equipment Cost | 889,728 | 2,330 | 11.25 (%) | 4.87 (%) | 10.2 °Ç¼³Àåºñ ºñ¿ë | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
26 | ¡¡ 1) Tool & Consumables | 693,210 | 1,816 | 8.77 (%) | 3.8 (%) | -1) µµ±¸ ¹× ¼Ò¸ðǰ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
29 | ¡¡ 2) Temporary Material ¡¡¡¡¡¡(For Erection Jig etc) | 354,981 | 930 | 4.49 (%) | 1.94 (%) | -2) °¡¼³Àç(¼³Ä¡ Áö±× µî¿ë) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
30 | ¡¡ 3) Management & Supervisory Staff | 768,948 | 2,014 | 9.73 (%) | 4.21 (%) | -3) °ü¸® ¹× °¨µ¶ Á÷¿ø | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
31 | ¡¡ 4) Indirect Labor | 174,081 | 456 | 2.2 (%) | 0.95 (%) | -4) °£Á¢³ëµ¿ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
34 | ¡¡ 7) Temporary Facilities | 155,487 | 407 | 1.97 (%) | 0.85 (%) | -7) Àӽýü³ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
35 | ¡¡ 8) Catering and Housekeeping | 216,440 | 567 | 2.74 (%) | 1.19 (%) | -8) ÄÉÀÌÅ͸µ ¹× ÇϿ콺ŰÇÎ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
36 | ¡¡ 9) General Field Expenses | 45,607 | 119 | 0.58 (%) | 0.25 (%) | -9) ÀϹÝÇöÀå°æºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
37 | ¡¡ 10) HSE | 27,693 | 73 | 0.35 (%) | 0.15 (%) | -10) HSE | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
38 | 10.4 ¿ÜÁÖºñ | 10.4 ¿ÜÁÖºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
39 | ¡¡ 1) NDE | 195,725 | 513 | 2.48 (%) | 1.07 (%) | -1) ÀÓ»çüÇè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
41 | ¡¡ 3) Painting Work | 380,429 | 996 | 4.81 (%) | 2.08 (%) | -3) ÆäÀÎÆÃ ÀÛ¾÷ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
42 | ¡¡ 4) Acid Cleaning & PTFE Coating | 146,699 | 384 | 1.86 (%) | 0.8 (%) | -4) »ê ¼¼Ã´ ¹× PTFE ÄÚÆÃ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
43 | ¡¡ 5) Calibration | 5,089 | 13 | 0.06 (%) | 0.03 (%) | -5) ±³Á¤ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
44 | ¡¡ 6) Insulation Work | 835,376 | 2,188 | 10.57 (%) | 4.57 (%) | -6) ´Ü¿°ø»ç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
48 | (2) Sub - Total (Construction) | 7,906,049 | 20,707 | 100.0 (%) | 43.29 (%) | (2) ¼Ò°è(°Ç¼³) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
50 | ¡¡ 11.1 Advance payment bond | 21,579 | 57 | 30.41 (%) | 0.12 (%) | 11.1 ¼±Áö±Þº¸Áõ±Ý | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
51 | ¡¡ 11.2 Performance bond | 21,579 | 57 | 30.41 (%) | 0.12 (%) | 11.2 ÀÌÇຸÁõ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
52 | ¡¡ 11.3 Warranty bond | 27,811 | 73 | 39.19 (%) | 0.15 (%) | 11.3 º¸Áõä±Ç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
53 | (3) Sub - Total (Bond) | 70,970 | 186 | 100.0 (%) | 0.39 (%) | (3) ¼Ò°è(ä±Ç) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
54 | (1)+(2)+(3) EPC Total | 17,656,507 | 46,246 | 0.0 (%) | 96.68 (%) | EPC ÇÕ°è | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
55 | ¢Â °£Á¢ºñ | ¢Â µû·Îºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
56 | 1) °í¿ëº¸Çè·á | 30,671 | 80 | 5.05 (%) | 0.17 (%) | 1) °í¿ëº¸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
57 | 2) °Ç°º¸Çè·á | 106,937 | 280 | 17.62 (%) | 0.59 (%) | 2) °Ç°º¸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
58 | 3) ³ëÀÎÀå±â¿ä¾çº¸Çè·á | 13,798 | 36 | 2.27 (%) | 0.08 (%) | 3) ¶°µéÀå±â¾çº¸Çè·á | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
59 | 4) ¿¬±Ýº¸Çè·á | 135,745 | 356 | 22.37 (%) | 0.74 (%) | 4) ¿¬±Ýº¸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
60 | 5) ÅðÁ÷°øÁ¦ºÎ±Ýºñ | 69,381 | 182 | 11.43 (%) | 0.38 (%) | 5) ºÎºÐ°øÁ¦ºÎ±Ýºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
61 | 6) ¾ÈÀü°ü¸®ºñ | 164,186 | 430 | 27.05 (%) | 0.9 (%) | 6) ¾ÈÀü°ü¸®ºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
62 | 7) ±ÙÀ纸Çè·á | 7,919 | 21 | 1.3 (%) | 0.04 (%) | 7) ±ÙÀ纸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
64 | 9) ȯ°æº¸Á¸ºñ | 55,918 | 146 | 9.21 (%) | 0.31 (%) | 9) ȯ°æº¸Á¸ºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
65 | 10) °Ç¼³±â°è´ë¿©ºñ | 22,367 | 59 | 3.69 (%) | 0.12 (%) | 10) °Ç¼³±â°è´ë¿©ºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
66 | (4) Sub - Total (°£Á¢°ø»çºñ) | 606,922 | 1,590 | 100.0 (%) | 3.32 (%) | (4) ¼Ò°è(°£Á¢°ø»çºñ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
67 | (EPC + °£Á¢ºñ) ÃÑ ÇÕ°è | 18,263,429 | 47,835 | 0.0 (%) | 100.0 (%) | ÃÑ ÇÕ°è (EP+C) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
No | CODE | Description | Tank No. : [301] CAP2 Propane(C3/C4) Shell Material : A537-CL2+S5 Net Weight : 1507.391 (Ton) Gross Weight : 1581.69 (Ton) Welding Rod : 6.132 (Ton) | Tank No. : [301] CAP2 Propane(C3/C4) Shell Material : A537-CL2+S5 Net Weight : 2502.552 (Ton) Gross Weight : 2674.635 (Ton) Welding Rod : 10.339 (Ton) | ¿ø°¡³»¿ª | ||||||
Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | ||||
1 | FIXC | 1. ENG'G and Design | 150,000 | 100 | 2.27 (%) | 0.84 (%) | 150,000 | 60 | 1.42 (%) | 0.49 (%) | 1. ¼³°èºñ |
2 | 2. Material Cost | 2. Àç·áºñ | |||||||||
3 | MATC | 2.1 Main Material | 3,092,423 | 2,052 | 46.74 (%) | 17.37 (%) | 4,612,621 | 1,843 | 43.53 (%) | 15.1 (%) | 2.1 Main Steel ÀÚÀçºñ |
4 | ¡¡ 2.2 ¿ëÁ¢ºÀ ±¸¸Åºñ + Accessory | 49,041 | 7,998 | 0.74 (%) | 0.28 (%) | 67,189 | 6,499 | 0.63 (%) | 0.22 (%) | 2.2 ¾×¼¼¼¸® | |
7 | ¡¡ 2.5 Surrounding Pipe | 110,468 | 73 | 1.67 (%) | 0.62 (%) | 187,226 | 75 | 1.77 (%) | 0.61 (%) | 2.5 ÁÖº¯ ÆÄÀÌÇÁ | |
8 | ¡¡ 2.6 Insulation Material | 1,646,734 | 1,092 | 24.89 (%) | 9.25 (%) | 2,960,777 | 1,183 | 27.94 (%) | 9.69 (%) | 2.6 ´Ü¿Àç | |
9 | ¡¡ 2.7 Platform, handrail and Stairway for FD | 278,662 | 111 | 2.63 (%) | 0.91 (%) | 2.7 FDÀÇ Ç÷§Æû, ³°£ ¹× °è´Ü | |||||
12 | FABC | 3-1. Pre-fabrication (Bending, Cutting, Shop Weld) | 979,804 | 650 | 14.81 (%) | 5.5 (%) | 1,626,659 | 650 | 15.35 (%) | 5.32 (%) | 3-1. »çÀü Á¦ÀÛ(Àý°î, Àý´Ü, °øÀå ¿ëÁ¢) |
16 | 5. Shop Test and Inspection | 115,605 | 77 | 1.75 (%) | 0.65 (%) | 187,226 | 75 | 1.77 (%) | 0.61 (%) | 5. °øÀå Å×½ºÆ® ¹× °Ë»ç | |
17 | 6. (°øÀåÁ¦ÀÛºÐ) Á¦Ç°µµÀå+Ç¥¸éó¸®+»ê¼¼ | 202,952 | 135 | 3.07 (%) | 1.14 (%) | 313,495 | 125 | 2.96 (%) | 1.03 (%) | 6. Ç¥¸é Áغñ ¹× »ê¼º ¼¼Ã´À» Æ÷ÇÔÇÑ °øÀå ÆäÀÎÆÃ | |
18 | 7. Packing & Trans -portation | 269,746 | 179 | 4.08 (%) | 1.51 (%) | 213,350 | 85 | 2.01 (%) | 0.7 (%) | 7. Æ÷Àå ¹× ³»·ú¿î¼Û | |
21 | (1) Sub - Total (EP) | 6,616,774 | 4,390 | 100.0 (%) | 37.16 (%) | 10,597,204 | 4,235 | 100.0 (%) | 34.69 (%) | (1) ¼Ò°è(EP) | |
22 | 10. Constrcution Cost | 10. ¼³Ä¡ ºñ¿ë | |||||||||
23 | 10.1 Direct Labor Cost | 4,018,184 | 2,666 | 39.05 (%) | 22.56 (%) | 6,937,445 | 2,772 | 37.72 (%) | 22.71 (%) | 10.1 Á÷Á¢ÀΰǺñ | |
24 | 10.2 Construction Equipment Cost | 1,269,091 | 842 | 12.33 (%) | 7.13 (%) | 1,972,399 | 788 | 10.72 (%) | 6.46 (%) | 10.2 °Ç¼³Àåºñ ºñ¿ë | |
26 | ¡¡ 1) Tool & Consumables | 723,566 | 480 | 7.03 (%) | 4.06 (%) | 1,769,897 | 707 | 9.62 (%) | 5.79 (%) | -1) µµ±¸ ¹× ¼Ò¸ðǰ | |
29 | ¡¡ 2) Temporary Material ¡¡¡¡¡¡(For Erection Jig etc) | 480,225 | 319 | 4.67 (%) | 2.7 (%) | 809,898 | 324 | 4.4 (%) | 2.65 (%) | -2) °¡¼³Àç(¼³Ä¡ Áö±× µî¿ë) | |
30 | ¡¡ 3) Management & Supervisory Staff | 986,884 | 655 | 9.59 (%) | 5.54 (%) | 1,801,284 | 720 | 9.79 (%) | 5.9 (%) | -3) °ü¸® ¹× °¨µ¶ Á÷¿ø | |
31 | ¡¡ 4) Indirect Labor | 380,214 | 252 | 3.69 (%) | 2.14 (%) | 269,953 | 108 | 1.47 (%) | 0.88 (%) | -4) °£Á¢³ëµ¿ | |
34 | ¡¡ 7) Temporary Facilities | 267,178 | 177 | 2.6 (%) | 1.5 (%) | 304,786 | 122 | 1.66 (%) | 1.0 (%) | -7) Àӽýü³ | |
35 | ¡¡ 8) Catering and Housekeeping | 291,633 | 193 | 2.83 (%) | 1.64 (%) | 494,842 | 198 | 2.69 (%) | 1.62 (%) | -8) ÄÉÀÌÅ͸µ ¹× ÇϿ콺ŰÇÎ | |
36 | ¡¡ 9) General Field Expenses | 96,851 | 64 | 0.94 (%) | 0.54 (%) | 73,150 | 29 | 0.4 (%) | 0.24 (%) | -9) ÀϹÝÇöÀå°æºñ | |
37 | ¡¡ 10) HSE | 58,470 | 39 | 0.57 (%) | 0.33 (%) | 44,716 | 18 | 0.24 (%) | 0.15 (%) | -10) HSE | |
38 | 10.4 ¿ÜÁÖºñ | 10.4 ¿ÜÁÖºñ | |||||||||
39 | ¡¡ 1) NDE | 291,326 | 193 | 2.83 (%) | 1.64 (%) | 423,217 | 169 | 2.3 (%) | 1.39 (%) | -1) ÀÓ»çüÇè | |
41 | ¡¡ 3) Painting Work | 561,175 | 372 | 5.45 (%) | 3.15 (%) | 827,058 | 330 | 4.5 (%) | 2.71 (%) | -3) ÆäÀÎÆÃ ÀÛ¾÷ | |
42 | ¡¡ 4) Acid Cleaning & PTFE Coating | 197,813 | 131 | 1.92 (%) | 1.11 (%) | 335,264 | 134 | 1.82 (%) | 1.1 (%) | -4) »ê ¼¼Ã´ ¹× PTFE ÄÚÆÃ | |
43 | ¡¡ 5) Calibration | 7,707 | 5 | 0.07 (%) | 0.04 (%) | 10,886 | 4 | 0.06 (%) | 0.04 (%) | -5) ±³Á¤ | |
44 | ¡¡ 6) Insulation Work | 660,236 | 438 | 6.42 (%) | 3.71 (%) | 2,318,997 | 927 | 12.61 (%) | 7.59 (%) | -6) ´Ü¿°ø»ç | |
48 | (2) Sub - Total (Construction) | 10,290,553 | 6,827 | 100.0 (%) | 57.79 (%) | 18,393,792 | 7,350 | 100.0 (%) | 60.21 (%) | (2) ¼Ò°è(°Ç¼³) | |
50 | ¡¡ 11.1 Advance payment bond | 27,745 | 18 | 30.0 (%) | 0.16 (%) | 50,507 | 20 | 30.61 (%) | 0.17 (%) | 11.1 ¼±Áö±Þº¸Áõ±Ý | |
51 | ¡¡ 11.2 Performance bond | 27,745 | 18 | 30.0 (%) | 0.16 (%) | 50,507 | 20 | 30.61 (%) | 0.17 (%) | 11.2 ÀÌÇຸÁõ | |
52 | ¡¡ 11.3 Warranty bond | 36,994 | 25 | 40.0 (%) | 0.21 (%) | 64,005 | 26 | 38.79 (%) | 0.21 (%) | 11.3 º¸Áõä±Ç | |
53 | (3) Sub - Total (Bond) | 92,484 | 61 | 100.0 (%) | 0.52 (%) | 165,018 | 66 | 100.0 (%) | 0.54 (%) | (3) ¼Ò°è(ä±Ç) | |
54 | (1)+(2)+(3) EPC Total | 16,999,811 | 11,278 | 0.0 (%) | 95.46 (%) | 29,156,014 | 11,651 | 0.0 (%) | 95.43 (%) | EPC ÇÕ°è | |
55 | ¢Â °£Á¢ºñ | ¢Â µû·Îºñ | |||||||||
56 | 1) °í¿ëº¸Çè·á | 41,387 | 27 | 5.12 (%) | 0.23 (%) | 70,069 | 28 | 5.02 (%) | 0.23 (%) | 1) °í¿ëº¸Çè | |
57 | 2) °Ç°º¸Çè·á | 142,444 | 94 | 17.62 (%) | 0.8 (%) | 245,933 | 98 | 17.62 (%) | 0.8 (%) | 2) °Ç°º¸Çè | |
58 | 3) ³ëÀÎÀå±â¿ä¾çº¸Çè·á | 18,247 | 12 | 2.26 (%) | 0.1 (%) | 31,847 | 13 | 2.28 (%) | 0.1 (%) | 3) ¶°µéÀå±â¾çº¸Çè·á | |
59 | 4) ¿¬±Ýº¸Çè·á | 180,818 | 120 | 22.37 (%) | 1.02 (%) | 312,186 | 125 | 22.37 (%) | 1.02 (%) | 4) ¿¬±Ýº¸Çè | |
60 | 5) ÅðÁ÷°øÁ¦ºÎ±Ýºñ | 92,418 | 61 | 11.43 (%) | 0.52 (%) | 159,560 | 64 | 11.43 (%) | 0.52 (%) | 5) ºÎºÐ°øÁ¦ºÎ±Ýºñ | |
61 | 6) ¾ÈÀü°ü¸®ºñ | 218,181 | 145 | 26.99 (%) | 1.23 (%) | 378,053 | 151 | 27.09 (%) | 1.24 (%) | 6) ¾ÈÀü°ü¸®ºñ | |
62 | 7) ±ÙÀ纸Çè·á | 10,770 | 7 | 1.33 (%) | 0.06 (%) | 18,018 | 7 | 1.29 (%) | 0.06 (%) | 7) ±ÙÀ纸Çè | |
64 | 9) ȯ°æº¸Á¸ºñ | 74,415 | 49 | 9.2 (%) | 0.42 (%) | 128,661 | 51 | 9.22 (%) | 0.42 (%) | 9) ȯ°æº¸Á¸ºñ | |
65 | 10) °Ç¼³±â°è´ë¿©ºñ | 29,766 | 20 | 3.68 (%) | 0.17 (%) | 51,465 | 21 | 3.69 (%) | 0.17 (%) | 10) °Ç¼³±â°è´ë¿©ºñ | |
66 | (4) Sub - Total (°£Á¢°ø»çºñ) | 808,447 | 536 | 100.0 (%) | 4.54 (%) | 1,395,793 | 558 | 100.0 (%) | 4.57 (%) | (4) ¼Ò°è(°£Á¢°ø»çºñ) | |
67 | (EPC + °£Á¢ºñ) ÃÑ ÇÕ°è | 17,808,258 | 11,814 | 0.0 (%) | 100.0 (%) | 30,551,808 | 12,208 | 0.0 (%) | 100.0 (%) | ÃÑ ÇÕ°è (EP+C) |
No | CODE | Description | Tank No. : [301] CAP2 Propane(C3/C4) Shell Material : A537-CL2+S5 Net Weight : 1507.391 (Ton) Gross Weight : 1581.69 (Ton) Welding Rod : 6.132 (Ton) | ¿ø°¡³»¿ª | PLATE ÀçÁúº° ±¸¸Å´Ü°¡ Å×À̺í | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost Estimation (õ¿ø) | Unit Price (õ¿ø/Ton) | EP BASE Sub Total Ratio (%) | EPC BASE Grand Total Ratio (%) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | FIXC | 1. ENG'G and Design | 300,000 | 199 | 1.74 (%) | 0.62 (%) | 1. ¼³°èºñ |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2. Material Cost | 2. Àç·áºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 | MATC | 2.1 Main Material | 7,705,044 | 1,810 | 44.76 (%) | 15.93 (%) | 2.1 Main Steel ÀÚÀçºñ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | ¡¡ 2.2 ¿ëÁ¢ºÀ ±¸¸Åºñ + Accessory | 116,230 | 7,057 | 0.68 (%) | 0.24 (%) | 2.2 ¾×¼¼¼¸® | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7 | ¡¡ 2.5 Surrounding Pipe | 297,694 | 197 | 1.73 (%) | 0.62 (%) | 2.5 ÁÖº¯ ÆÄÀÌÇÁ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8 | ¡¡ 2.6 Insulation Material | 4,607,511 | 3,057 | 26.77 (%) | 9.53 (%) | 2.6 ´Ü¿Àç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | ¡¡ 2.7 Platform, handrail and Stairway for FD | 278,662 | 185 | 1.62 (%) | 0.58 (%) | 2.7 FDÀÇ Ç÷§Æû, ³°£ ¹× °è´Ü | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12 | FABC | 3-1. Pre-fabrication (Bending, Cutting, Shop Weld) | 2,606,463 | 1,729 | 15.14 (%) | 5.39 (%) | 3-1. »çÀü Á¦ÀÛ(Àý°î, Àý´Ü, °øÀå ¿ëÁ¢) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16 | 5. Shop Test and Inspection | 302,831 | 201 | 1.76 (%) | 0.63 (%) | 5. °øÀå Å×½ºÆ® ¹× °Ë»ç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17 | 6. (°øÀåÁ¦ÀÛºÐ) Á¦Ç°µµÀå+Ç¥¸éó¸®+»ê¼¼ | 516,447 | 343 | 3.0 (%) | 1.07 (%) | 6. Ç¥¸é Áغñ ¹× »ê¼º ¼¼Ã´À» Æ÷ÇÔÇÑ °øÀå ÆäÀÎÆÃ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
18 | 7. Packing & Trans -portation | 483,096 | 320 | 2.81 (%) | 1.0 (%) | 7. Æ÷Àå ¹× ³»·ú¿î¼Û | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
21 | (1) Sub - Total (EP) | 17,213,977 | 11,420 | 100.0 (%) | 35.6 (%) | (1) ¼Ò°è(EP) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
22 | 10. Constrcution Cost | 10. ¼³Ä¡ ºñ¿ë | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
23 | 10.1 Direct Labor Cost | 10,955,629 | 7,268 | 38.19 (%) | 22.65 (%) | 10.1 Á÷Á¢ÀΰǺñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
24 | 10.2 Construction Equipment Cost | 3,241,489 | 2,150 | 11.3 (%) | 6.7 (%) | 10.2 °Ç¼³Àåºñ ºñ¿ë | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
26 | ¡¡ 1) Tool & Consumables | 2,493,463 | 1,654 | 8.69 (%) | 5.16 (%) | -1) µµ±¸ ¹× ¼Ò¸ðǰ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
29 | ¡¡ 2) Temporary Material ¡¡¡¡¡¡(For Erection Jig etc) | 1,290,123 | 856 | 4.5 (%) | 2.67 (%) | -2) °¡¼³Àç(¼³Ä¡ Áö±× µî¿ë) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
30 | ¡¡ 3) Management & Supervisory Staff | 2,788,169 | 1,850 | 9.72 (%) | 5.77 (%) | -3) °ü¸® ¹× °¨µ¶ Á÷¿ø | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
31 | ¡¡ 4) Indirect Labor | 650,167 | 431 | 2.27 (%) | 1.34 (%) | -4) °£Á¢³ëµ¿ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
34 | ¡¡ 7) Temporary Facilities | 571,963 | 379 | 1.99 (%) | 1.18 (%) | -7) Àӽýü³ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
35 | ¡¡ 8) Catering and Housekeeping | 786,476 | 522 | 2.74 (%) | 1.63 (%) | -8) ÄÉÀÌÅ͸µ ¹× ÇϿ콺ŰÇÎ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
36 | ¡¡ 9) General Field Expenses | 170,001 | 113 | 0.59 (%) | 0.35 (%) | -9) ÀϹÝÇöÀå°æºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
37 | ¡¡ 10) HSE | 103,186 | 68 | 0.36 (%) | 0.21 (%) | -10) HSE | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
38 | 10.4 ¿ÜÁÖºñ | 10.4 ¿ÜÁÖºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
39 | ¡¡ 1) NDE | 714,543 | 474 | 2.49 (%) | 1.48 (%) | -1) ÀÓ»çüÇè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
41 | ¡¡ 3) Painting Work | 1,388,233 | 921 | 4.84 (%) | 2.87 (%) | -3) ÆäÀÎÆÃ ÀÛ¾÷ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
42 | ¡¡ 4) Acid Cleaning & PTFE Coating | 533,078 | 354 | 1.86 (%) | 1.1 (%) | -4) »ê ¼¼Ã´ ¹× PTFE ÄÚÆÃ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
43 | ¡¡ 5) Calibration | 18,593 | 12 | 0.06 (%) | 0.04 (%) | -5) ±³Á¤ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
44 | ¡¡ 6) Insulation Work | 2,979,233 | 1,976 | 10.39 (%) | 6.16 (%) | -6) ´Ü¿°ø»ç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
48 | (2) Sub - Total (Construction) | 28,684,345 | 19,029 | 100.0 (%) | 59.31 (%) | (2) ¼Ò°è(°Ç¼³) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
50 | ¡¡ 11.1 Advance payment bond | 78,252 | 52 | 30.39 (%) | 0.16 (%) | 11.1 ¼±Áö±Þº¸Áõ±Ý | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
51 | ¡¡ 11.2 Performance bond | 78,252 | 52 | 30.39 (%) | 0.16 (%) | 11.2 ÀÌÇຸÁõ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
52 | ¡¡ 11.3 Warranty bond | 101,000 | 67 | 39.22 (%) | 0.21 (%) | 11.3 º¸Áõä±Ç | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
53 | (3) Sub - Total (Bond) | 257,503 | 171 | 100.0 (%) | 0.53 (%) | (3) ¼Ò°è(ä±Ç) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
54 | (1)+(2)+(3) EPC Total | 46,155,825 | 30,620 | 0.0 (%) | 95.44 (%) | EPC ÇÕ°è | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
55 | ¢Â °£Á¢ºñ | ¢Â µû·Îºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
56 | 1) °í¿ëº¸Çè·á | 111,456 | 74 | 5.06 (%) | 0.23 (%) | 1) °í¿ëº¸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
57 | 2) °Ç°º¸Çè·á | 388,377 | 258 | 17.62 (%) | 0.8 (%) | 2) °Ç°º¸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
58 | 3) ³ëÀÎÀå±â¿ä¾çº¸Çè·á | 50,094 | 33 | 2.27 (%) | 0.1 (%) | 3) ¶°µéÀå±â¾çº¸Çè·á | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
59 | 4) ¿¬±Ýº¸Çè·á | 493,003 | 327 | 22.37 (%) | 1.02 (%) | 4) ¿¬±Ýº¸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
60 | 5) ÅðÁ÷°øÁ¦ºÎ±Ýºñ | 251,978 | 167 | 11.43 (%) | 0.52 (%) | 5) ºÎºÐ°øÁ¦ºÎ±Ýºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
61 | 6) ¾ÈÀü°ü¸®ºñ | 596,234 | 396 | 27.05 (%) | 1.23 (%) | 6) ¾ÈÀü°ü¸®ºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
62 | 7) ±ÙÀ纸Çè·á | 28,789 | 19 | 1.31 (%) | 0.06 (%) | 7) ±ÙÀ纸Çè | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
64 | 9) ȯ°æº¸Á¸ºñ | 203,077 | 135 | 9.21 (%) | 0.42 (%) | 9) ȯ°æº¸Á¸ºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
65 | 10) °Ç¼³±â°è´ë¿©ºñ | 81,231 | 54 | 3.69 (%) | 0.17 (%) | 10) °Ç¼³±â°è´ë¿©ºñ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
66 | (4) Sub - Total (°£Á¢°ø»çºñ) | 2,204,240 | 1,462 | 100.0 (%) | 4.56 (%) | (4) ¼Ò°è(°£Á¢°ø»çºñ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
67 | (EPC + °£Á¢ºñ) ÃÑ ÇÕ°è | 48,360,066 | 32,082 | 0.0 (%) | 100.0 (%) | ÃÑ ÇÕ°è (EP+C) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
[ GA View ] | [ GA View ] | [ GA View ] | [ GA View ] | [ GA View ] | [ GA View ] | [ GA View ] | [ GA View ] | [ GA View ] | [ GA View ] | [ GA View ] | [ GA View ] | [ GA View ] | [ GA View ] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
0. Project Description (Tank No.) | 1. Design Code | 2. Containment System | 3. ³»¿ÜÁ¶±¸ºÐ | 4. Content | 16. SG | 18. Design Pressure (MPa) | 19. Design temperature (¡É) | 10. Diameter (mm) | 11. Height (mm) | 13. CA (mm) | 12. Joint Efficiency | 14. DLL (mm) | 15. HTL (mm) |
TK-001 (VPDM) | API 650 | CRT | OUTER | WATER | 1 | 0.0024517 | 66 | 60000 | 23000 | 3 | 0.85 | 21440 | 23000 |
1. [OUTER TANK] Shell Plate | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Net WT (Ton) | Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark |
12 th Shell Plate | A516-70 | 8.0 | 1000 | 11782 | 16 | 11.840 | 12 | A516-70 | 8.0 | 1050 | 11830 | 17 | 13.260 | 11.99 | 1,284.17 | 17,028 | 1,541.00 | 20,434 | Stiff and jig ºÎÂø PAD PLATE 1 Sheet Æ÷ÇÔ |
11 th Shell Plate | A516-70 | 9.0 | 2000 | 11782 | 16 | 26.640 | 11 | A516-70 | 9.0 | 2050 | 11830 | 16 | 27.408 | 2.88 | 1,284.17 | 35,197 | 1,541.00 | 42,236 | |
10 th Shell Plate | A516-70 | 13.0 | 2000 | 11783 | 16 | 38.480 | 10 | A516-70 | 13.0 | 2050 | 11830 | 16 | 39.600 | 2.91 | 1,284.17 | 50,853 | 1,541.00 | 61,024 | |
9 th Shell Plate | A516-70 | 16.5 | 2000 | 11784 | 16 | 48.848 | 9 | A516-70 | 16.5 | 2050 | 11830 | 16 | 50.256 | 2.88 | 1,284.17 | 64,537 | 1,541.00 | 77,444 | |
8 th Shell Plate | A516-70 | 20.5 | 2000 | 11785 | 16 | 60.688 | 8 | A516-70 | 20.5 | 2050 | 11830 | 16 | 62.448 | 2.9 | 1,284.17 | 80,194 | 1,541.00 | 96,232 | |
7 th Shell Plate | A516-70 | 24.5 | 2000 | 11785 | 16 | 72.528 | 7 | A516-70 | 24.5 | 2050 | 11830 | 16 | 74.624 | 2.89 | 1,284.17 | 95,830 | 1,541.00 | 114,996 | |
6 th Shell Plate | A516-70 | 28.5 | 2000 | 11786 | 16 | 84.384 | 6 | A516-70 | 28.5 | 2050 | 11830 | 16 | 86.816 | 2.88 | 1,284.17 | 111,486 | 1,541.00 | 133,783 | |
5 th Shell Plate | A516-70 | 32.5 | 2000 | 11787 | 16 | 96.224 | 5 | A516-70 | 32.5 | 2050 | 11830 | 16 | 98.992 | 2.88 | 1,284.17 | 127,123 | 1,541.00 | 152,547 | |
4 th Shell Plate | A516-70 | 35.5 | 2000 | 11788 | 16 | 105.120 | 4 | A516-70 | 35.5 | 2050 | 11830 | 16 | 108.128 | 2.86 | 1,284.17 | 138,855 | 1,541.00 | 166,625 | |
3 rd Shell Plate | A516-70 | 47.5 | 2000 | 11790 | 16 | 140.672 | 3 | A516-70 | 47.5 | 2050 | 11840 | 16 | 144.800 | 2.93 | 1,284.17 | 185,948 | 1,541.00 | 223,137 | |
2 nd Shell Plate | A537-CL2 | 35.0 | 2000 | 11788 | 16 | 103.648 | 2 | A537-CL2 | 35.0 | 2050 | 11830 | 16 | 106.608 | 2.86 | 1,541.67 | 164,354 | 1,850.00 | 197,225 | |
1 st Shell Plate | A537-CL2 | 39.5 | 2000 | 11788 | 16 | 116.960 | 1 | A537-CL2 | 39.5 | 2050 | 11830 | 17 | 127.840 | 9.3 | 1,541.67 | 197,087 | 1,850.00 | 236,504 | 1st Shell Nozzzle and Openning PAD PLATE 1 Sheet Æ÷ÇÔ |
[OUTER TANK] Shell Plate Total = | 192 | 906.032 | Total Qty and Weight = | 194 | 940.780 | 3.84 | 1,348.34 | 1,268,492 | 1,618.00 | 1,522,186 | (õ¿ø) | ||||||||
Shell ÀçÁúÀÌ 2°³ ÀÏ °æ¿ì ÀçÁúº° ÇÕ°èÇ¥ | |||||||||||||||||||
Part Name | Material | Shell Course No. | Qty (SHT) | Net WT (Ton) | Thickness Range (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark | ||||
2 nd Material | A516-70 | #3 ~ #12 | 161 | 685.424 | t 47.5 ~ 8.0 | 2050 | 11840 | 161 | 706.332 | 3.05 | 1284.17 | 907,050 | 1541.00 | 1,088,458 | 2nd Material (#3 ~ #12 top shell course) | ||||
1 st Material | A537-CL2 | #1 ~ #2 | 33 | 220.608 | t 39.5 ~ 35.0 | 2050 | 11830 | 33 | 234.448 | 6.27 | 1,541.67 | 361,441 | 1,850.00 | 433,729 | Primary Material (#1 ~ #2 Shell course) | ||||
2. [OUTER TANK] Bottom / Annular / Roof Plate / Compression Ring / Stiffener Ring | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Part Name | Material | Shell Course No. | Qty (SHT) | Net WT (Ton) | Thickness Range (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark | ||||
1. Bottom Plate | A283-C | 9.5 | 2438 | 6096 | 175.50 | 194.470 | 1 | A283-C | 9.5 | 2438 | 6096 | 186 | 206.088 | 5.97 | 1,137.00 | 234,322 | 1,690.00 | 348,289 | |
2. Annular Plate | A516-60 | 26.0 | 2438 | 6096 | 17.10 | 51.730 | 2 | A516-60 | 26.0 | 2438 | 6096 | 20 | 60.660 | 17.26 | 1,300.00 | 78,858 | 1,690.00 | 102,515 | |
3. Roof Plate | A516-60 | 5.4 | 2438 | 6096 | 198.20 | 124.890 | 3 | A516-60 | 5.4 | 2438 | 6096 | 213 | 134.190 | 7.45 | 1,300.00 | 174,447 | 1,690.00 | 226,781 | |
4. Comp. Ring | A516-60 | 103.0 | 1400 | 4597 | 41.00 | 209.588 | 4 | A516-60 | 103.0 | 1550 | 4747 | 43 | 255.807 | 22.05 | 1,300.00 | 332,549 | 1,690.00 | 432,314 | |
6. Stiffener Ring | A283-C | L150x15 | 188.0 (m) | 1 Rings | 6.684 | 6 | A283-C | ref. | ¿ª°è»ê | ¿ª°è»ê | 1 | 7.687 | 15.01 | 5,090.00 | 39,127 | 6,108.00 | 46,952 | ||
[OUTER TANK] Bottom / Annular / Total = | 587.362 | Total Qty and Weight = | 664.432 | 859,303 | USD | 1,156,851 | (õ¿ø) | ||||||||||||
[OUTER TANK] Grand Total = | 1493.394 | Grand Total Qty and Weight = | 1605.212 | 2,127,795 | USD | 2,679,038 | (õ¿ø) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
0. Project Description (Tank No.) | 1. Design Code | 2. Containment System | 3. ³»¿ÜÁ¶±¸ºÐ | 4. Content | 16. SG | 18. Design Pressure (MPa) | 19. Design temperature (¡É) | 10. Diameter (mm) | 11. Height (mm) | 13. CA (mm) | 12. Joint Efficiency | 14. DLL (mm) | 15. HTL (mm) |
Turkey SECL (1 ONE-FOOT) | API 650 | DRT | OUTER | WATER | 1 | 0.0024517 | 65 | 31600 | 15200 | 1.5 | 1 | 15200 | 15200 |
1. [OUTER TANK] Shell Plate | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Net WT (Ton) | Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark |
7 th Shell Plate | A516-70 | 8.5 | 800 | 16550 | 6 | 5.298 | 7 | A516-70 | 8.5 | 850 | 16600 | 6 | 5.646 | 6.57 | 1,284.17 | 7,250 | 1,541.00 | 8,700 | This shell plate is Compression Ring |
6 th Shell Plate | A516-70 | 6.0 | 2400 | 16548 | 6 | 11.226 | 6 | A516-70 | 6.0 | 2450 | 16590 | 7 | 13.398 | 19.35 | 1,284.17 | 17,205 | 1,541.00 | 20,646 | Stiff and jig ºÎÂø PAD PLATE 1 Sheet Æ÷ÇÔ |
5 th Shell Plate | A516-70 | 7.0 | 2400 | 16549 | 6 | 13.092 | 5 | A516-70 | 7.0 | 2450 | 16590 | 6 | 13.398 | 2.34 | 1,284.17 | 17,205 | 1,541.00 | 20,646 | |
4 th Shell Plate | A516-70 | 9.0 | 2400 | 16550 | 6 | 16.836 | 4 | A516-70 | 9.0 | 2450 | 16600 | 6 | 17.238 | 2.39 | 1,284.17 | 22,137 | 1,541.00 | 26,564 | |
3 rd Shell Plate | A516-70 | 11.5 | 2400 | 16551 | 6 | 21.516 | 3 | A516-70 | 11.5 | 2450 | 16600 | 6 | 22.026 | 2.37 | 1,284.17 | 28,285 | 1,541.00 | 33,942 | |
2 nd Shell Plate | A516-70 | 13.5 | 2400 | 16552 | 6 | 25.260 | 2 | A516-70 | 13.5 | 2450 | 16600 | 6 | 25.860 | 2.38 | 1,284.17 | 33,209 | 1,541.00 | 39,850 | |
1 st Shell Plate | A516-70 | 15.5 | 2400 | 16553 | 6 | 29.004 | 1 | A516-70 | 15.5 | 2450 | 16600 | 7 | 34.643 | 19.44 | 1,284.17 | 44,488 | 1,541.00 | 53,385 | 1st Shell Nozzzle and Openning PAD PLATE 1 Sheet Æ÷ÇÔ |
[OUTER TANK] Shell Plate Total = | 42 | 122.232 | Total Qty and Weight = | 44 | 132.209 | 8.16 | 1,284.17 | 169,779 | 1,541.00 | 203,734 | (õ¿ø) | ||||||||
2. [OUTER TANK] Bottom / Annular / Roof Plate / Compression Ring / Stiffener Ring | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Part Name | Material | Shell Course No. | Qty (SHT) | Net WT (Ton) | Thickness Range (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark | ||||
1. Bottom Plate | A283-C | 8.0 | 2438 | 6096 | 48.80 | 45.520 | 1 | A283-C | 8.0 | 2438 | 6096 | 52 | 48.516 | 6.58 | 1,137.00 | 55,163 | 1,690.00 | 81,992 | |
2. Annular Plate | A516-60 | 10.5 | 2438 | 6096 | 4.90 | 5.970 | 2 | A516-60 | 10.5 | 2438 | 6096 | 6 | 7.350 | 23.12 | 1,300.00 | 9,555 | 1,690.00 | 12,422 | |
3. Roof Plate | A516-60 | 5.4 | 2438 | 6096 | 60.50 | 38.090 | 3 | A516-60 | 5.4 | 2438 | 6096 | 65 | 40.950 | 7.51 | 1,300.00 | 53,235 | 1,690.00 | 69,206 | |
4. Comp. Ring | A516-60 | 8.5 | 230 | 4136 | 24.00 | 1.520 | 4 | A516-60 | 8.5 | 380 | 4286 | 26 | 2.834 | 86.45 | 1,300.00 | 3,684 | 1,690.00 | 4,789 | |
6. Stiffener Ring | A283-C | L150x15 | 99.0 (m) | 1 Rings | 3.532 | 6 | A283-C | ref. | ¿ª°è»ê | ¿ª°è»ê | 1 | 4.062 | 15.01 | 5,090.00 | 20,676 | 6,108.00 | 24,811 | ||
[OUTER TANK] Bottom / Annular / Total = | 94.632 | Total Qty and Weight = | 103.712 | 142,312 | USD | 193,219 | (õ¿ø) | ||||||||||||
[OUTER TANK] Grand Total = | 216.864 | Grand Total Qty and Weight = | 235.921 | 312,091 | USD | 396,953 | (õ¿ø) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
0. Project Description (Tank No.) | 1. Design Code | 2. Containment System | 3. ³»¿ÜÁ¶±¸ºÐ | 4. Content | 16. SG | 18. Design Pressure (MPa) | 19. Design temperature (¡É) | 10. Diameter (mm) | 11. Height (mm) | 13. CA (mm) | 12. Joint Efficiency | 14. DLL (mm) | 15. HTL (mm) |
Turkey SECL (2 ONE-FOOT) | API 650 | DRT | OUTER | WATER | 1 | 0.0024517 | 65 | 41600 | 15200 | 1.5 | 1 | 15200 | 15200 |
1. [OUTER TANK] Shell Plate | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Net WT (Ton) | Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark |
7 th Shell Plate | A516-70 | 11.5 | 800 | 13072 | 10 | 9.440 | 7 | A516-70 | 11.5 | 850 | 13120 | 10 | 10.070 | 6.67 | 1,284.17 | 12,932 | 1,541.00 | 15,518 | This shell plate is Compression Ring |
6 th Shell Plate | A516-70 | 8.0 | 2400 | 13071 | 10 | 19.700 | 6 | A516-70 | 8.0 | 2450 | 13120 | 11 | 22.209 | 12.74 | 1,284.17 | 28,520 | 1,541.00 | 34,224 | Stiff and jig ºÎÂø PAD PLATE 1 Sheet Æ÷ÇÔ |
5 th Shell Plate | A516-70 | 8.5 | 2400 | 13071 | 10 | 20.930 | 5 | A516-70 | 8.5 | 2450 | 13120 | 10 | 21.450 | 2.48 | 1,284.17 | 27,545 | 1,541.00 | 33,054 | |
4 th Shell Plate | A516-70 | 11.5 | 2400 | 13072 | 10 | 28.320 | 4 | A516-70 | 11.5 | 2450 | 13120 | 10 | 29.020 | 2.47 | 1,284.17 | 37,267 | 1,541.00 | 44,720 | |
3 rd Shell Plate | A516-70 | 14.0 | 2400 | 13073 | 10 | 34.480 | 3 | A516-70 | 14.0 | 2450 | 13120 | 10 | 35.330 | 2.47 | 1,284.17 | 45,370 | 1,541.00 | 54,444 | |
2 nd Shell Plate | A516-70 | 17.0 | 2400 | 13074 | 10 | 41.870 | 2 | A516-70 | 17.0 | 2450 | 13120 | 10 | 42.900 | 2.46 | 1,284.17 | 55,091 | 1,541.00 | 66,109 | |
1 st Shell Plate | A516-70 | 20.0 | 2400 | 13075 | 10 | 49.270 | 1 | A516-70 | 20.0 | 2450 | 13120 | 11 | 55.517 | 12.68 | 1,284.17 | 71,293 | 1,541.00 | 85,552 | 1st Shell Nozzzle and Openning PAD PLATE 1 Sheet Æ÷ÇÔ |
[OUTER TANK] Shell Plate Total = | 70 | 204.010 | Total Qty and Weight = | 72 | 216.496 | 6.12 | 1,284.17 | 278,018 | 1,541.00 | 333,620 | (õ¿ø) | ||||||||
2. [OUTER TANK] Bottom / Annular / Roof Plate / Compression Ring | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Part Name | Material | Shell Course No. | Qty (SHT) | Net WT (Ton) | Thickness Range (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark | ||||
1. Bottom Plate | A283-C | 8.0 | 2438 | 6096 | 85.30 | 79.660 | 1 | A283-C | 8.0 | 2438 | 6096 | 91 | 84.903 | 6.58 | 1,137.00 | 96,535 | 1,690.00 | 143,486 | |
2. Annular Plate | A516-60 | 13.0 | 2438 | 6096 | 7.30 | 11.130 | 2 | A516-60 | 13.0 | 2438 | 6096 | 9 | 13.653 | 22.67 | 1,300.00 | 17,749 | 1,690.00 | 23,074 | |
3. Roof Plate | A516-60 | 5.4 | 2438 | 6096 | 104.80 | 66.010 | 3 | A516-60 | 5.4 | 2438 | 6096 | 113 | 71.190 | 7.85 | 1,300.00 | 92,547 | 1,690.00 | 120,311 | |
4. Comp. Ring | A516-60 | 11.5 | 600 | 4356 | 30.00 | 7.016 | 4 | A516-60 | 11.5 | 750 | 4506 | 32 | 9.760 | 39.11 | 1,300.00 | 12,688 | 1,690.00 | 16,494 | |
[OUTER TANK] Bottom / Annular / Total = | 163.816 | Total Qty and Weight = | 179.506 | 219,519 | USD | 303,365 | (õ¿ø) | ||||||||||||
[OUTER TANK] Grand Total = | 367.826 | Grand Total Qty and Weight = | 396.002 | 497,536 | USD | 636,985 | (õ¿ø) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
0. Project Description (Tank No.) | 1. Design Code | 2. Containment System | 3. ³»¿ÜÁ¶±¸ºÐ | 4. Content | 16. SG | 18. Design Pressure (MPa) | 19. Design temperature (¡É) | 10. Diameter (mm) | 11. Height (mm) | 13. CA (mm) | 12. Joint Efficiency | 14. DLL (mm) | 15. HTL (mm) |
TK-002 (ONE-FOOT) | API 650 | DRT | OUTER | WATER | 1 | 0.0024517 | 66 | 40000 | 23000 | 3 | 0.85 | 21440 | 23000 |
1. [OUTER TANK] Shell Plate | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Net WT (Ton) | Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark |
12 th Shell Plate | A516-70 | 13.0 | 1000 | 12570 | 10 | 12.830 | 12 | A516-70 | 13.0 | 1050 | 12620 | 10 | 13.520 | 5.38 | 1,284.17 | 17,362 | 1,541.00 | 20,834 | This shell plate is Compression Ring |
11 th Shell Plate | A516-70 | 8.0 | 2000 | 12568 | 10 | 15.790 | 11 | A516-70 | 8.0 | 2050 | 12610 | 11 | 17.853 | 13.07 | 1,284.17 | 22,926 | 1,541.00 | 27,511 | Stiff and jig ºÎÂø PAD PLATE 1 Sheet Æ÷ÇÔ |
10 th Shell Plate | A516-70 | 10.0 | 2000 | 12569 | 10 | 19.730 | 10 | A516-70 | 10.0 | 2050 | 12610 | 10 | 20.290 | 2.84 | 1,284.17 | 26,056 | 1,541.00 | 31,267 | |
9 th Shell Plate | A516-70 | 13.0 | 2000 | 12570 | 10 | 25.660 | 9 | A516-70 | 13.0 | 2050 | 12620 | 10 | 26.400 | 2.88 | 1,284.17 | 33,902 | 1,541.00 | 40,682 | |
8 th Shell Plate | A516-70 | 15.5 | 2000 | 12571 | 10 | 30.590 | 8 | A516-70 | 15.5 | 2050 | 12620 | 10 | 31.480 | 2.91 | 1,284.17 | 40,426 | 1,541.00 | 48,511 | |
7 th Shell Plate | A516-70 | 18.0 | 2000 | 12572 | 10 | 35.530 | 7 | A516-70 | 18.0 | 2050 | 12620 | 10 | 36.560 | 2.9 | 1,284.17 | 46,949 | 1,541.00 | 56,339 | |
6 th Shell Plate | A516-70 | 21.0 | 2000 | 12572 | 10 | 41.450 | 6 | A516-70 | 21.0 | 2050 | 12620 | 10 | 42.650 | 2.9 | 1,284.17 | 54,770 | 1,541.00 | 65,724 | |
5 th Shell Plate | A516-70 | 23.5 | 2000 | 12573 | 10 | 46.390 | 5 | A516-70 | 23.5 | 2050 | 12620 | 10 | 47.730 | 2.89 | 1,284.17 | 61,293 | 1,541.00 | 73,552 | |
4 th Shell Plate | A516-70 | 26.0 | 2000 | 12574 | 10 | 51.330 | 4 | A516-70 | 26.0 | 2050 | 12620 | 10 | 52.800 | 2.86 | 1,284.17 | 67,804 | 1,541.00 | 81,365 | |
3 rd Shell Plate | A516-70 | 29.0 | 2000 | 12575 | 10 | 57.250 | 3 | A516-70 | 29.0 | 2050 | 12620 | 10 | 58.900 | 2.88 | 1,284.17 | 75,638 | 1,541.00 | 90,765 | |
2 nd Shell Plate | A537-CL2 | 25.5 | 2000 | 12574 | 10 | 50.340 | 2 | A537-CL2 | 25.5 | 2050 | 12620 | 10 | 51.790 | 2.88 | 1,541.67 | 79,843 | 1,850.00 | 95,812 | |
1 st Shell Plate | A537-CL2 | 27.5 | 2000 | 12575 | 10 | 54.290 | 1 | A537-CL2 | 27.5 | 2050 | 12620 | 11 | 61.435 | 13.16 | 1,541.67 | 94,712 | 1,850.00 | 113,655 | 1st Shell Nozzzle and Openning PAD PLATE 1 Sheet Æ÷ÇÔ |
[OUTER TANK] Shell Plate Total = | 120 | 441.180 | Total Qty and Weight = | 122 | 461.408 | 4.58 | 1,347.36 | 621,682 | 1,616.83 | 746,016 | (õ¿ø) | ||||||||
Shell ÀçÁúÀÌ 2°³ ÀÏ °æ¿ì ÀçÁúº° ÇÕ°èÇ¥ | |||||||||||||||||||
Part Name | Material | Shell Course No. | Qty (SHT) | Net WT (Ton) | Thickness Range (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark | ||||
2 nd Material | A516-70 | #3 ~ #12 | 101 | 336.550 | t 29.0 ~ 13.0 | 2050 | 12620 | 101 | 348.183 | 3.46 | 1284.17 | 447,126 | 1541.00 | 536,550 | 2nd Material (#3 ~ #12 top shell course) | ||||
1 st Material | A537-CL2 | #1 ~ #2 | 21 | 104.630 | t 27.5 ~ 25.5 | 2050 | 12620 | 21 | 113.225 | 8.21 | 1,541.67 | 174,556 | 1,850.00 | 209,466 | Primary Material (#1 ~ #2 Shell course) | ||||
2. [OUTER TANK] Bottom / Annular / Roof Plate / Compression Ring | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Part Name | Material | Shell Course No. | Qty (SHT) | Net WT (Ton) | Thickness Range (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark | ||||
1. Bottom Plate | A283-C | 9.5 | 2438 | 6096 | 77.70 | 86.160 | 1 | A283-C | 9.5 | 2438 | 6096 | 83 | 91.964 | 6.74 | 1,137.00 | 104,563 | 1,690.00 | 155,419 | |
2. Annular Plate | A516-60 | 18.0 | 2438 | 6096 | 8.10 | 17.070 | 2 | A516-60 | 18.0 | 2438 | 6096 | 10 | 21.000 | 23.02 | 1,300.00 | 27,300 | 1,690.00 | 35,490 | |
3. Roof Plate | A516-60 | 5.4 | 2438 | 6096 | 94.20 | 59.340 | 3 | A516-60 | 5.4 | 2438 | 6096 | 101 | 63.630 | 7.23 | 1,300.00 | 82,719 | 1,690.00 | 107,535 | |
4. Comp. Ring | A516-60 | 13.0 | 600 | 4333 | 29.00 | 7.618 | 4 | A516-60 | 13.0 | 750 | 4483 | 31 | 10.633 | 39.58 | 1,300.00 | 13,823 | 1,690.00 | 17,970 | |
[OUTER TANK] Bottom / Annular / Total = | 170.188 | Total Qty and Weight = | 187.227 | 228,405 | USD | 316,414 | (õ¿ø) | ||||||||||||
[OUTER TANK] Grand Total = | 611.368 | Grand Total Qty and Weight = | 648.635 | 850,087 | USD | 1,062,430 | (õ¿ø) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
0. Project Description (Tank No.) | 1. Design Code | 2. Containment System | 3. ³»¿ÜÁ¶±¸ºÐ | 4. Content | 16. SG | 18. Design Pressure (MPa) | 19. Design temperature (¡É) | 10. Diameter (mm) | 11. Height (mm) | 13. CA (mm) | 12. Joint Efficiency | 14. DLL (mm) | 15. HTL (mm) |
[SECL] LP Ethylene | API 620 | FULL | INNER | LNG | 0.5677 | 0 | -104 | 42000 | 35800 | 2 | 1 | 35500 | 20160 |
1. [INNER TANK] Shell Plate | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Net WT (Ton) | Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark |
11 th Shell Plate | A553-TYPE1 | 6.35 | 3200 | 13196 | 10 | 21.050 | 11 | A553-TYPE1 | 6.35 | 3250 | 13240 | 11 | 23.595 | 12.09 | 5,353.50 | 126,316 | 6,957.00 | 164,150 | Stiff and jig ºÎÂø PAD PLATE 1 Sheet Æ÷ÇÔ |
10 th Shell Plate | A553-TYPE1 | 6.35 | 3260 | 13196 | 10 | 21.440 | 10 | A553-TYPE1 | 6.35 | 3310 | 13240 | 10 | 21.850 | 1.91 | 5,353.50 | 116,974 | 6,957.00 | 152,010 | |
9 th Shell Plate | A553-TYPE1 | 7.5 | 3260 | 13197 | 10 | 25.330 | 9 | A553-TYPE1 | 7.5 | 3310 | 13240 | 10 | 25.800 | 1.86 | 5,353.50 | 138,120 | 6,957.00 | 179,491 | |
8 th Shell Plate | A553-TYPE1 | 9.0 | 3260 | 13197 | 10 | 30.400 | 8 | A553-TYPE1 | 9.0 | 3310 | 13240 | 10 | 30.960 | 1.84 | 5,353.50 | 165,744 | 6,957.00 | 215,389 | |
7 th Shell Plate | A553-TYPE1 | 10.5 | 3260 | 13197 | 10 | 35.460 | 7 | A553-TYPE1 | 10.5 | 3310 | 13240 | 10 | 36.120 | 1.86 | 5,353.50 | 193,368 | 6,957.00 | 251,287 | |
6 th Shell Plate | A553-TYPE1 | 12.5 | 3260 | 13198 | 10 | 42.220 | 6 | A553-TYPE1 | 12.5 | 3310 | 13240 | 10 | 43.000 | 1.85 | 5,353.50 | 230,200 | 6,957.00 | 299,151 | |
5 th Shell Plate | A553-TYPE1 | 14.0 | 3260 | 13199 | 10 | 47.290 | 5 | A553-TYPE1 | 14.0 | 3310 | 13240 | 10 | 48.160 | 1.84 | 5,353.50 | 257,825 | 6,957.00 | 335,049 | |
4 th Shell Plate | A553-TYPE1 | 15.5 | 3260 | 13199 | 10 | 52.360 | 4 | A553-TYPE1 | 15.5 | 3310 | 13240 | 10 | 53.320 | 1.83 | 5,353.50 | 285,449 | 6,957.00 | 370,947 | |
3 rd Shell Plate | A553-TYPE1 | 17.5 | 3260 | 13200 | 10 | 59.120 | 3 | A553-TYPE1 | 17.5 | 3310 | 13250 | 10 | 60.250 | 1.91 | 5,353.50 | 322,548 | 6,957.00 | 419,159 | |
2 nd Shell Plate | A553-TYPE1 | 19.0 | 3260 | 13200 | 10 | 64.180 | 2 | A553-TYPE1 | 19.0 | 3310 | 13250 | 10 | 65.410 | 1.92 | 5,353.50 | 350,172 | 6,957.00 | 455,057 | |
1 st Shell Plate | A553-TYPE1 | 20.5 | 3260 | 13201 | 10 | 69.250 | 1 | A553-TYPE1 | 20.5 | 3310 | 13250 | 11 | 77.638 | 12.11 | 5,353.50 | 415,635 | 6,957.00 | 540,128 | 1st Shell Nozzzle and Openning PAD PLATE 1 Sheet Æ÷ÇÔ |
[INNER TANK] Shell Plate Total = | 110 | 468.100 | Total Qty and Weight = | 112 | 486.103 | 3.85 | 5,353.50 | 2,602,352 | 6,957.00 | 3,381,819 | (õ¿ø) | ||||||||
2. [INNER TANK] Bottom / Annular Plate / Stiffener Ring | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Part Name | Material | Shell Course No. | Qty (SHT) | Net WT (Ton) | Thickness Range (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark | ||||
1. Bottom Plate | A553-TYPE1 | 7.0 | 3048 | 12192 | 34.30 | 70.030 | 1 | A553-TYPE1 | 7.0 | 3048 | 12192 | 37 | 75.554 | 7.89 | 5,353.50 | 404,478 | 6,957.00 | 525,629 | |
2. Annular Plate | A553-TYPE1 | 13.5 | 2438 | 6096 | 8.70 | 13.740 | 2 | A553-TYPE1 | 13.5 | 2438 | 6096 | 11 | 17.325 | 26.09 | 5,353.50 | 92,749 | 6,957.00 | 120,530 | |
6. Stiffener Ring | A553-TYPE1 | L450x6.35+120x6.35 FB 170x6 | 132.0 (m) | 17 Rings | 26.852 | 6 | A553-TYPE1 | ref. | ¿ª°è»ê | ¿ª°è»ê | 17 | 30.880 | 15.00 | 5,353.50 | 165,316 | 6,957.00 | 214,832 | ||
[INNER TANK] Bottom / Annular / Total = | 110.622 | Total Qty and Weight = | 123.759 | 662,544 | USD | 860,991 | (õ¿ø) | ||||||||||||
[INNER TANK] Grand Total = | 578.722 | Grand Total Qty and Weight = | 609.862 | 3,264,896 | USD | 4,242,810 | (õ¿ø) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
0. Project Description (Tank No.) | 1. Design Code | 2. Containment System | 3. ³»¿ÜÁ¶±¸ºÐ | 4. Content | 16. SG | 18. Design Pressure (MPa) | 19. Design temperature (¡É) | 10. Diameter (mm) | 11. Height (mm) | 13. CA (mm) | 12. Joint Efficiency | 14. DLL (mm) | 15. HTL (mm) |
[SECL] LP Ethylene | API 620 | FULL | OUTER | LNG | 0.5677 | 0.018 | -104 | 44000 | 37800 | 2 | 1 | 35500 | 20160 |
1. [OUTER TANK] Shell Plate | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Net WT (Ton) | Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark |
11 th Shell Plate | A553-TYPE1 | 35.0 | 1800 | 13834 | 10 | 68.420 | 11 | A553-TYPE1 | 35.0 | 1850 | 13880 | 10 | 70.550 | 3.11 | 5,353.50 | 377,689 | 6,957.00 | 490,816 | This shell plate is Compression Ring |
10 th Shell Plate | A553-TYPE1 | 7.938 | 3600 | 13825 | 10 | 31.010 | 10 | A553-TYPE1 | 7.938 | 3650 | 13870 | 11 | 34.705 | 11.92 | 5,353.50 | 185,793 | 6,957.00 | 241,443 | Stiff and jig ºÎÂø PAD PLATE 1 Sheet Æ÷ÇÔ |
9 th Shell Plate | A553-TYPE1 | 8.0 | 3600 | 13825 | 10 | 31.260 | 9 | A553-TYPE1 | 8.0 | 3650 | 13870 | 10 | 31.790 | 1.7 | 5,353.50 | 170,188 | 6,957.00 | 221,163 | |
8 th Shell Plate | A553-TYPE1 | 10.0 | 3600 | 13826 | 10 | 39.070 | 8 | A553-TYPE1 | 10.0 | 3650 | 13870 | 10 | 39.740 | 1.71 | 5,353.50 | 212,748 | 6,957.00 | 276,471 | |
7 th Shell Plate | A553-TYPE1 | 11.5 | 3600 | 13826 | 10 | 44.930 | 7 | A553-TYPE1 | 11.5 | 3650 | 13870 | 10 | 45.700 | 1.71 | 5,353.50 | 244,655 | 6,957.00 | 317,935 | |
6 th Shell Plate | A553-TYPE1 | 13.5 | 3600 | 13827 | 10 | 52.750 | 6 | A553-TYPE1 | 13.5 | 3650 | 13870 | 10 | 53.650 | 1.71 | 5,353.50 | 287,215 | 6,957.00 | 373,243 | |
5 th Shell Plate | A553-TYPE1 | 15.5 | 3600 | 13827 | 10 | 60.570 | 5 | A553-TYPE1 | 15.5 | 3650 | 13870 | 10 | 61.600 | 1.7 | 5,353.50 | 329,776 | 6,957.00 | 428,551 | |
4 th Shell Plate | A553-TYPE1 | 17.5 | 3600 | 13828 | 10 | 68.390 | 4 | A553-TYPE1 | 17.5 | 3650 | 13870 | 10 | 69.550 | 1.7 | 5,353.50 | 372,336 | 6,957.00 | 483,859 | |
3 rd Shell Plate | A553-TYPE1 | 19.5 | 3600 | 13829 | 10 | 76.210 | 3 | A553-TYPE1 | 19.5 | 3650 | 13870 | 10 | 77.490 | 1.68 | 5,353.50 | 414,843 | 6,957.00 | 539,098 | |
2 nd Shell Plate | A553-TYPE1 | 21.5 | 3600 | 13829 | 10 | 84.020 | 2 | A553-TYPE1 | 21.5 | 3650 | 13870 | 10 | 85.440 | 1.69 | 5,353.50 | 457,403 | 6,957.00 | 594,406 | |
1 st Shell Plate | A553-TYPE1 | 23.0 | 3600 | 13830 | 10 | 89.890 | 1 | A553-TYPE1 | 23.0 | 3650 | 13880 | 11 | 100.617 | 11.93 | 5,353.50 | 538,653 | 6,957.00 | 699,992 | 1st Shell Nozzzle and Openning PAD PLATE 1 Sheet Æ÷ÇÔ |
[OUTER TANK] Shell Plate Total = | 110 | 646.520 | Total Qty and Weight = | 112 | 670.832 | 3.76 | 5,353.50 | 3,591,299 | 6,957.00 | 4,666,978 | (õ¿ø) | ||||||||
2. [OUTER TANK] Bottom / Annular / Roof Plate / Compression Ring / Suspended Deck / Stiffener Ring | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Part Name | Material | Shell Course No. | Qty (SHT) | Net WT (Ton) | Thickness Range (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark | ||||
1. Bottom Plate | A553-TYPE1 | 7.0 | 2438 | 6096 | 84.50 | 69.000 | 1 | A553-TYPE1 | 7.0 | 2438 | 6096 | 90 | 73.530 | 6.57 | 5,353.50 | 393,643 | 6,957.00 | 511,548 | |
2. Annular Plate | A553-TYPE1 | 15.0 | 2438 | 6096 | 19.10 | 33.510 | 2 | A553-TYPE1 | 15.0 | 2438 | 6096 | 23 | 40.250 | 20.11 | 5,353.50 | 215,478 | 6,957.00 | 280,019 | |
3. Roof Plate | A516-70 | 6.5 | 2438 | 6096 | 117.20 | 88.890 | 3 | A516-70 | 6.5 | 2438 | 6096 | 126 | 95.508 | 7.45 | 1,312.00 | 125,306 | 1,690.00 | 161,409 | |
4. Comp. Ring | A516-70 | 35.0 | 660 | 4320 | 32.00 | 24.829 | 4 | A516-70 | 35.0 | 810 | 4470 | 34 | 33.830 | 36.25 | 1,312.00 | 44,385 | 1,690.00 | 57,173 | |
5. Suspended Deck | Aluminum OR CS | 1.2 | 2438 | 6096 | 1 SET | 60.821 | 5 | Aluminum OR CS | 1.2 | 2438 | 6096 | 1 | 60.821 | 10.00 | 1,300.00 | 86,974 | 1,690.00 | 113,066 | Áß·® »êÃâ±Ù°Å : ¾Ë·ç¹Ì´½ ¸éÀû´ç : 40.0 kg/m©÷* 1.521 (m©÷) |
6. Stiffener Ring | A553-TYPE1 | L150x15 | 138.0 (m) | 1 Rings | 4.908 | 6 | A553-TYPE1 | ref. | ¿ª°è»ê | ¿ª°è»ê | 1 | 5.644 | 15.00 | 5,353.50 | 30,215 | 6,957.00 | 39,265 | ||
[OUTER TANK] Bottom / Annular / Total = | 281.958 | Total Qty and Weight = | 315.665 | 896,002 | USD | 1,162,480 | (õ¿ø) | ||||||||||||
[OUTER TANK] Grand Total = | 928.478 | Grand Total Qty and Weight = | 986.497 | 4,487,301 | USD | 5,829,458 | (õ¿ø) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
0. Project Description (Tank No.) | 1. Design Code | 2. Containment System | 3. ³»¿ÜÁ¶±¸ºÐ | 4. Content | 16. SG | 18. Design Pressure (MPa) | 19. Design temperature (¡É) | 10. Diameter (mm) | 11. Height (mm) | 13. CA (mm) | 12. Joint Efficiency | 14. DLL (mm) | 15. HTL (mm) |
ÇÑÈ-´ë»ê LPG | API 620 | FULL | INNER | LPG | 0.5814 | 0 | -45 | 62200 | 40230 | 1.5 | 1 | 36200 | 21033 |
1. [INNER TANK] Shell Plate | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Net WT (Ton) | Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark |
12 th Shell Plate | A537-CL2+S5 | 11.0 | 3347 | 12215 | 16 | 56.480 | 12 | A537-CL2+S5 | 11.0 | 3397 | 12260 | 17 | 61.132 | 8.24 | 1,541.67 | 94,245 | 1,850.00 | 113,094 | Stiff and jig ºÎÂø PAD PLATE 1 Sheet Æ÷ÇÔ |
11 th Shell Plate | A537-CL2+S5 | 12.0 | 3353 | 12215 | 16 | 61.728 | 11 | A537-CL2+S5 | 12.0 | 3403 | 12260 | 16 | 62.880 | 1.87 | 1,541.67 | 96,940 | 1,850.00 | 116,328 | |
10 th Shell Plate | A537-CL2+S5 | 12.0 | 3353 | 12215 | 16 | 61.728 | 10 | A537-CL2+S5 | 12.0 | 3403 | 12260 | 16 | 62.880 | 1.87 | 1,541.67 | 96,940 | 1,850.00 | 116,328 | |
9 th Shell Plate | A537-CL2+S5 | 14.0 | 3353 | 12215 | 16 | 72.016 | 9 | A537-CL2+S5 | 14.0 | 3403 | 12260 | 16 | 73.360 | 1.87 | 1,541.67 | 113,097 | 1,850.00 | 135,716 | |
8 th Shell Plate | A537-CL2+S5 | 18.0 | 3353 | 12216 | 16 | 92.608 | 8 | A537-CL2+S5 | 18.0 | 3403 | 12260 | 16 | 94.320 | 1.85 | 1,541.67 | 145,410 | 1,850.00 | 174,492 | |
7 th Shell Plate | A537-CL2+S5 | 22.0 | 3353 | 12217 | 16 | 113.184 | 7 | A537-CL2+S5 | 22.0 | 3403 | 12260 | 16 | 115.280 | 1.85 | 1,541.67 | 177,724 | 1,850.00 | 213,268 | |
6 th Shell Plate | A537-CL2+S5 | 26.0 | 3353 | 12218 | 16 | 133.776 | 6 | A537-CL2+S5 | 26.0 | 3403 | 12260 | 16 | 136.240 | 1.84 | 1,541.67 | 210,037 | 1,850.00 | 252,044 | |
5 th Shell Plate | A537-CL2+S5 | 29.0 | 3353 | 12218 | 16 | 149.216 | 5 | A537-CL2+S5 | 29.0 | 3403 | 12260 | 16 | 151.968 | 1.84 | 1,541.67 | 234,285 | 1,850.00 | 281,141 | |
4 th Shell Plate | A537-CL2+S5 | 33.0 | 3353 | 12219 | 16 | 169.808 | 4 | A537-CL2+S5 | 33.0 | 3403 | 12260 | 16 | 172.928 | 1.84 | 1,541.67 | 266,598 | 1,850.00 | 319,917 | |
3 rd Shell Plate | A537-CL2+S5 | 36.0 | 3353 | 12220 | 16 | 185.264 | 3 | A537-CL2+S5 | 36.0 | 3403 | 12270 | 16 | 188.800 | 1.91 | 1,541.67 | 291,067 | 1,850.00 | 349,280 | |
2 nd Shell Plate | A537-CL2+S5 | 39.0 | 3353 | 12220 | 16 | 200.704 | 2 | A537-CL2+S5 | 39.0 | 3403 | 12270 | 16 | 204.528 | 1.91 | 1,541.67 | 315,315 | 1,850.00 | 378,377 | |
1 st Shell Plate | A537-CL2+S5 | 42.0 | 3353 | 12221 | 16 | 216.160 | 1 | A537-CL2+S5 | 42.0 | 3403 | 12270 | 17 | 234.039 | 8.27 | 1,541.67 | 360,811 | 1,850.00 | 432,972 | 1st Shell Nozzzle and Openning PAD PLATE 1 Sheet Æ÷ÇÔ |
[INNER TANK] Shell Plate Total = | 192 | 1512.672 | Total Qty and Weight = | 194 | 1558.355 | 3.02 | 1,541.67 | 2,402,469 | 1,850.00 | 2,882,957 | (õ¿ø) | ||||||||
2. [INNER TANK] Bottom / Annular Plate / Stiffener Ring | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Part Name | Material | Shell Course No. | Qty (SHT) | Net WT (Ton) | Thickness Range (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark | ||||
1. Bottom Plate | A516-60N+S5 | 8.0 | 2438 | 6096 | 182.20 | 170.060 | 1 | A516-60N+S5 | 8.0 | 2438 | 6096 | 194 | 181.002 | 6.43 | 1,300.00 | 235,303 | 1,690.00 | 305,893 | |
2. Annular Plate | A537-CL2+S5 | 27.5 | 2438 | 6096 | 24.70 | 79.120 | 2 | A537-CL2+S5 | 27.5 | 2438 | 6096 | 29 | 93.032 | 17.58 | 1,541.67 | 143,425 | 1,850.00 | 172,109 | |
6. Stiffener Ring | A516-60N+S5 | L450x11+120x11 FB 230x12 | 195.0 (m) | 6 Rings | 37.834 | 6 | A516-60N+S5 | ref. | ¿ª°è»ê | ¿ª°è»ê | 6 | 43.509 | 15.00 | 5,090.00 | 221,461 | 6,108.00 | 265,753 | ||
[INNER TANK] Bottom / Annular / Total = | 287.014 | Total Qty and Weight = | 317.543 | 600,188 | USD | 743,756 | (õ¿ø) | ||||||||||||
[INNER TANK] Grand Total = | 1799.686 | Grand Total Qty and Weight = | 1875.898 | 3,002,657 | USD | 3,626,712 | (õ¿ø) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
0. Project Description (Tank No.) | 1. Design Code | 2. Containment System | 3. ³»¿ÜÁ¶±¸ºÐ | 4. Content | 16. SG | 18. Design Pressure (MPa) | 19. Design temperature (¡É) | 10. Diameter (mm) | 11. Height (mm) | 13. CA (mm) | 12. Joint Efficiency | 14. DLL (mm) | 15. HTL (mm) |
ÇÑÈ-´ë»ê LPG | API 620 | FULL | OUTER | LPG | 0.5814 | 0.01471 | -45 | 64200 | 42200 | 1.5 | 1 | 33980 | 19743 |
1. [OUTER TANK] Shell Plate | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Net WT (Ton) | Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark |
12 th Shell Plate | A537-CL2+S5 | 16.0 | 840 | 12608 | 16 | 21.280 | 12 | A537-CL2+S5 | 16.0 | 890 | 12650 | 17 | 24.038 | 12.96 | 1,541.67 | 37,059 | 1,850.00 | 44,470 | Stiff and jig ºÎÂø PAD PLATE 1 Sheet Æ÷ÇÔ |
11 th Shell Plate | A537-CL2+S5 | 16.0 | 3760 | 12608 | 16 | 95.264 | 11 | A537-CL2+S5 | 16.0 | 3810 | 12650 | 16 | 96.848 | 1.66 | 1,541.67 | 149,308 | 1,850.00 | 179,169 | |
10 th Shell Plate | A537-CL2+S5 | 16.0 | 3760 | 12608 | 16 | 95.264 | 10 | A537-CL2+S5 | 16.0 | 3810 | 12650 | 16 | 96.848 | 1.66 | 1,541.67 | 149,308 | 1,850.00 | 179,169 | |
9 th Shell Plate | A537-CL2+S5 | 17.0 | 3760 | 12608 | 16 | 101.216 | 9 | A537-CL2+S5 | 17.0 | 3810 | 12650 | 16 | 102.912 | 1.68 | 1,541.67 | 158,656 | 1,850.00 | 190,387 | |
8 th Shell Plate | A537-CL2+S5 | 17.0 | 3760 | 12608 | 16 | 101.216 | 8 | A537-CL2+S5 | 17.0 | 3810 | 12650 | 16 | 102.912 | 1.68 | 1,541.67 | 158,656 | 1,850.00 | 190,387 | |
7 th Shell Plate | A537-CL2+S5 | 19.0 | 3760 | 12609 | 16 | 113.136 | 7 | A537-CL2+S5 | 19.0 | 3810 | 12650 | 16 | 115.024 | 1.67 | 1,541.67 | 177,329 | 1,850.00 | 212,794 | |
6 th Shell Plate | A537-CL2+S5 | 23.0 | 3760 | 12610 | 16 | 136.976 | 6 | A537-CL2+S5 | 23.0 | 3810 | 12660 | 16 | 139.344 | 1.73 | 1,541.67 | 214,822 | 1,850.00 | 257,786 | |
5 th Shell Plate | A537-CL2+S5 | 27.0 | 3760 | 12610 | 16 | 160.784 | 5 | A537-CL2+S5 | 27.0 | 3810 | 12660 | 16 | 163.568 | 1.73 | 1,541.67 | 252,168 | 1,850.00 | 302,601 | |
4 th Shell Plate | A537-CL2+S5 | 31.0 | 3760 | 12611 | 16 | 184.624 | 4 | A537-CL2+S5 | 31.0 | 3810 | 12660 | 16 | 187.808 | 1.72 | 1,541.67 | 289,538 | 1,850.00 | 347,445 | |
3 rd Shell Plate | A537-CL2+S5 | 35.0 | 3760 | 12612 | 16 | 208.464 | 3 | A537-CL2+S5 | 35.0 | 3810 | 12660 | 16 | 212.032 | 1.71 | 1,541.67 | 326,883 | 1,850.00 | 392,259 | |
2 nd Shell Plate | A537-CL2+S5 | 39.0 | 3760 | 12613 | 16 | 232.304 | 2 | A537-CL2+S5 | 39.0 | 3810 | 12660 | 16 | 236.272 | 1.71 | 1,541.67 | 364,253 | 1,850.00 | 437,103 | |
1 st Shell Plate | A537-CL2+S5 | 43.0 | 3760 | 12614 | 16 | 256.160 | 1 | A537-CL2+S5 | 43.0 | 3810 | 12660 | 17 | 276.794 | 8.06 | 1,541.67 | 426,725 | 1,850.00 | 512,069 | 1st Shell Nozzzle and Openning PAD PLATE 1 Sheet Æ÷ÇÔ |
[OUTER TANK] Shell Plate Total = | 192 | 1706.688 | Total Qty and Weight = | 194 | 1754.400 | 2.8 | 1,541.67 | 2,704,706 | 1,850.00 | 3,245,640 | (õ¿ø) | ||||||||
2. [OUTER TANK] Bottom / Annular / Roof Plate / Knuckle / Suspended Deck | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Part Name | Material | Shell Course No. | Qty (SHT) | Net WT (Ton) | Thickness Range (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark | ||||
1. Bottom Plate | A516-60N+S5 | 8.0 | 2438 | 6096 | 179.90 | 167.890 | 1 | A516-60N+S5 | 8.0 | 2438 | 6096 | 191 | 178.203 | 6.14 | 1,300.00 | 231,664 | 1,690.00 | 301,163 | |
2. Annular Plate | A537-CL1+S5 | 28.0 | 2438 | 6096 | 40.40 | 132.070 | 2 | A537-CL1+S5 | 28.0 | 2438 | 6096 | 47 | 153.549 | 16.26 | 1,300.00 | 199,614 | 1,690.00 | 259,498 | |
3. Roof Plate | A516-60 | 6.0 | 2438 | 6096 | 242.60 | 169.830 | 3 | A516-60 | 6.0 | 2438 | 6096 | 260 | 182.000 | 7.17 | 1,300.00 | 236,600 | 1,690.00 | 307,580 | |
4. Knuckle Plate | A516-70 | 38.0 | 2124 | 5763 | 35.00 | 127.798 | 4 | A516-70 | 38.0 | 2274 | 5913 | 37 | 148.407 | 16.13 | 1,312.00 | 194,710 | 1,690.00 | 250,808 | |
5. Suspended Deck | Aluminum OR CS | 6.5 | 2438 | 6096 | 1 SET | 279.137 | 5 | Aluminum OR CS | 6.5 | 2438 | 6096 | 1 | 279.137 | 10.00 | 1,300.00 | 399,166 | 1,690.00 | 518,916 | Áß·® »êÃâ±Ù°Å : ¾Ë·ç¹Ì´½ ¸éÀû´ç : 40.0 kg/m©÷* 3.237 (m©÷) |
[OUTER TANK] Bottom / Annular / Total = | 876.725 | Total Qty and Weight = | 969.210 | 1,261,754 | USD | 1,637,965 | (õ¿ø) | ||||||||||||
[OUTER TANK] Grand Total = | 2583.413 | Grand Total Qty and Weight = | 2723.610 | 3,966,460 | USD | 4,883,605 | (õ¿ø) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
0. Project Description (Tank No.) | 1. Design Code | 2. Containment System | 3. ³»¿ÜÁ¶±¸ºÐ | 4. Content | 16. SG | 18. Design Pressure (MPa) | 19. Design temperature (¡É) | 10. Diameter (mm) | 11. Height (mm) | 13. CA (mm) | 12. Joint Efficiency | 14. DLL (mm) | 15. HTL (mm) |
T-201 SUMBAWA 50000 KL LNG | API 620 | FULL | INNER | LNG | 0.4797 | 0 | -170 | 60000 | 23370 | 0 | 1 | 20240 | 9690 |
1. [INNER TANK] Shell Plate | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Net WT (Ton) | Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark |
6 th Shell Plate | A553-TYPE1 | 11.0 | 3880 | 11783 | 16 | 63.168 | 6 | A553-TYPE1 | 11.0 | 3930 | 11830 | 17 | 68.255 | 8.05 | 5,090.00 | 347,418 | 6,265.79 | 427,672 | Stiff and jig ºÎÂø PAD PLATE 1 Sheet Æ÷ÇÔ |
5 th Shell Plate | A553-TYPE1 | 11.0 | 3880 | 11783 | 16 | 63.168 | 5 | A553-TYPE1 | 11.0 | 3930 | 11830 | 16 | 64.240 | 1.7 | 5,090.00 | 326,982 | 6,265.79 | 402,514 | |
4 th Shell Plate | A553-TYPE1 | 11.0 | 3880 | 11783 | 16 | 63.168 | 4 | A553-TYPE1 | 11.0 | 3930 | 11830 | 16 | 64.240 | 1.7 | 5,090.00 | 326,982 | 6,265.79 | 402,514 | |
3 rd Shell Plate | A553-TYPE1 | 12.0 | 3910 | 11783 | 16 | 69.440 | 3 | A553-TYPE1 | 12.0 | 3960 | 11830 | 16 | 70.608 | 1.68 | 5,090.00 | 359,395 | 6,265.79 | 442,415 | |
2 nd Shell Plate | A553-TYPE1 | 14.0 | 3910 | 11783 | 16 | 81.008 | 2 | A553-TYPE1 | 14.0 | 3960 | 11830 | 16 | 82.368 | 1.68 | 5,090.00 | 419,253 | 6,265.79 | 516,101 | |
1 st Shell Plate | A553-TYPE1 | 16.5 | 3910 | 11784 | 16 | 95.488 | 1 | A553-TYPE1 | 16.5 | 3960 | 11830 | 17 | 103.156 | 8.03 | 5,090.00 | 525,064 | 6,265.79 | 646,354 | 1st Shell Nozzzle and Openning PAD PLATE 1 Sheet Æ÷ÇÔ |
[INNER TANK] Shell Plate Total = | 96 | 435.440 | Total Qty and Weight = | 98 | 452.867 | 4.0 | 5,090.00 | 2,305,093 | 6,265.79 | 2,837,570 | (õ¿ø) | ||||||||
2. [INNER TANK] Bottom / Annular Plate / Stiffener Ring | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Part Name | Material | Shell Course No. | Qty (SHT) | Net WT (Ton) | Thickness Range (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark | ||||
1. Bottom Plate | A553-TYPE1 | 5.0 | 2438 | 6096 | 177.70 | 103.640 | 1 | A553-TYPE1 | 5.0 | 2438 | 6096 | 189 | 110.187 | 6.32 | 5,090.00 | 560,852 | 6,265.79 | 690,409 | |
2. Annular Plate | A553-TYPE1 | 11.0 | 2438 | 6096 | 14.30 | 18.300 | 2 | A553-TYPE1 | 11.0 | 2438 | 6096 | 17 | 21.811 | 19.19 | 5,090.00 | 111,018 | 6,265.79 | 136,663 | |
6. Stiffener Ring | A553-TYPE1 | L450x11+120x11 FB 180x11 | 188.0 (m) | 6 Rings | 25.092 | 6 | A553-TYPE1 | ref. | ¿ª°è»ê | ¿ª°è»ê | 6 | 28.856 | 15.00 | 5,090.00 | 146,877 | 6,108.00 | 176,252 | ||
[INNER TANK] Bottom / Annular / Total = | 147.032 | Total Qty and Weight = | 160.854 | 818,747 | USD | 1,003,324 | (õ¿ø) | ||||||||||||
[INNER TANK] Grand Total = | 582.472 | Grand Total Qty and Weight = | 613.721 | 3,123,840 | USD | 3,840,894 | (õ¿ø) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
0. Project Description (Tank No.) | 1. Design Code | 2. Containment System | 3. ³»¿ÜÁ¶±¸ºÐ | 4. Content | 16. SG | 18. Design Pressure (MPa) | 19. Design temperature (¡É) | 10. Diameter (mm) | 11. Height (mm) | 13. CA (mm) | 12. Joint Efficiency | 14. DLL (mm) | 15. HTL (mm) |
T-201 SUMBAWA 50000 KL LNG | API 620 | FULL | OUTER | LNG | 0.4797 | 0.022 | -170 | 62000 | 24140 | 0 | 1 | 20240 | 9690 |
1. [OUTER TANK] Shell Plate | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Net WT (Ton) | Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark |
7 th Shell Plate | A553-TYPE1 | 13.0 | 3440 | 12176 | 16 | 68.384 | 7 | A553-TYPE1 | 13.0 | 3490 | 12220 | 17 | 73.984 | 8.19 | 5,090.00 | 376,579 | 6,265.79 | 463,568 | Stiff and jig ºÎÂø PAD PLATE 1 Sheet Æ÷ÇÔ |
6 th Shell Plate | A553-TYPE1 | 13.0 | 3450 | 12176 | 16 | 68.592 | 6 | A553-TYPE1 | 13.0 | 3500 | 12220 | 16 | 69.840 | 1.82 | 5,090.00 | 355,486 | 6,265.79 | 437,603 | |
5 th Shell Plate | A553-TYPE1 | 13.5 | 3450 | 12176 | 16 | 71.232 | 5 | A553-TYPE1 | 13.5 | 3500 | 12220 | 16 | 72.528 | 1.82 | 5,090.00 | 369,168 | 6,265.79 | 454,445 | |
4 th Shell Plate | A553-TYPE1 | 14.5 | 3450 | 12176 | 16 | 76.496 | 4 | A553-TYPE1 | 14.5 | 3500 | 12220 | 16 | 77.888 | 1.82 | 5,090.00 | 396,450 | 6,265.79 | 488,030 | |
3 rd Shell Plate | A553-TYPE1 | 16.0 | 3450 | 12176 | 16 | 84.416 | 3 | A553-TYPE1 | 16.0 | 3500 | 12220 | 16 | 85.952 | 1.82 | 5,090.00 | 437,496 | 6,265.79 | 538,557 | |
2 nd Shell Plate | A553-TYPE1 | 18.0 | 3450 | 12177 | 16 | 94.976 | 2 | A553-TYPE1 | 18.0 | 3500 | 12220 | 16 | 96.688 | 1.8 | 5,090.00 | 492,142 | 6,265.79 | 605,827 | |
1 st Shell Plate | A553-TYPE1 | 20.0 | 3450 | 12177 | 16 | 105.536 | 1 | A553-TYPE1 | 20.0 | 3500 | 12220 | 17 | 114.155 | 8.17 | 5,090.00 | 581,049 | 6,265.79 | 715,271 | 1st Shell Nozzzle and Openning PAD PLATE 1 Sheet Æ÷ÇÔ |
[OUTER TANK] Shell Plate Total = | 112 | 569.632 | Total Qty and Weight = | 114 | 591.035 | 3.76 | 5,090.00 | 3,008,368 | 6,265.79 | 3,703,301 | (õ¿ø) | ||||||||
2. [OUTER TANK] Bottom / Annular / Roof Plate / Knuckle / Suspended Deck | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Part Name | Material | Shell Course No. | Qty (SHT) | Net WT (Ton) | Thickness Range (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark | ||||
1. Bottom Plate | A553-TYPE1 | 5.0 | 2438 | 6096 | 175.90 | 102.630 | 1 | A553-TYPE1 | 5.0 | 2438 | 6096 | 187 | 109.021 | 6.23 | 5,090.00 | 554,917 | 6,265.79 | 683,103 | |
2. Annular Plate | A553-TYPE1 | 13.0 | 2438 | 6096 | 29.00 | 44.010 | 2 | A553-TYPE1 | 13.0 | 2438 | 6096 | 34 | 51.578 | 17.20 | 5,090.00 | 262,532 | 6,265.79 | 323,177 | |
3. Roof Plate | A516-60 | 7.0 | 2438 | 6096 | 232.70 | 190.060 | 3 | A516-60 | 7.0 | 2438 | 6096 | 250 | 204.250 | 7.47 | 1,300.00 | 265,525 | 1,690.00 | 345,182 | |
4. Knuckle Plate | A516-60 | 43.0 | 2369 | 5729 | 34.00 | 155.762 | 4 | A516-60 | 43.0 | 2519 | 5879 | 36 | 179.964 | 15.54 | 1,300.00 | 233,953 | 1,690.00 | 304,139 | |
5. Suspended Deck | Aluminum OR CS | 1.2 | 2438 | 6096 | 1 SET | 120.763 | 5 | Aluminum OR CS | 1.2 | 2438 | 6096 | 1 | 120.763 | 10.00 | 1,300.00 | 172,691 | 1,690.00 | 224,498 | Áß·® »êÃâ±Ù°Å : ¾Ë·ç¹Ì´½ ¸éÀû´ç : 40.0 kg/m©÷* 3.019 (m©÷) |
[OUTER TANK] Bottom / Annular / Total = | 613.225 | Total Qty and Weight = | 677.652 | 1,489,618 | USD | 1,880,099 | (õ¿ø) | ||||||||||||
[OUTER TANK] Grand Total = | 1182.857 | Grand Total Qty and Weight = | 1268.687 | 4,497,986 | USD | 5,583,400 | (õ¿ø) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
0. Project Description (Tank No.) | 1. Design Code | 2. Containment System | 3. ³»¿ÜÁ¶±¸ºÐ | 4. Content | 16. SG | 18. Design Pressure (MPa) | 19. Design temperature (¡É) | 10. Diameter (mm) | 11. Height (mm) | 13. CA (mm) | 12. Joint Efficiency | 14. DLL (mm) | 15. HTL (mm) |
[T201] CAP2 LP Ethylene | API 620 | FULL | INNER | LNG | 0.568 | 0 | -104 | 46300 | 16300 | 1.5 | 1 | 14500 | 7782 |
1. [INNER TANK] Shell Plate | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Net WT (Ton) | Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark |
5 th Shell Plate | A553-TYPE1 | 10.0 | 3260 | 14548 | 10 | 37.230 | 5 | A553-TYPE1 | 10.0 | 3310 | 14590 | 11 | 41.701 | 12.01 | 5,353.50 | 223,246 | 6,957.00 | 290,114 | Stiff and jig ºÎÂø PAD PLATE 1 Sheet Æ÷ÇÔ |
4 th Shell Plate | A553-TYPE1 | 11.0 | 3260 | 14549 | 10 | 40.960 | 4 | A553-TYPE1 | 11.0 | 3310 | 14590 | 10 | 41.700 | 1.81 | 5,353.50 | 223,241 | 6,957.00 | 290,107 | |
3 rd Shell Plate | A553-TYPE1 | 14.0 | 3260 | 14549 | 10 | 52.130 | 3 | A553-TYPE1 | 14.0 | 3310 | 14590 | 10 | 53.070 | 1.8 | 5,353.50 | 284,110 | 6,957.00 | 369,208 | |
2 nd Shell Plate | A553-TYPE1 | 18.0 | 3260 | 14551 | 10 | 67.030 | 2 | A553-TYPE1 | 18.0 | 3310 | 14600 | 10 | 68.280 | 1.86 | 5,353.50 | 365,537 | 6,957.00 | 475,024 | |
1 st Shell Plate | A553-TYPE1 | 20.0 | 3260 | 14551 | 10 | 74.470 | 1 | A553-TYPE1 | 20.0 | 3310 | 14600 | 11 | 83.457 | 12.07 | 5,353.50 | 446,787 | 6,957.00 | 580,610 | 1st Shell Nozzzle and Openning PAD PLATE 1 Sheet Æ÷ÇÔ |
[INNER TANK] Shell Plate Total = | 50 | 271.820 | Total Qty and Weight = | 52 | 288.208 | 6.03 | 5,353.50 | 1,542,922 | 6,957.00 | 2,005,063 | (õ¿ø) | ||||||||
2. [INNER TANK] Bottom / Annular Plate / Stiffener Ring | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Part Name | Material | Shell Course No. | Qty (SHT) | Net WT (Ton) | Thickness Range (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark | ||||
1. Bottom Plate | A553-TYPE1 | 6.5 | 3048 | 12192 | 40.40 | 76.580 | 1 | A553-TYPE1 | 6.5 | 3048 | 12192 | 43 | 81.528 | 6.46 | 5,353.50 | 436,460 | 6,957.00 | 567,190 | |
2. Annular Plate | A553-TYPE1 | 13.0 | 2438 | 6096 | 13.70 | 20.730 | 2 | A553-TYPE1 | 13.0 | 2438 | 6096 | 16 | 24.272 | 17.09 | 5,353.50 | 129,940 | 6,957.00 | 168,860 | |
6. Stiffener Ring | A553-TYPE1 | L450x10+120x10 FB 150x11 | 145.0 (m) | 4 Rings | 12.689 | 6 | A553-TYPE1 | ref. | ¿ª°è»ê | ¿ª°è»ê | 4 | 14.592 | 15.00 | 5,353.50 | 78,118 | 6,957.00 | 101,517 | ||
[INNER TANK] Bottom / Annular / Total = | 109.999 | Total Qty and Weight = | 120.392 | 644,519 | USD | 837,567 | (õ¿ø) | ||||||||||||
[INNER TANK] Grand Total = | 381.819 | Grand Total Qty and Weight = | 408.600 | 2,187,440 | USD | 2,842,630 | (õ¿ø) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
0. Project Description (Tank No.) | 1. Design Code | 2. Containment System | 3. ³»¿ÜÁ¶±¸ºÐ | 4. Content | 16. SG | 18. Design Pressure (MPa) | 19. Design temperature (¡É) | 10. Diameter (mm) | 11. Height (mm) | 13. CA (mm) | 12. Joint Efficiency | 14. DLL (mm) | 15. HTL (mm) |
[T201] CAP2 LP Ethylene | API 620 | FULL | OUTER | LNG | 0.568 | 0.0196133 | -104 | 48300 | 18400 | 1.5 | 1 | 14500 | 12718 |
1. [OUTER TANK] Shell Plate | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Net WT (Ton) | Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark |
6 th Shell Plate | A553-TYPE1 | 45.5 | 400 | 12656 | 12 | 21.696 | 6 | A553-TYPE1 | 45.5 | 450 | 12700 | 12 | 24.492 | 12.89 | 5,353.50 | 131,118 | 6,957.00 | 170,391 | This shell plate is Compression Ring |
5 th Shell Plate | A553-TYPE1 | 12.0 | 3600 | 12648 | 12 | 51.468 | 5 | A553-TYPE1 | 12.0 | 3650 | 12690 | 13 | 56.719 | 10.2 | 5,353.50 | 303,645 | 6,957.00 | 394,594 | Stiff and jig ºÎÂø PAD PLATE 1 Sheet Æ÷ÇÔ |
4 th Shell Plate | A553-TYPE1 | 12.0 | 3600 | 12648 | 12 | 51.468 | 4 | A553-TYPE1 | 12.0 | 3650 | 12690 | 12 | 52.356 | 1.73 | 5,353.50 | 280,288 | 6,957.00 | 364,241 | |
3 rd Shell Plate | A553-TYPE1 | 13.0 | 3600 | 12648 | 12 | 55.764 | 3 | A553-TYPE1 | 13.0 | 3650 | 12690 | 12 | 56.724 | 1.72 | 5,353.50 | 303,672 | 6,957.00 | 394,629 | |
2 nd Shell Plate | A553-TYPE1 | 15.0 | 3600 | 12648 | 12 | 64.332 | 2 | A553-TYPE1 | 15.0 | 3650 | 12690 | 12 | 65.448 | 1.73 | 5,353.50 | 350,376 | 6,957.00 | 455,322 | |
1 st Shell Plate | A553-TYPE1 | 16.0 | 3600 | 12649 | 12 | 68.628 | 1 | A553-TYPE1 | 16.0 | 3650 | 12690 | 13 | 75.634 | 10.21 | 5,353.50 | 404,907 | 6,957.00 | 526,186 | 1st Shell Nozzzle and Openning PAD PLATE 1 Sheet Æ÷ÇÔ |
[OUTER TANK] Shell Plate Total = | 72 | 313.356 | Total Qty and Weight = | 74 | 331.373 | 5.75 | 5,353.50 | 1,774,005 | 6,957.00 | 2,305,362 | (õ¿ø) | ||||||||
2. [OUTER TANK] Bottom / Annular / Roof Plate / Compression Ring / Suspended Deck | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Part Name | Material | Shell Course No. | Qty (SHT) | Net WT (Ton) | Thickness Range (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark | ||||
1. Bottom Plate | A553-TYPE1 | 6.5 | 2438 | 6096 | 99.70 | 75.640 | 1 | A553-TYPE1 | 6.5 | 2438 | 6096 | 106 | 80.348 | 6.22 | 5,353.50 | 430,143 | 6,957.00 | 558,981 | |
2. Annular Plate | A553-TYPE1 | 10.5 | 2438 | 6096 | 24.80 | 30.440 | 2 | A553-TYPE1 | 10.5 | 2438 | 6096 | 29 | 35.525 | 16.70 | 5,353.50 | 190,183 | 6,957.00 | 247,147 | |
3. Roof Plate | A516-70 | 6.5 | 2438 | 6096 | 137.30 | 104.140 | 3 | A516-70 | 6.5 | 2438 | 6096 | 147 | 111.426 | 7.00 | 1,312.00 | 146,191 | 1,690.00 | 188,310 | |
4. Comp. Ring | A516-70 | 45.5 | 840 | 4463 | 34.00 | 44.962 | 4 | A516-70 | 45.5 | 990 | 4613 | 36 | 58.716 | 30.59 | 1,312.00 | 77,035 | 1,690.00 | 99,230 | |
5. Suspended Deck | Aluminum OR CS | 1.2 | 2438 | 6096 | 1 SET | 73.29 | 5 | Aluminum OR CS | 1.2 | 2438 | 6096 | 1 | 73.29 | 10.00 | 1,300.00 | 104,805 | 1,690.00 | 136,246 | Áß·® »êÃâ±Ù°Å : ¾Ë·ç¹Ì´½ ¸éÀû´ç : 40.0 kg/m©÷* 1.832 (m©÷) |
[OUTER TANK] Bottom / Annular / Total = | 328.472 | Total Qty and Weight = | 366.634 | 948,357 | USD | 1,229,915 | (õ¿ø) | ||||||||||||
[OUTER TANK] Grand Total = | 641.828 | Grand Total Qty and Weight = | 698.007 | 2,722,362 | USD | 3,535,277 | (õ¿ø) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
0. Project Description (Tank No.) | 1. Design Code | 2. Containment System | 3. ³»¿ÜÁ¶±¸ºÐ | 4. Content | 16. SG | 18. Design Pressure (MPa) | 19. Design temperature (¡É) | 10. Diameter (mm) | 11. Height (mm) | 13. CA (mm) | 12. Joint Efficiency | 14. DLL (mm) | 15. HTL (mm) |
[301] CAP2 Propane(C3/C4) | API 620 | FULL | INNER | LNG | 0.604 | 0 | -44 | 70000 | 27500 | 1.5 | 1 | 24750 | 21300 |
1. [INNER TANK] Shell Plate | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Net WT (Ton) | Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark |
9 th Shell Plate | A537-CL2+S5 | 9.525 | 3052 | 13746 | 16 | 50.192 | 9 | A537-CL2+S5 | 9.525 | 3102 | 13790 | 17 | 54.366 | 8.32 | 1,541.67 | 83,814 | 1,850.00 | 100,577 | Stiff and jig ºÎÂø PAD PLATE 1 Sheet Æ÷ÇÔ |
8 th Shell Plate | A537-CL2+S5 | 12.0 | 3056 | 13746 | 16 | 63.312 | 8 | A537-CL2+S5 | 12.0 | 3106 | 13790 | 16 | 64.560 | 1.97 | 1,541.67 | 99,530 | 1,850.00 | 119,436 | |
7 th Shell Plate | A537-CL2+S5 | 14.0 | 3056 | 13747 | 16 | 73.872 | 7 | A537-CL2+S5 | 14.0 | 3106 | 13790 | 16 | 75.312 | 1.95 | 1,541.67 | 116,106 | 1,850.00 | 139,327 | |
6 th Shell Plate | A537-CL2+S5 | 18.0 | 3056 | 13748 | 16 | 94.992 | 6 | A537-CL2+S5 | 18.0 | 3106 | 13790 | 16 | 96.832 | 1.94 | 1,541.67 | 149,283 | 1,850.00 | 179,139 | |
5 th Shell Plate | A537-CL2+S5 | 24.0 | 3056 | 13749 | 16 | 126.656 | 5 | A537-CL2+S5 | 24.0 | 3106 | 13790 | 16 | 129.104 | 1.93 | 1,541.67 | 199,036 | 1,850.00 | 238,842 | |
4 th Shell Plate | A537-CL2+S5 | 29.0 | 3056 | 13750 | 16 | 153.056 | 4 | A537-CL2+S5 | 29.0 | 3106 | 13800 | 16 | 156.128 | 2.01 | 1,541.67 | 240,698 | 1,850.00 | 288,837 | |
3 rd Shell Plate | A537-CL2+S5 | 34.0 | 3056 | 13751 | 16 | 179.456 | 3 | A537-CL2+S5 | 34.0 | 3106 | 13800 | 16 | 183.040 | 2.0 | 1,541.67 | 282,187 | 1,850.00 | 338,624 | |
2 nd Shell Plate | A537-CL2+S5 | 38.0 | 3056 | 13751 | 16 | 200.560 | 2 | A537-CL2+S5 | 38.0 | 3106 | 13800 | 16 | 204.576 | 2.0 | 1,541.67 | 315,389 | 1,850.00 | 378,466 | |
1 st Shell Plate | A537-CL2+S5 | 41.0 | 3056 | 13752 | 16 | 216.416 | 1 | A537-CL2+S5 | 41.0 | 3106 | 13800 | 17 | 234.515 | 8.36 | 1,541.67 | 361,545 | 1,850.00 | 433,853 | 1st Shell Nozzzle and Openning PAD PLATE 1 Sheet Æ÷ÇÔ |
[INNER TANK] Shell Plate Total = | 144 | 1158.512 | Total Qty and Weight = | 146 | 1198.433 | 3.45 | 1,541.67 | 1,847,588 | 1,850.00 | 2,217,101 | (õ¿ø) | ||||||||
2. [INNER TANK] Bottom / Annular Plate / Stiffener Ring | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Part Name | Material | Shell Course No. | Qty (SHT) | Net WT (Ton) | Thickness Range (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark | ||||
1. Bottom Plate | A537-CL2+S5 | 8.0 | 2438 | 6096 | 229.80 | 214.490 | 1 | A537-CL2+S5 | 8.0 | 2438 | 6096 | 244 | 227.652 | 6.14 | 1,541.67 | 350,964 | 1,850.00 | 421,156 | |
2. Annular Plate | A537-CL2+S5 | 27.0 | 2438 | 6096 | 31.80 | 100.240 | 2 | A537-CL2+S5 | 27.0 | 2438 | 6096 | 37 | 116.550 | 16.27 | 1,541.67 | 179,682 | 1,850.00 | 215,618 | |
6. Stiffener Ring | A537-CL2+S5 | L450x9.525+120x9.525 FB 170x12 | 220.0 (m) | 5 Rings | 33.961 | 6 | A537-CL2+S5 | ref. | ¿ª°è»ê | ¿ª°è»ê | 5 | 39.055 | 15.00 | 5,090.00 | 198,790 | 6,108.00 | 238,548 | ||
[INNER TANK] Bottom / Annular / Total = | 348.691 | Total Qty and Weight = | 383.257 | 729,436 | USD | 875,322 | (õ¿ø) | ||||||||||||
[INNER TANK] Grand Total = | 1507.203 | Grand Total Qty and Weight = | 1581.690 | 2,577,024 | USD | 3,092,423 | (õ¿ø) |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
0. Project Description (Tank No.) | 1. Design Code | 2. Containment System | 3. ³»¿ÜÁ¶±¸ºÐ | 4. Content | 16. SG | 18. Design Pressure (MPa) | 19. Design temperature (¡É) | 10. Diameter (mm) | 11. Height (mm) | 13. CA (mm) | 12. Joint Efficiency | 14. DLL (mm) | 15. HTL (mm) |
[301] CAP2 Propane(C3/C4) | API 620 | FULL | OUTER | LNG | 0.604 | 0.01962 | -44 | 72000 | 30000 | 1.5 | 1 | 20189 | 20189 |
1. [OUTER TANK] Shell Plate | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Net WT (Ton) | Shell Course No. | Material | Thk. (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark |
10 th Shell Plate | A537-CL2+S5 | 18.0 | 3000 | 12569 | 18 | 95.904 | 10 | A537-CL2+S5 | 18.0 | 3050 | 12610 | 19 | 103.246 | 7.66 | 1,541.67 | 159,171 | 1,850.00 | 191,005 | Stiff and jig ºÎÂø PAD PLATE 1 Sheet Æ÷ÇÔ |
9 th Shell Plate | A537-CL2+S5 | 18.0 | 3000 | 12569 | 18 | 95.904 | 9 | A537-CL2+S5 | 18.0 | 3050 | 12610 | 18 | 97.812 | 1.99 | 1,541.67 | 150,794 | 1,850.00 | 180,952 | |
8 th Shell Plate | A537-CL2+S5 | 18.0 | 3000 | 12569 | 18 | 95.904 | 8 | A537-CL2+S5 | 18.0 | 3050 | 12610 | 18 | 97.812 | 1.99 | 1,541.67 | 150,794 | 1,850.00 | 180,952 | |
7 th Shell Plate | A537-CL2+S5 | 18.0 | 3000 | 12569 | 18 | 95.904 | 7 | A537-CL2+S5 | 18.0 | 3050 | 12610 | 18 | 97.812 | 1.99 | 1,541.67 | 150,794 | 1,850.00 | 180,952 | |
6 th Shell Plate | A537-CL2+S5 | 18.0 | 3000 | 12569 | 18 | 95.904 | 6 | A537-CL2+S5 | 18.0 | 3050 | 12610 | 18 | 97.812 | 1.99 | 1,541.67 | 150,794 | 1,850.00 | 180,952 | |
5 th Shell Plate | A537-CL2+S5 | 19.0 | 3000 | 12569 | 18 | 101.232 | 5 | A537-CL2+S5 | 19.0 | 3050 | 12610 | 18 | 103.248 | 1.99 | 1,541.67 | 159,174 | 1,850.00 | 191,009 | |
4 th Shell Plate | A537-CL2+S5 | 23.0 | 3000 | 12570 | 18 | 122.562 | 4 | A537-CL2+S5 | 23.0 | 3050 | 12620 | 18 | 125.100 | 2.07 | 1,541.67 | 192,863 | 1,850.00 | 231,435 | |
3 rd Shell Plate | A537-CL2+S5 | 26.0 | 3000 | 12570 | 18 | 138.546 | 3 | A537-CL2+S5 | 26.0 | 3050 | 12620 | 18 | 141.408 | 2.07 | 1,541.67 | 218,004 | 1,850.00 | 261,605 | |
2 nd Shell Plate | A537-CL2+S5 | 30.0 | 3000 | 12571 | 18 | 159.858 | 2 | A537-CL2+S5 | 30.0 | 3050 | 12620 | 18 | 163.170 | 2.07 | 1,541.67 | 251,554 | 1,850.00 | 301,864 | |
1 st Shell Plate | A537-CL2+S5 | 34.0 | 3000 | 12572 | 18 | 181.188 | 1 | A537-CL2+S5 | 34.0 | 3050 | 12620 | 19 | 195.187 | 7.73 | 1,541.67 | 300,914 | 1,850.00 | 361,096 | 1st Shell Nozzzle and Openning PAD PLATE 1 Sheet Æ÷ÇÔ |
[OUTER TANK] Shell Plate Total = | 180 | 1182.906 | Total Qty and Weight = | 182 | 1222.607 | 3.36 | 1,541.67 | 1,884,857 | 1,850.00 | 2,261,823 | (õ¿ø) | ||||||||
2. [OUTER TANK] Bottom / Annular / Roof Plate / Knuckle / Suspended Deck | |||||||||||||||||||
Net Weight (¼³°èÁß·®) | Gross Weight (ÀÚÀ籸¸Å Áß·®) | ÀÚÀ籸¸Å°¡°Ý Shell Plate Purchsing Price | Remark | ||||||||||||||||
Part Name | Material | Shell Course No. | Qty (SHT) | Net WT (Ton) | Thickness Range (mm) | Width (mm) | Length (mm) | Qty (SHT) | Gross WT (Ton) | Loss Grs/net Ratio(%) | ¼öÀÔ ÀÚÀç´Ü°¡ (USD/Ton) | ¼öÀÔ ÀÚÀç±Ý¾× (USD) | ³»¼ö ÀÚÀç´Ü°¡ (õ¿ø/Ton) | ³»¼ö ÀÚÀç±Ý¾× (õ¿ø) | Remark | ||||
1. Bottom Plate | A516-60N+S5 | 8.0 | 2438 | 6096 | 227.40 | 212.280 | 1 | A516-60N+S5 | 8.0 | 2438 | 6096 | 242 | 225.786 | 6.36 | 1,300.00 | 293,522 | 1,690.00 | 381,578 | |
2. Annular Plate | A537-CL2+S5 | 22.5 | 2438 | 6096 | 49.00 | 128.710 | 2 | A537-CL2+S5 | 22.5 | 2438 | 6096 | 57 | 149.625 | 16.25 | 1,541.67 | 230,672 | 1,850.00 | 276,806 | |
3. Roof Plate | A516-70 | 8.5 | 2438 | 6096 | 305.10 | 302.600 | 3 | A516-70 | 8.5 | 2438 | 6096 | 327 | 324.384 | 7.20 | 1,312.00 | 425,592 | 1,690.00 | 548,209 | |
4. Knuckle Plate | A516-70 | 51.0 | 2382 | 5800 | 39.00 | 215.712 | 4 | A516-70 | 51.0 | 2532 | 5950 | 41 | 247.271 | 14.63 | 1,312.00 | 324,420 | 1,690.00 | 417,888 | |
5. Suspended Deck | Aluminum OR CS | 1.2 | 2438 | 6096 | 1 SET | 162.86 | 5 | Aluminum OR CS | 1.2 | 2438 | 6096 | 1 | 162.86 | 10.00 | 1,300.00 | 232,890 | 1,690.00 | 302,757 | Áß·® »êÃâ±Ù°Å : ¾Ë·ç¹Ì´½ ¸éÀû´ç : 40.0 kg/m©÷* 4.072 (m©÷) |
[OUTER TANK] Bottom / Annular / Total = | 1022.162 | Total Qty and Weight = | 1126.212 | 1,507,095 | USD | 1,927,238 | (õ¿ø) | ||||||||||||
[OUTER TANK] Grand Total = | 2205.068 | Grand Total Qty and Weight = | 2348.819 | 3,391,952 | USD | 4,189,061 | (õ¿ø) |
[Table 2] Beam Force[COM] and Moment[BM] Calculation (Purling Location Beam Stress) | ÃÖÀû MAIN RAFTER SIZE °è»ê(ã±â) | ||||||||||||||||||||||||||||||
F0 | F1 | F2 | F3 | F4 | F5 | F6 | F7 | F8 | F9 | F10 | F11 | F12 | F13 | F14 | F15 | F16 | F17 | F18 | F19 | F20 | F21 | F22 | F23 | F24 | F25 | F26 | F27 | F28 | F29 | F30 | F31 |
Rec. No. | From CL degree[i] | È£±æÀÌ ´©Àû(m) | »ç¿ë¾ÈÇÔ SPARE Çʵå | Radius X (m) | Height Y (m) | XN (m) | F7= XN/RR (rad) | HD (m) | F8 (m) | BM (kN-m) | F10 (kN) | SF (kN) | COM (kN) | id | RAFTER SIZE | Area (cm2) | Sx (cm3) | Unit Wt (kg/m) | fc=COM/A (MPa) | Fc (MPa) | SRc= fc/Fc (MPa) | fb=BM/Sx (MPa) | Fb (MPa) | SRb= fb/Fb (MPa) | SR=SRc+SRb SR < 1.0 OK | (1)Rafter Weight (Ton) | RING Qty (EA) | RIMG LEN/1 EA (mm) | RING LEN(m) | (2)Girder Weight (Ton) | (1)+(2) Total Weight (Ton) |
0 | 3.18474 | 3.00155 | 3.000 | 9.017 | 0.000 | 0.000 | 0.000 | 0.000 | 0.693 | -3.575 | 76.720 | 3 | H125X125X6.5X9 | 30.30 | 136 | 23.8 | 25.320 | 59.180 | 0.428 | 0.000 | 146.499 | 0.000 | 0.428 < 0.9 OK! | 7.835 | 80 | 235.62 | 18.85 | 0.449 | 8.284 | ||
1 | 7.55106 | 7.11671 | 7.096 | 8.632 | 4.115 | 0.07621 | 4.096 | 0.385 | -21.079 | 3.878 | -6.248 | 76.644 | 5 | H194X150X6X9 | 39.01 | 277 | 30.6 | 19.647 | 75.178 | 0.261 | 76.097 | 137.991 | 0.551 | 0.752 < 0.9 OK! | 10.074 | 80 | 557.33 | 44.59 | 1.364 | 11.438 | |
2 | 11.91738 | 11.23187 | 11.151 | 7.936 | 8.230 | 0.15241 | 8.151 | 1.080 | -48.077 | 9.577 | -6.489 | 77.123 | 8 | H346X174X6X9 | 52.68 | 642 | 41.4 | 14.640 | 82.465 | 0.178 | 74.886 | 129.769 | 0.577 | 0.666 < 0.9 OK! | 13.629 | 80 | 875.8 | 70.06 | 2.901 | 16.530 | |
3 | 16.28370 | 15.34703 | 15.141 | 6.934 | 12.345 | 0.22862 | 12.141 | 2.083 | -71.535 | 17.657 | -4.585 | 78.671 | 10 | H350X175X7X11 | 63.14 | 777 | 49.6 | 12.460 | 84.211 | 0.148 | 92.066 | 133.739 | 0.688 | 0.762 < 0.9 OK! | 16.328 | 80 | 1189.19 | 95.14 | 4.719 | 21.047 | |
4 | 20.65002 | 19.46219 | 19.044 | 5.631 | 16.461 | 0.30483 | 16.044 | 3.386 | -83.431 | 27.932 | -0.947 | 81.717 | 10 | H350X175X7X11 | 63.14 | 777 | 49.6 | 12.942 | 84.211 | 0.154 | 107.376 | 133.739 | 0.803 | 0.880 < 0.9 OK! | 16.328 | 80 | 1495.68 | 119.65 | 5.935 | 22.263 | |
5 | 25.01635 | 23.57735 | 22.835 | 4.034 | 20.576 | 0.38103 | 19.835 | 4.982 | -77.644 | 40.162 | 3.917 | 86.579 | 10 | H350X175X7X11 | 63.14 | 777 | 49.6 | 13.712 | 84.211 | 0.163 | 99.928 | 133.739 | 0.747 | 0.829 < 0.9 OK! | 16.328 | 80 | 1793.48 | 143.48 | 7.117 | 23.445 | |
6 | 29.38267 | 27.69251 | 26.495 | 2.154 | 24.691 | 0.45724 | 23.495 | 6.863 | -50.300 | 54.065 | 9.429 | 93.448 | 10 | H350X175X7X11 | 63.14 | 777 | 49.6 | 17.739 | 82.465 | 0.215 | 78.349 | 129.769 | 0.604 | 0.752 < 0.9 OK! | 13.629 | 80 | 2080.88 | 166.47 | 8.257 | 21.886 | |
7 | 33.74899 | 31.80767 | 30.000 | 0.000 | 28.806 | 0.53345 | 27.000 | 9.017 | -0.000 | 69.318 | 14.970 | 102.368 | 10 | H350X175X7X11 | 63.14 | 777 | 49.6 | 33.785 | 59.180 | 0.571 | 0.000 | 146.499 | 0.000 | 0.571 < 0.9 OK! | 7.835 | 0 | 0 | 0 | 0.000 | 7.835 | |
Max. Bending Moment(BM) and Vertical Axial Force(COM) | MaxBM = | 83.431 | kN-m | MaxCOM = | 102.368 | kN | Roof Stru Weight (Ton) = | 132.728 | |||||||||||||||||||||||
MaxBM = | 8.508 | ton-m | MaxCOM = | 10.439 | ton |
[Table 2] Beam Force[COM] and Moment[BM] Calculation (Purling Location Beam Stress) | ÃÖÀû MAIN RAFTER SIZE °è»ê(ã±â) | ||||||||||||||||||||||||||||||
F0 | F1 | F2 | F3 | F4 | F5 | F6 | F7 | F8 | F9 | F10 | F11 | F12 | F13 | F14 | F15 | F16 | F17 | F18 | F19 | F20 | F21 | F22 | F23 | F24 | F25 | F26 | F27 | F28 | F29 | F30 | F31 |
Rec. No. | From CL degree[i] | È£±æÀÌ ´©Àû(m) | »ç¿ë¾ÈÇÔ SPARE Çʵå | Radius X (m) | Height Y (m) | XN (m) | F7= XN/RR (rad) | HD (m) | F8 (m) | BM (kN-m) | F10 (kN) | SF (kN) | COM (kN) | id | RAFTER SIZE | Area (cm2) | Sx (cm3) | Unit Wt (kg/m) | fc=COM/A (MPa) | Fc (MPa) | SRc= fc/Fc (MPa) | fb=BM/Sx (MPa) | Fb (MPa) | SRb= fb/Fb (MPa) | SR=SRc+SRb SR < 1.0 OK | (1)Rafter Weight (Ton) | RING Qty (EA) | RIMG LEN/1 EA (mm) | RING LEN(m) | (2)Girder Weight (Ton) | (1)+(2) Total Weight (Ton) |
0 | 6.81540 | 3.00709 | 3.000 | 5.367 | 0.000 | 0.000 | 0.000 | 0.000 | 1.386 | -3.071 | 37.376 | 3 | H125X125X6.5X9 | 30.30 | 136 | 23.8 | 12.335 | 44.909 | 0.275 | 0.000 | 141.371 | 0.000 | 0.275 < 0.9 OK! | 4.462 | 40 | 471.24 | 18.85 | 0.449 | 4.911 | ||
1 | 17.43766 | 7.69383 | 7.576 | 4.384 | 4.687 | 0.18539 | 4.576 | 0.983 | -15.907 | 8.840 | -2.796 | 38.403 | 5 | H194X150X6X9 | 39.01 | 277 | 30.6 | 9.844 | 61.256 | 0.161 | 57.426 | 130.834 | 0.439 | 0.519 < 0.9 OK! | 5.737 | 40 | 1189.97 | 47.6 | 1.457 | 7.194 | |
2 | 28.05993 | 12.38058 | 11.892 | 2.574 | 9.373 | 0.37079 | 8.892 | 2.793 | -19.709 | 21.783 | 1.594 | 43.318 | 5 | H194X150X6X9 | 39.01 | 277 | 30.6 | 11.104 | 61.256 | 0.181 | 71.152 | 130.834 | 0.544 | 0.634 < 0.9 OK! | 5.737 | 40 | 1867.93 | 74.72 | 2.286 | 8.023 | |
3 | 38.68219 | 17.06733 | 15.800 | 0.000 | 14.060 | 0.55618 | 12.800 | 5.367 | 0.000 | 38.455 | 6.596 | 53.289 | 5 | H194X150X6X9 | 39.01 | 277 | 30.6 | 17.587 | 44.909 | 0.392 | 0.000 | 141.371 | 0.000 | 0.392 < 0.9 OK! | 4.462 | 0 | 0 | 0 | 0.000 | 4.462 | |
Max. Bending Moment(BM) and Vertical Axial Force(COM) | MaxBM = | 19.709 | kN-m | MaxCOM = | 53.289 | kN | Roof Stru Weight (Ton) = | 24.59 | |||||||||||||||||||||||
MaxBM = | 2.01 | ton-m | MaxCOM = | 5.434 | ton |
[Table 2] Beam Force[COM] and Moment[BM] Calculation (Purling Location Beam Stress) | ÃÖÀû MAIN RAFTER SIZE °è»ê(ã±â) | ||||||||||||||||||||||||||||||
F0 | F1 | F2 | F3 | F4 | F5 | F6 | F7 | F8 | F9 | F10 | F11 | F12 | F13 | F14 | F15 | F16 | F17 | F18 | F19 | F20 | F21 | F22 | F23 | F24 | F25 | F26 | F27 | F28 | F29 | F30 | F31 |
Rec. No. | From CL degree[i] | È£±æÀÌ ´©Àû(m) | »ç¿ë¾ÈÇÔ SPARE Çʵå | Radius X (m) | Height Y (m) | XN (m) | F7= XN/RR (rad) | HD (m) | F8 (m) | BM (kN-m) | F10 (kN) | SF (kN) | COM (kN) | id | RAFTER SIZE | Area (cm2) | Sx (cm3) | Unit Wt (kg/m) | fc=COM/A (MPa) | Fc (MPa) | SRc= fc/Fc (MPa) | fb=BM/Sx (MPa) | Fb (MPa) | SRb= fb/Fb (MPa) | SR=SRc+SRb SR < 1.0 OK | (1)Rafter Weight (Ton) | RING Qty (EA) | RIMG LEN/1 EA (mm) | RING LEN(m) | (2)Girder Weight (Ton) | (1)+(2) Total Weight (Ton) |
0 | 5.17190 | 3.00408 | 3.000 | 7.165 | 0.000 | 0.000 | 0.000 | 0.000 | 0.990 | -3.154 | 45.826 | 2 | H200X100X5.5X8 | 27.16 | 184 | 21.3 | 16.873 | 29.327 | 0.575 | 0.000 | 107.054 | 0.000 | 0.575 < 0.9 OK! | 4.644 | 56 | 336.6 | 18.85 | 0.401 | 5.045 | ||
1 | 11.87396 | 6.89694 | 6.848 | 6.589 | 3.893 | 0.11697 | 3.848 | 0.577 | -15.694 | 5.159 | -4.400 | 46.002 | 5 | H194X150X6X9 | 39.01 | 277 | 30.6 | 11.792 | 80.815 | 0.146 | 56.657 | 140.769 | 0.402 | 0.475 < 0.9 OK! | 6.671 | 56 | 768.31 | 43.03 | 1.317 | 7.988 | |
2 | 18.57602 | 10.78980 | 10.602 | 5.567 | 7.786 | 0.23395 | 7.602 | 1.598 | -30.688 | 12.367 | -2.907 | 47.471 | 5 | H194X150X6X9 | 39.01 | 277 | 30.6 | 12.169 | 80.815 | 0.151 | 110.787 | 140.769 | 0.787 | 0.862 < 0.9 OK! | 6.671 | 56 | 1189.51 | 66.61 | 2.038 | 8.709 | |
3 | 25.27807 | 14.68266 | 14.211 | 4.114 | 11.679 | 0.35092 | 11.211 | 3.051 | -35.854 | 22.220 | 0.483 | 51.014 | 7 | H300X150X6.5X9 | 46.78 | 481 | 36.7 | 10.905 | 71.266 | 0.153 | 74.541 | 126.960 | 0.587 | 0.664 < 0.9 OK! | 8.001 | 56 | 1594.47 | 89.29 | 3.277 | 11.278 | |
4 | 31.98013 | 18.57552 | 17.626 | 2.250 | 15.571 | 0.46789 | 14.626 | 4.915 | -25.885 | 34.183 | 4.673 | 57.058 | 7 | H300X150X6.5X9 | 46.78 | 481 | 36.7 | 14.627 | 80.815 | 0.181 | 93.448 | 140.769 | 0.664 | 0.754 < 0.9 OK! | 6.671 | 56 | 1977.62 | 110.75 | 4.064 | 10.735 | |
5 | 38.68219 | 22.46838 | 20.800 | 0.000 | 19.464 | 0.58486 | 17.800 | 7.165 | -0.000 | 47.603 | 8.458 | 65.601 | 7 | H300X150X6.5X9 | 46.78 | 481 | 36.7 | 24.154 | 29.327 | 0.824 | 0.000 | 107.054 | 0.000 | 0.824 < 0.9 OK! | 4.644 | 0 | 0 | 0 | 0.000 | 4.644 | |
Max. Bending Moment(BM) and Vertical Axial Force(COM) | MaxBM = | 35.854 | kN-m | MaxCOM = | 65.601 | kN | Roof Stru Weight (Ton) = | 48.399 | |||||||||||||||||||||||
MaxBM = | 3.656 | ton-m | MaxCOM = | 6.689 | ton |
[Table 2] Beam Force[COM] and Moment[BM] Calculation (Purling Location Beam Stress) | ÃÖÀû MAIN RAFTER SIZE °è»ê(ã±â) | ||||||||||||||||||||||||||||||
F0 | F1 | F2 | F3 | F4 | F5 | F6 | F7 | F8 | F9 | F10 | F11 | F12 | F13 | F14 | F15 | F16 | F17 | F18 | F19 | F20 | F21 | F22 | F23 | F24 | F25 | F26 | F27 | F28 | F29 | F30 | F31 |
Rec. No. | From CL degree[i] | È£±æÀÌ ´©Àû(m) | »ç¿ë¾ÈÇÔ SPARE Çʵå | Radius X (m) | Height Y (m) | XN (m) | F7= XN/RR (rad) | HD (m) | F8 (m) | BM (kN-m) | F10 (kN) | SF (kN) | COM (kN) | id | RAFTER SIZE | Area (cm2) | Sx (cm3) | Unit Wt (kg/m) | fc=COM/A (MPa) | Fc (MPa) | SRc= fc/Fc (MPa) | fb=BM/Sx (MPa) | Fb (MPa) | SRb= fb/Fb (MPa) | SR=SRc+SRb SR < 1.0 OK | (1)Rafter Weight (Ton) | RING Qty (EA) | RIMG LEN/1 EA (mm) | RING LEN(m) | (2)Girder Weight (Ton) | (1)+(2) Total Weight (Ton) |
0 | 4.78019 | 3.00348 | 3.000 | 5.942 | 0.000 | 0.000 | 0.000 | 0.000 | 1.066 | -3.354 | 52.907 | 3 | H125X125X6.5X9 | 30.30 | 136 | 23.8 | 17.461 | 48.134 | 0.363 | 0.000 | 142.599 | 0.000 | 0.363 < 0.9 OK! | 5.631 | 52 | 362.49 | 18.85 | 0.449 | 6.080 | ||
1 | 12.02239 | 7.55389 | 7.499 | 5.277 | 4.550 | 0.12640 | 4.499 | 0.664 | -19.627 | 6.663 | -4.523 | 53.227 | 5 | H194X150X6X9 | 39.01 | 277 | 30.6 | 13.644 | 64.491 | 0.212 | 70.856 | 132.548 | 0.535 | 0.687 < 0.9 OK! | 7.240 | 52 | 906.06 | 47.11 | 1.442 | 8.682 | |
2 | 19.26459 | 12.10430 | 11.878 | 4.051 | 9.101 | 0.25280 | 8.878 | 1.891 | -35.089 | 16.716 | -1.707 | 55.550 | 7 | H300X150X6.5X9 | 46.78 | 481 | 36.7 | 11.875 | 54.312 | 0.219 | 72.950 | 114.804 | 0.635 | 0.783 < 0.9 OK! | 8.683 | 52 | 1435.17 | 74.63 | 2.739 | 11.422 | |
3 | 26.50679 | 16.65471 | 16.067 | 2.282 | 13.651 | 0.37920 | 13.067 | 3.659 | -31.183 | 30.588 | 3.718 | 61.082 | 7 | H300X150X6.5X9 | 46.78 | 481 | 36.7 | 13.057 | 54.312 | 0.240 | 64.830 | 114.804 | 0.565 | 0.742 < 0.9 OK! | 8.683 | 52 | 1941.38 | 100.95 | 3.705 | 12.388 | |
4 | 33.74899 | 21.20511 | 20.000 | 0.000 | 18.202 | 0.50560 | 17.000 | 5.942 | -0.000 | 47.397 | 9.964 | 70.402 | 7 | H300X150X6.5X9 | 46.78 | 481 | 36.7 | 23.235 | 48.134 | 0.483 | 0.000 | 142.599 | 0.000 | 0.483 < 0.9 OK! | 5.631 | 0 | 0 | 0 | 0.000 | 5.631 | |
Max. Bending Moment(BM) and Vertical Axial Force(COM) | MaxBM = | 35.089 | kN-m | MaxCOM = | 70.402 | kN | Roof Stru Weight (Ton) = | 44.203 | |||||||||||||||||||||||
MaxBM = | 3.578 | ton-m | MaxCOM = | 7.179 | ton |
[Table 2] Beam Force[COM] and Moment[BM] Calculation (Purling Location Beam Stress) | ÃÖÀû MAIN RAFTER SIZE °è»ê(ã±â) | ||||||||||||||||||||||||||||||
F0 | F1 | F2 | F3 | F4 | F5 | F6 | F7 | F8 | F9 | F10 | F11 | F12 | F13 | F14 | F15 | F16 | F17 | F18 | F19 | F20 | F21 | F22 | F23 | F24 | F25 | F26 | F27 | F28 | F29 | F30 | F31 |
Rec. No. | From CL degree[i] | È£±æÀÌ ´©Àû(m) | »ç¿ë¾ÈÇÔ SPARE Çʵå | Radius X (m) | Height Y (m) | XN (m) | F7= XN/RR (rad) | HD (m) | F8 (m) | BM (kN-m) | F10 (kN) | SF (kN) | COM (kN) | id | RAFTER SIZE | Area (cm2) | Sx (cm3) | Unit Wt (kg/m) | fc=COM/A (MPa) | Fc (MPa) | SRc= fc/Fc (MPa) | fb=BM/Sx (MPa) | Fb (MPa) | SRb= fb/Fb (MPa) | SR=SRc+SRb SR < 1.0 OK | (1)Rafter Weight (Ton) | RING Qty (EA) | RIMG LEN/1 EA (mm) | RING LEN(m) | (2)Girder Weight (Ton) | (1)+(2) Total Weight (Ton) |
0 | 4.88909 | 3.00364 | 3.000 | 7.594 | 0.000 | 0.000 | 0.000 | 0.000 | 1.105 | -3.778 | 57.137 | 3 | H125X125X6.5X9 | 30.30 | 136 | 23.8 | 18.857 | 58.196 | 0.324 | 0.000 | 146.168 | 0.000 | 0.324 < 0.85 OK! | 5.534 | 56 | 336.6 | 18.85 | 0.449 | 5.983 | ||
1 | 11.64771 | 7.15584 | 7.107 | 6.997 | 4.152 | 0.11796 | 4.107 | 0.597 | -20.580 | 6.202 | -5.484 | 57.324 | 5 | H194X150X6X9 | 39.01 | 277 | 30.6 | 14.695 | 74.248 | 0.198 | 74.296 | 137.528 | 0.540 | 0.639 < 0.85 OK! | 7.115 | 56 | 797.36 | 44.65 | 1.366 | 8.481 | |
2 | 18.40633 | 11.30804 | 11.115 | 5.921 | 8.304 | 0.23592 | 8.115 | 1.673 | -40.667 | 15.170 | -3.683 | 59.112 | 7 | H300X150X6.5X9 | 46.78 | 481 | 36.7 | 12.636 | 64.352 | 0.196 | 84.547 | 122.168 | 0.692 | 0.790 < 0.85 OK! | 8.533 | 56 | 1247.05 | 69.83 | 2.563 | 11.096 | |
3 | 25.16495 | 15.46024 | 14.968 | 4.381 | 12.457 | 0.35388 | 11.968 | 3.213 | -47.776 | 27.513 | 0.557 | 63.516 | 8 | H346X174X6X9 | 52.68 | 642 | 41.4 | 12.057 | 81.582 | 0.148 | 74.417 | 129.139 | 0.576 | 0.650 < 0.85 OK! | 9.626 | 56 | 1679.4 | 94.05 | 3.894 | 13.520 | |
4 | 31.92357 | 19.61243 | 18.613 | 2.398 | 16.609 | 0.47184 | 15.613 | 5.196 | -34.598 | 42.546 | 5.837 | 71.090 | 8 | H346X174X6X9 | 52.68 | 642 | 41.4 | 15.197 | 64.352 | 0.236 | 71.929 | 122.168 | 0.589 | 0.760 < 0.85 OK! | 8.533 | 56 | 2088.41 | 116.95 | 4.842 | 13.375 | |
5 | 38.68219 | 23.76463 | 22.000 | 0.000 | 20.761 | 0.58980 | 19.000 | 7.594 | -0.000 | 59.436 | 10.616 | 81.840 | 8 | H346X174X6X9 | 52.68 | 642 | 41.4 | 27.010 | 58.196 | 0.464 | 0.000 | 146.168 | 0.000 | 0.464 < 0.85 OK! | 5.534 | 0 | 0 | 0 | 0.000 | 5.534 | |
Max. Bending Moment(BM) and Vertical Axial Force(COM) | MaxBM = | 47.776 | kN-m | MaxCOM = | 81.84 | kN | Roof Stru Weight (Ton) = | 57.989 | |||||||||||||||||||||||
MaxBM = | 4.872 | ton-m | MaxCOM = | 8.345 | ton |
[Table 2] Beam Force[COM] and Moment[BM] Calculation (Purling Location Beam Stress) | ÃÖÀû MAIN RAFTER SIZE °è»ê(ã±â) | ||||||||||||||||||||||||||||||
F0 | F1 | F2 | F3 | F4 | F5 | F6 | F7 | F8 | F9 | F10 | F11 | F12 | F13 | F14 | F15 | F16 | F17 | F18 | F19 | F20 | F21 | F22 | F23 | F24 | F25 | F26 | F27 | F28 | F29 | F30 | F31 |
Rec. No. | From CL degree[i] | È£±æÀÌ ´©Àû(m) | »ç¿ë¾ÈÇÔ SPARE Çʵå | Radius X (m) | Height Y (m) | XN (m) | F7= XN/RR (rad) | HD (m) | F8 (m) | BM (kN-m) | F10 (kN) | SF (kN) | COM (kN) | id | RAFTER SIZE | Area (cm2) | Sx (cm3) | Unit Wt (kg/m) | fc=COM/A (MPa) | Fc (MPa) | SRc= fc/Fc (MPa) | fb=BM/Sx (MPa) | Fb (MPa) | SRb= fb/Fb (MPa) | SR=SRc+SRb SR < 1.0 OK | (1)Rafter Weight (Ton) | RING Qty (EA) | RIMG LEN/1 EA (mm) | RING LEN(m) | (2)Girder Weight (Ton) | (1)+(2) Total Weight (Ton) |
0 | 2.97620 | 3.00135 | 3.000 | 9.659 | 0.000 | 0.000 | 0.000 | 0.000 | 0.660 | -3.684 | 83.581 | 3 | H125X125X6.5X9 | 30.30 | 136 | 23.8 | 27.584 | 50.988 | 0.541 | 0.000 | 143.648 | 0.000 | 0.541 < 0.9 OK! | 8.862 | 84 | 224.4 | 18.85 | 0.449 | 9.311 | ||
1 | 7.37231 | 7.43462 | 7.414 | 9.259 | 4.433 | 0.07673 | 4.414 | 0.400 | -24.135 | 4.032 | -6.736 | 83.485 | 5 | H194X150X6X9 | 39.01 | 277 | 30.6 | 21.401 | 67.308 | 0.318 | 87.130 | 134.012 | 0.650 | 0.896 < 0.9 OK! | 11.395 | 84 | 554.57 | 46.58 | 1.425 | 12.820 | |
2 | 11.76842 | 11.86788 | 11.785 | 8.523 | 8.867 | 0.15345 | 8.785 | 1.137 | -55.731 | 10.187 | -7.090 | 83.978 | 8 | H346X174X6X9 | 52.68 | 642 | 41.4 | 15.941 | 74.938 | 0.213 | 86.808 | 124.353 | 0.698 | 0.833 < 0.9 OK! | 15.416 | 84 | 881.49 | 74.04 | 3.065 | 18.481 | |
3 | 16.16454 | 16.30115 | 16.086 | 7.453 | 13.300 | 0.23018 | 13.086 | 2.206 | -83.470 | 18.980 | -5.061 | 85.636 | 15 | H396X199X7X11 | 72.16 | 1010 | 56.6 | 11.868 | 89.086 | 0.133 | 82.644 | 135.272 | 0.611 | 0.678 < 0.9 OK! | 21.076 | 84 | 1203.21 | 101.07 | 5.721 | 26.797 | |
4 | 20.56065 | 20.73441 | 20.292 | 6.057 | 17.733 | 0.30691 | 17.292 | 3.603 | -97.743 | 30.205 | -1.100 | 88.938 | 15 | H396X199X7X11 | 72.16 | 1010 | 56.6 | 12.325 | 89.086 | 0.138 | 96.775 | 135.272 | 0.715 | 0.785 < 0.9 OK! | 21.076 | 84 | 1517.86 | 127.5 | 7.217 | 28.293 | |
5 | 24.95676 | 25.16768 | 24.379 | 4.342 | 22.166 | 0.38363 | 21.379 | 5.317 | -91.201 | 43.597 | 4.228 | 94.243 | 15 | H396X199X7X11 | 72.16 | 1010 | 56.6 | 13.060 | 89.086 | 0.147 | 90.298 | 135.272 | 0.668 | 0.741 < 0.9 OK! | 21.076 | 84 | 1823.57 | 153.18 | 8.670 | 29.746 | |
6 | 29.35288 | 29.60094 | 28.323 | 2.319 | 26.600 | 0.46036 | 25.323 | 7.340 | -59.185 | 58.843 | 10.280 | 101.763 | 15 | H396X199X7X11 | 72.16 | 1010 | 56.6 | 16.117 | 76.782 | 0.210 | 76.171 | 128.782 | 0.591 | 0.736 < 0.9 OK! | 18.470 | 84 | 2118.56 | 177.96 | 10.072 | 28.542 | |
7 | 33.74899 | 34.03421 | 32.100 | 0.000 | 31.033 | 0.53709 | 29.100 | 9.659 | -0.000 | 75.583 | 16.368 | 111.551 | 15 | H396X199X7X11 | 72.16 | 1010 | 56.6 | 36.816 | 50.988 | 0.722 | 0.000 | 143.648 | 0.000 | 0.722 < 0.9 OK! | 8.862 | 0 | 0 | 0 | 0.000 | 8.862 | |
Max. Bending Moment(BM) and Vertical Axial Force(COM) | MaxBM = | 97.743 | kN-m | MaxCOM = | 111.551 | kN | Roof Stru Weight (Ton) = | 162.852 | |||||||||||||||||||||||
MaxBM = | 9.967 | ton-m | MaxCOM = | 11.375 | ton |
[Table 2] Beam Force[COM] and Moment[BM] Calculation (Purling Location Beam Stress) | ÃÖÀû MAIN RAFTER SIZE °è»ê(ã±â) | ||||||||||||||||||||||||||||||
F0 | F1 | F2 | F3 | F4 | F5 | F6 | F7 | F8 | F9 | F10 | F11 | F12 | F13 | F14 | F15 | F16 | F17 | F18 | F19 | F20 | F21 | F22 | F23 | F24 | F25 | F26 | F27 | F28 | F29 | F30 | F31 |
Rec. No. | From CL degree[i] | È£±æÀÌ ´©Àû(m) | »ç¿ë¾ÈÇÔ SPARE Çʵå | Radius X (m) | Height Y (m) | XN (m) | F7= XN/RR (rad) | HD (m) | F8 (m) | BM (kN-m) | F10 (kN) | SF (kN) | COM (kN) | id | RAFTER SIZE | Area (cm2) | Sx (cm3) | Unit Wt (kg/m) | fc=COM/A (MPa) | Fc (MPa) | SRc= fc/Fc (MPa) | fb=BM/Sx (MPa) | Fb (MPa) | SRb= fb/Fb (MPa) | SR=SRc+SRb SR < 1.0 OK | (1)Rafter Weight (Ton) | RING Qty (EA) | RIMG LEN/1 EA (mm) | RING LEN(m) | (2)Girder Weight (Ton) | (1)+(2) Total Weight (Ton) |
0 | 3.46759 | 3.00183 | 3.000 | 10.790 | 0.000 | 0.000 | 0.000 | 0.000 | 0.693 | -3.591 | 70.730 | 3 | H125X125X6.5X9 | 30.30 | 136 | 23.8 | 23.343 | 52.940 | 0.441 | 0.000 | 144.347 | 0.000 | 0.441 < 0.9 OK! | 8.292 | 80 | 235.62 | 18.85 | 0.449 | 8.741 | ||
1 | 8.49824 | 7.35679 | 7.330 | 10.336 | 4.355 | 0.08780 | 4.330 | 0.454 | -22.719 | 4.138 | -6.373 | 70.652 | 5 | H194X150X6X9 | 39.01 | 277 | 30.6 | 18.111 | 69.211 | 0.262 | 82.018 | 134.988 | 0.608 | 0.802 < 0.9 OK! | 10.661 | 80 | 575.68 | 46.05 | 1.409 | 12.070 | |
2 | 13.52890 | 11.71174 | 11.603 | 9.505 | 8.710 | 0.17560 | 8.603 | 1.285 | -51.622 | 10.370 | -6.485 | 71.279 | 8 | H346X174X6X9 | 52.68 | 642 | 41.4 | 13.531 | 76.769 | 0.176 | 80.408 | 125.682 | 0.640 | 0.728 < 0.9 OK! | 14.424 | 80 | 911.31 | 72.91 | 3.018 | 17.442 | |
3 | 18.55956 | 16.06670 | 15.787 | 8.301 | 13.065 | 0.26340 | 12.787 | 2.489 | -75.922 | 19.196 | -4.343 | 73.245 | 10 | H350X175X7X11 | 63.14 | 777 | 49.6 | 11.600 | 78.591 | 0.148 | 97.712 | 129.998 | 0.752 | 0.825 < 0.9 OK! | 17.281 | 80 | 1239.92 | 99.19 | 4.920 | 22.201 | |
4 | 23.59022 | 20.42166 | 19.850 | 6.736 | 17.420 | 0.35121 | 16.850 | 4.054 | -87.018 | 30.346 | -0.531 | 77.044 | 15 | H396X199X7X11 | 72.16 | 1010 | 56.6 | 10.677 | 90.713 | 0.118 | 86.156 | 136.412 | 0.632 | 0.690 < 0.9 OK! | 19.719 | 80 | 1558.98 | 124.72 | 7.059 | 26.778 | |
5 | 28.62087 | 24.77661 | 23.759 | 4.820 | 21.775 | 0.43901 | 20.759 | 5.970 | -79.146 | 43.477 | 4.242 | 82.991 | 15 | H396X199X7X11 | 72.16 | 1010 | 56.6 | 13.144 | 78.591 | 0.167 | 101.861 | 129.998 | 0.784 | 0.867 < 0.9 OK! | 17.281 | 80 | 1866.03 | 149.28 | 8.449 | 25.730 | |
6 | 33.65153 | 29.13157 | 27.485 | 2.569 | 26.130 | 0.52681 | 24.485 | 8.221 | -49.815 | 58.184 | 9.191 | 91.193 | 15 | H396X199X7X11 | 72.16 | 1010 | 56.6 | 17.311 | 76.769 | 0.225 | 77.593 | 125.682 | 0.617 | 0.774 < 0.9 OK! | 14.424 | 80 | 2158.7 | 172.7 | 9.775 | 24.199 | |
7 | 38.68219 | 33.48652 | 31.000 | 0.000 | 30.485 | 0.61461 | 28.000 | 10.790 | 0.000 | 74.016 | 13.518 | 101.543 | 15 | H396X199X7X11 | 72.16 | 1010 | 56.6 | 33.513 | 52.940 | 0.633 | 0.000 | 144.347 | 0.000 | 0.633 < 0.9 OK! | 8.292 | 0 | 0 | 0 | 0.000 | 8.292 | |
Max. Bending Moment(BM) and Vertical Axial Force(COM) | MaxBM = | 87.018 | kN-m | MaxCOM = | 101.543 | kN | Roof Stru Weight (Ton) = | 145.453 | |||||||||||||||||||||||
MaxBM = | 8.873 | ton-m | MaxCOM = | 10.355 | ton |
[Table 2] Beam Force[COM] and Moment[BM] Calculation (Purling Location Beam Stress) | ÃÖÀû MAIN RAFTER SIZE °è»ê(ã±â) | ||||||||||||||||||||||||||||||
F0 | F1 | F2 | F3 | F4 | F5 | F6 | F7 | F8 | F9 | F10 | F11 | F12 | F13 | F14 | F15 | F16 | F17 | F18 | F19 | F20 | F21 | F22 | F23 | F24 | F25 | F26 | F27 | F28 | F29 | F30 | F31 |
Rec. No. | From CL degree[i] | È£±æÀÌ ´©Àû(m) | »ç¿ë¾ÈÇÔ SPARE Çʵå | Radius X (m) | Height Y (m) | XN (m) | F7= XN/RR (rad) | HD (m) | F8 (m) | BM (kN-m) | F10 (kN) | SF (kN) | COM (kN) | id | RAFTER SIZE | Area (cm2) | Sx (cm3) | Unit Wt (kg/m) | fc=COM/A (MPa) | Fc (MPa) | SRc= fc/Fc (MPa) | fb=BM/Sx (MPa) | Fb (MPa) | SRb= fb/Fb (MPa) | SR=SRc+SRb SR < 1.0 OK | (1)Rafter Weight (Ton) | RING Qty (EA) | RIMG LEN/1 EA (mm) | RING LEN(m) | (2)Girder Weight (Ton) | (1)+(2) Total Weight (Ton) |
0 | 3.95731 | 3.00239 | 3.000 | 7.222 | 0.000 | 0.000 | 0.000 | 0.000 | 0.866 | -3.447 | 62.379 | 3 | H125X125X6.5X9 | 30.30 | 136 | 23.8 | 20.587 | 48.833 | 0.422 | 0.000 | 142.859 | 0.000 | 0.422 < 0.85 OK! | 6.886 | 64 | 294.52 | 18.85 | 0.449 | 7.335 | ||
1 | 9.91564 | 7.52294 | 7.485 | 6.676 | 4.521 | 0.10399 | 4.485 | 0.546 | -21.495 | 5.394 | -5.443 | 62.464 | 5 | H194X150X6X9 | 39.01 | 277 | 30.6 | 16.012 | 65.185 | 0.246 | 77.599 | 132.911 | 0.584 | 0.765 < 0.85 OK! | 8.854 | 64 | 734.88 | 47.03 | 1.439 | 10.293 | |
2 | 15.87398 | 12.04350 | 11.890 | 5.668 | 9.041 | 0.20799 | 8.890 | 1.554 | -44.001 | 13.611 | -3.995 | 63.808 | 8 | H346X174X6X9 | 52.68 | 642 | 41.4 | 12.112 | 72.888 | 0.166 | 68.537 | 122.854 | 0.558 | 0.641 < 0.85 OK! | 11.979 | 64 | 1167.3 | 74.71 | 3.093 | 15.072 | |
3 | 21.83232 | 16.56406 | 16.166 | 4.208 | 13.562 | 0.31198 | 13.166 | 3.014 | -53.572 | 25.161 | 0.125 | 67.345 | 8 | H346X174X6X9 | 52.68 | 642 | 41.4 | 12.784 | 72.888 | 0.175 | 83.445 | 122.854 | 0.679 | 0.767 < 0.85 OK! | 11.979 | 64 | 1587.11 | 101.57 | 4.205 | 16.184 | |
4 | 27.79065 | 21.08462 | 20.268 | 2.312 | 18.082 | 0.41597 | 17.268 | 4.910 | -40.428 | 39.547 | 5.861 | 73.701 | 8 | H346X174X6X9 | 52.68 | 642 | 41.4 | 13.990 | 72.888 | 0.192 | 62.972 | 122.854 | 0.513 | 0.609 < 0.85 OK! | 11.979 | 64 | 1989.76 | 127.34 | 5.272 | 17.251 | |
5 | 33.74899 | 25.60518 | 24.150 | 0.000 | 22.603 | 0.51996 | 21.150 | 7.222 | 0.000 | 56.150 | 11.983 | 83.135 | 8 | H346X174X6X9 | 52.68 | 642 | 41.4 | 27.437 | 48.833 | 0.562 | 0.000 | 142.859 | 0.000 | 0.562 < 0.85 OK! | 6.886 | 0 | 0 | 0 | 0.000 | 6.886 | |
Max. Bending Moment(BM) and Vertical Axial Force(COM) | MaxBM = | 53.572 | kN-m | MaxCOM = | 83.135 | kN | Roof Stru Weight (Ton) = | 73.021 | |||||||||||||||||||||||
MaxBM = | 5.463 | ton-m | MaxCOM = | 8.477 | ton |
[Table 2] Beam Force[COM] and Moment[BM] Calculation (Purling Location Beam Stress) | ÃÖÀû MAIN RAFTER SIZE °è»ê(ã±â) | ||||||||||||||||||||||||||||||
F0 | F1 | F2 | F3 | F4 | F5 | F6 | F7 | F8 | F9 | F10 | F11 | F12 | F13 | F14 | F15 | F16 | F17 | F18 | F19 | F20 | F21 | F22 | F23 | F24 | F25 | F26 | F27 | F28 | F29 | F30 | F31 |
Rec. No. | From CL degree[i] | È£±æÀÌ ´©Àû(m) | »ç¿ë¾ÈÇÔ SPARE Çʵå | Radius X (m) | Height Y (m) | XN (m) | F7= XN/RR (rad) | HD (m) | F8 (m) | BM (kN-m) | F10 (kN) | SF (kN) | COM (kN) | id | RAFTER SIZE | Area (cm2) | Sx (cm3) | Unit Wt (kg/m) | fc=COM/A (MPa) | Fc (MPa) | SRc= fc/Fc (MPa) | fb=BM/Sx (MPa) | Fb (MPa) | SRb= fb/Fb (MPa) | SR=SRc+SRb SR < 1.0 OK | (1)Rafter Weight (Ton) | RING Qty (EA) | RIMG LEN/1 EA (mm) | RING LEN(m) | (2)Girder Weight (Ton) | (1)+(2) Total Weight (Ton) |
0 | 2.65353 | 3.00107 | 3.000 | 10.851 | 0.000 | 0.000 | 0.000 | 0.000 | 0.578 | -3.679 | 91.868 | 3 | H125X125X6.5X9 | 30.30 | 136 | 23.8 | 30.319 | 51.909 | 0.584 | 0.000 | 143.980 | 0.000 | 0.584 < 0.9 OK! | 10.044 | 96 | 196.35 | 18.85 | 0.449 | 10.493 | ||
1 | 6.54046 | 7.39709 | 7.381 | 10.498 | 4.396 | 0.06784 | 4.381 | 0.352 | -24.361 | 3.497 | -6.998 | 91.739 | 7 | H300X150X6.5X9 | 46.78 | 481 | 36.7 | 19.611 | 58.103 | 0.338 | 50.647 | 117.654 | 0.430 | 0.720 < 0.9 OK! | 15.488 | 96 | 483.09 | 46.38 | 1.702 | 17.190 | |
2 | 10.42740 | 11.79311 | 11.728 | 9.850 | 8.792 | 0.13568 | 8.728 | 1.001 | -58.067 | 8.828 | -7.958 | 92.019 | 8 | H346X174X6X9 | 52.68 | 642 | 41.4 | 17.468 | 75.805 | 0.230 | 90.447 | 124.983 | 0.724 | 0.874 < 0.9 OK! | 17.471 | 96 | 767.6 | 73.69 | 3.051 | 20.522 | |
3 | 14.31433 | 16.18912 | 16.021 | 8.908 | 13.188 | 0.20352 | 13.021 | 1.942 | -91.171 | 16.475 | -6.768 | 93.158 | 15 | H396X199X7X11 | 72.16 | 1010 | 56.6 | 12.910 | 89.858 | 0.144 | 90.268 | 135.813 | 0.665 | 0.736 < 0.9 OK! | 23.886 | 96 | 1048.59 | 100.66 | 5.698 | 29.584 | |
4 | 18.20126 | 20.58514 | 20.241 | 7.678 | 17.584 | 0.27136 | 17.241 | 3.173 | -114.872 | 26.295 | -3.739 | 95.553 | 16 | H400X200X8X13 | 84.12 | 1190 | 66.0 | 11.359 | 91.070 | 0.125 | 96.531 | 138.613 | 0.696 | 0.759 < 0.9 OK! | 27.853 | 96 | 1324.75 | 127.18 | 8.394 | 36.247 | |
5 | 22.08819 | 24.98116 | 24.367 | 6.164 | 21.980 | 0.33920 | 21.367 | 4.686 | -121.914 | 38.109 | 0.740 | 99.522 | 16 | H400X200X8X13 | 84.12 | 1190 | 66.0 | 11.831 | 91.070 | 0.130 | 102.449 | 138.613 | 0.739 | 0.804 < 0.9 OK! | 27.853 | 96 | 1594.81 | 153.1 | 10.105 | 37.958 | |
6 | 25.97512 | 29.37717 | 28.381 | 4.374 | 26.376 | 0.40704 | 25.381 | 6.476 | -106.915 | 51.699 | 6.209 | 105.295 | 16 | H400X200X8X13 | 84.12 | 1190 | 66.0 | 14.592 | 89.858 | 0.162 | 105.856 | 135.813 | 0.779 | 0.861 < 0.9 OK! | 23.886 | 96 | 1857.54 | 178.32 | 11.769 | 35.655 | |
7 | 29.86206 | 33.77319 | 32.265 | 2.316 | 30.772 | 0.47488 | 29.265 | 8.534 | -66.608 | 66.816 | 12.167 | 113.001 | 16 | H400X200X8X13 | 84.12 | 1190 | 66.0 | 17.897 | 77.639 | 0.231 | 85.725 | 129.359 | 0.663 | 0.820 < 0.9 OK! | 20.932 | 96 | 2111.73 | 202.73 | 13.380 | 34.312 | |
8 | 33.74899 | 38.16921 | 36.000 | 0.000 | 35.168 | 0.54272 | 33.000 | 10.851 | -0.000 | 83.182 | 18.086 | 122.658 | 16 | H400X200X8X13 | 84.12 | 1190 | 66.0 | 40.481 | 51.909 | 0.780 | 0.000 | 143.980 | 0.000 | 0.780 < 0.9 OK! | 10.044 | 0 | 0 | 0 | 0.000 | 10.044 | |
Max. Bending Moment(BM) and Vertical Axial Force(COM) | MaxBM = | 121.914 | kN-m | MaxCOM = | 122.658 | kN | Roof Stru Weight (Ton) = | 232.005 | |||||||||||||||||||||||
MaxBM = | 12.432 | ton-m | MaxCOM = | 12.508 | ton |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
A. TK-001 (VPDM) TANK Net Weight (¼³°èÁß·®) ¡¡¡¡D= 60 (m), H= 23 (m) | Horizontal Weld (¼öÆò¿ëÁ¢ : 2G) [ÀÚµ¿:SAW or ¼öµ¿:SMAW] [¿ëÂøÈ¿À²:SAW (95%) / ¼öµ¿:SMAW (60%)] | Vertical Weld (¼öÁ÷¿ëÁ¢) [ FCAW ¿ëÂøÈ¿À²: (90%) ] | ÇÕ°èÁß·® | REMARK | ![]() [»õâ¿¡¼] A. TK-001 (VPDM) TANK Å« À̹ÌÁö ·Î º¸±â [»õâ¿¡¼] PDF µµ¸é º¸±â [»õâ¿¡¼] SHOP_WPS_PQR_SUMBAWA_50K PDF º¸±â |
||||||||||||||||
No. | Material | Thickness (mm) | Width (mm) | Length (mm) | Qty (SHT) | Weight (Ton) | Joint No. | ¼öÆò¿ëÁ¢ ÃѱæÀÌ (m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | Joint No. | shCirQty=[16] ¼öÁ÷¿ëÁ¢ ÃѱæÀÌ VL = 16 PCS * Each S.W(m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ¼öÆò+¼öÁ÷ ¿ëÁ¢ºÀÁß·® (kg) | REMARK | |
12 | A516-70 (Comp. Ring+Top Shell) | 8.0 | 1000 | 11782 | 16 | 11.840 | 2G-H12 | 188 | 37.63 | 55.53 | 95 | 58.45 | 3G-V12 | 1m *16= 16 m | -1.00 | -0.13 | 90 | -0.14 | 58.31 | ||
11 | A516-70 | 9.5 | 2000 | 11782 | 16 | 28.112 | 2G-H11 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V11 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
10 | A516-70 | 13.5 | 2000 | 11783 | 16 | 39.952 | 2G-H10 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V10 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
9 | A516-70 | 17.5 | 2000 | 11784 | 16 | 51.808 | 2G-H9 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V9 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
8 | A516-70 | 21.5 | 2000 | 11785 | 16 | 63.648 | 2G-H8 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V8 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
7 | A516-70 | 25.5 | 2000 | 11785 | 16 | 75.488 | 2G-H7 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V7 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
6 | A516-70 | 29.5 | 2000 | 11786 | 16 | 87.344 | 2G-H6 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V6 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
5 | A516-70 | 33.5 | 2000 | 11787 | 16 | 99.184 | 2G-H5 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V5 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
4 | A516-70 | 37.5 | 2000 | 11788 | 16 | 111.040 | 2G-H4 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V4 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
3 | A516-70 | 47.5 | 2000 | 11790 | 16 | 140.672 | 2G-H3 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V3 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
2 | A537-CL2 | 36.5 | 2000 | 11788 | 16 | 108.080 | 2G-H2 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V2 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
1 | A537-CL2 | 39.5 | 2000 | 11788 | 16 | 116.960 | 2G-H1 | 188 | -1.00 | -1.48 | 98 | -1.56 | 3G-V1 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
A) | 1st Shell + Annular Plate | t1st= 39.5 tAnn= 26 | 2000 | 11788 | N/A | N/A | 1F-An | 188.0 | 382.26 | 564.14 | 60 | 940.23 | - | - | - | - | - | - | -1.56 | ||
A. TK-001 (VPDM) TANK Total = | 192 | 934.1 | HLEN = | 2444.0 | 408.89 | 603.39 | 98 | 981.52 | VLEN = | 368.000 | -12.00 | -2.88 | 90 | -3.22 | 978.30 |
A. TK-001 (VPDM) TANK, D= 60 (m), H= 23 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 12th) | A537-CL2 | t 39.5 ~ 8 | 23000 | 11788 | 16 | 192 | 934.1 | SAW-2G (¼öÆò¿ëÁ¢) | 2444.0 | 408.89 | 98.0 | 981.52 | 6600 | 1.00 | 5,987 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 1177.82 | 3500 | 1.00 | 4,122 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 368.0 | -12.00 | 90.0 | -3.22 | 6100 | 1.00 | -20 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A283-C | t 9.5¡¿©ª57622 | 2438 | 6096 | N/A | N/A | 194.47 | FCAW FILLET (2F) | 935.2 | 54.15 | 90.0 | 442.00 | 6100 | 1.00 | 2,696 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A537-CL2 | t 26¡¿(©ª60262 - ©ª57522) | 1370 | N/A | 32 | 51.73 | SMAW V-GROOVE (1G+4G) | 43.8 | 418.60 | 60.0 | 240.1 | 59000 | 1.00 | 14,166 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
4. WIND STIFFENER | A537-CL2 | L150x15 | 11788 | 16 | 2 °³¼Ò (¾çÂÊÇÊ·¿¿¬¼Ó) | 6.68 | FCAW FILLET (2F+4F) ¾ç¸éÇÊ·¿¿¬¼Ó¿ëÁ¢ | 377.0 | 270.00 | 90.0 | 887.83 | 3200 | 1.00 | 2,841 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |
5.1 ROOF PLATE | A516-60 | t 5, RR=54000 | 2356 | 4115 | N/A | N/A | 124.89 | FCAW(1G) BUTT OR SINGLE LAP | 3130.8 | 14.58 | 70.0 | 511.90 | 3200 | 1.00 | 1,638 | FCAW ROOF (OD 1.4 DS 7100), About Unit Price = 3200 (¿ø/kg) |
5.2 ROOF PLATE to Rafter/Girder | A36 | H396X199X7X11 | 28806(L) | 80 Rafters + 7 Rings(L:826.3m) | 177.2 | FCAW (4F) ©ª1.2 DS7100 E71T-1C | 3130.8 | 29.16 | 70.0 | 1023.80 | 3200 | 1.00 | 3,276 | FCAW(DS7100), About Unit Price = 3200 (¿ø/kg) | ||
A. TK-001 (VPDM) TANK Weld Metal Total = | 5081.65 | kg | 34,706 | (õ¿ø) |
A) ¸µÄÁ X-Groove ¿ëÁ¢ºÎ ´Ü¸éÀû °è»ê![]() | B) ¶Ç ´Ù¸¥ ¿ëÁ¢ºÎ ´Ü¸éÀû °è»ê![]() |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
A. TK-001 (VPDM) TANK Net Weight (¼³°èÁß·®) ¡¡¡¡D= 60 (m), H= 23 (m) | Horizontal Weld (¼öÆò¿ëÁ¢ : 2G) [ÀÚµ¿:SAW or ¼öµ¿:SMAW] [¿ëÂøÈ¿À²:SAW (95%) / ¼öµ¿:SMAW (60%)] | Vertical Weld (¼öÁ÷¿ëÁ¢) [ FCAW ¿ëÂøÈ¿À²: (90%) ] | ÇÕ°èÁß·® | REMARK | ![]() [»õâ¿¡¼] A. TK-001 (VPDM) TANK Å« À̹ÌÁö ·Î º¸±â [»õâ¿¡¼] PDF µµ¸é º¸±â [»õâ¿¡¼] SHOP_WPS_PQR_SUMBAWA_50K PDF º¸±â |
||||||||||||||||
No. | Material | Thickness (mm) | Width (mm) | Length (mm) | Qty (SHT) | Weight (Ton) | Joint No. | ¼öÆò¿ëÁ¢ ÃѱæÀÌ (m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | Joint No. | shCirQty=[16] ¼öÁ÷¿ëÁ¢ ÃѱæÀÌ VL = 16 PCS * Each S.W(m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ¼öÆò+¼öÁ÷ ¿ëÁ¢ºÀÁß·® (kg) | REMARK | |
12 | A516-70 (Comp. Ring+Top Shell) | 8.0 | 1000 | 11782 | 16 | 11.840 | 2G-H12 | 188 | 37.63 | 55.53 | 95 | 58.45 | 3G-V12 | 1m *16= 16 m | -1.00 | -0.13 | 90 | -0.14 | 58.31 | ||
11 | A516-70 | 9.5 | 2000 | 11782 | 16 | 28.112 | 2G-H11 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V11 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
10 | A516-70 | 13.5 | 2000 | 11783 | 16 | 39.952 | 2G-H10 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V10 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
9 | A516-70 | 17.5 | 2000 | 11784 | 16 | 51.808 | 2G-H9 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V9 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
8 | A516-70 | 21.5 | 2000 | 11785 | 16 | 63.648 | 2G-H8 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V8 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
7 | A516-70 | 25.5 | 2000 | 11785 | 16 | 75.488 | 2G-H7 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V7 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
6 | A516-70 | 29.5 | 2000 | 11786 | 16 | 87.344 | 2G-H6 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V6 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
5 | A516-70 | 33.5 | 2000 | 11787 | 16 | 99.184 | 2G-H5 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V5 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
4 | A516-70 | 37.5 | 2000 | 11788 | 16 | 111.040 | 2G-H4 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V4 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
3 | A516-70 | 47.5 | 2000 | 11790 | 16 | 140.672 | 2G-H3 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V3 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
2 | A537-CL2 | 36.5 | 2000 | 11788 | 16 | 108.080 | 2G-H2 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V2 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
1 | A537-CL2 | 39.5 | 2000 | 11788 | 16 | 116.960 | 2G-H1 | 188 | -1.00 | -1.48 | 98 | -1.56 | 3G-V1 | 2m *16= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.84 | ||
A) | 1st Shell + Annular Plate | t1st= 39.5 tAnn= 26 | 2000 | 11788 | N/A | N/A | 1F-An | 188.0 | 382.26 | 564.14 | 60 | 940.23 | - | - | - | - | - | - | -1.56 | ||
A. TK-001 (VPDM) TANK Total = | 192 | 934.1 | HLEN = | 2444.0 | 408.89 | 603.39 | 98 | 981.52 | VLEN = | 368.000 | -12.00 | -2.88 | 90 | -3.22 | 978.30 | ||||||
B. Turkey SECL (1 ONE-FOOT) TANK Net Weight (¼³°èÁß·®) ¡¡¡¡D= 31.6 (m), H= 15.2 (m) | Horizontal Weld (¼öÆò¿ëÁ¢ : 2G) [ÀÚµ¿:SAW or ¼öµ¿:SMAW] [¿ëÂøÈ¿À²:SAW (95%) / ¼öµ¿:SMAW (60%)] | Vertical Weld (¼öÁ÷¿ëÁ¢) [ FCAW ¿ëÂøÈ¿À²: (90%) ] | ÇÕ°èÁß·® | REMARK | ![]() [»õâ¿¡¼] B. Turkey SECL (1 ONE-FOOT) TANK Å« À̹ÌÁö ·Î º¸±â [»õâ¿¡¼] PDF µµ¸é º¸±â [»õâ¿¡¼] SHOP_WPS_PQR_SUMBAWA_50K PDF º¸±â |
||||||||||||||||
No. | Material | Thickness (mm) | Width (mm) | Length (mm) | Qty (SHT) | Weight (Ton) | Joint No. | ¼öÆò¿ëÁ¢ ÃѱæÀÌ (m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | Joint No. | shCirQty=[6] ¼öÁ÷¿ëÁ¢ ÃѱæÀÌ VL = 6 PCS * Each S.W(m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ¼öÆò+¼öÁ÷ ¿ëÁ¢ºÀÁß·® (kg) | REMARK | |
7 | A516-70 (Comp. Ring+Top Shell) | 8.5 | 800 | 16550 | 6 | 5.298 | 2G-H7 | 99 | 42.48 | 33.01 | 95 | 34.75 | 3G-V7 | 0.8m *6= 4.8 m | -1.00 | -0.04 | 90 | -0.04 | 34.71 | ||
6 | A516-70 | 6.0 | 2400 | 16548 | 6 | 11.226 | 2G-H6 | 99 | -1.00 | -0.78 | 95 | -0.82 | 3G-V6 | 2.4m *6= 14.4 m | -1.00 | -0.11 | 90 | -0.12 | -0.94 | ||
5 | A516-70 | 7.0 | 2400 | 16549 | 6 | 13.092 | 2G-H5 | 99 | -1.00 | -0.78 | 95 | -0.82 | 3G-V5 | 2.4m *6= 14.4 m | -1.00 | -0.11 | 90 | -0.12 | -0.94 | ||
4 | A516-70 | 9.0 | 2400 | 16550 | 6 | 16.836 | 2G-H4 | 99 | -1.00 | -0.78 | 95 | -0.82 | 3G-V4 | 2.4m *6= 14.4 m | -1.00 | -0.11 | 90 | -0.12 | -0.94 | ||
3 | A516-70 | 11.5 | 2400 | 16551 | 6 | 21.516 | 2G-H3 | 99 | -1.00 | -0.78 | 95 | -0.82 | 3G-V3 | 2.4m *6= 14.4 m | -1.00 | -0.11 | 90 | -0.12 | -0.94 | ||
2 | A516-70 | 13.5 | 2400 | 16552 | 6 | 25.260 | 2G-H2 | 99 | -1.00 | -0.78 | 95 | -0.82 | 3G-V2 | 2.4m *6= 14.4 m | -1.00 | -0.11 | 90 | -0.12 | -0.94 | ||
1 | A516-70 | 15.5 | 2400 | 16553 | 6 | 29.004 | 2G-H1 | 99 | -1.00 | -0.78 | 98 | -0.82 | 3G-V1 | 2.4m *6= 14.4 m | -1.00 | -0.11 | 90 | -0.12 | -0.94 | ||
A) | 1st Shell + Annular Plate | t1st= 15.5 tAnn= 10.5 | 2400 | 16553 | N/A | N/A | 1F-An | 99.0 | 58.86 | 45.74 | 60 | 76.23 | - | - | - | - | - | - | -0.82 | ||
B. Turkey SECL (1 ONE-FOOT) TANK Total = | 42 | 122.2 | HLEN = | 792.0 | 95.34 | 74.07 | 98 | 106.06 | VLEN = | 91.200 | -7.00 | -0.70 | 90 | -0.76 | 105.30 |
A. TK-001 (VPDM) TANK, D= 60 (m), H= 23 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 12th) | A537-CL2 | t 39.5 ~ 8 | 23000 | 11788 | 16 | 192 | 934.1 | SAW-2G (¼öÆò¿ëÁ¢) | 2444.0 | 408.89 | 98.0 | 981.52 | 6600 | 1.00 | 5,987 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 1177.82 | 3500 | 1.00 | 4,122 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 368.0 | -12.00 | 90.0 | -3.22 | 6100 | 1.00 | -20 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A283-C | t 9.5¡¿©ª57622 | 2438 | 6096 | N/A | N/A | 194.47 | FCAW FILLET (2F) | 935.2 | 54.15 | 90.0 | 442.00 | 6100 | 1.00 | 2,696 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A537-CL2 | t 26¡¿(©ª60262 - ©ª57522) | 1370 | N/A | 32 | 51.73 | SMAW V-GROOVE (1G+4G) | 43.8 | 418.60 | 60.0 | 240.1 | 59000 | 1.00 | 14,166 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
4. WIND STIFFENER | A537-CL2 | L150x15 | 11788 | 16 | 2 °³¼Ò (¾çÂÊÇÊ·¿¿¬¼Ó) | 6.68 | FCAW FILLET (2F+4F) ¾ç¸éÇÊ·¿¿¬¼Ó¿ëÁ¢ | 377.0 | 270.00 | 90.0 | 887.83 | 3200 | 1.00 | 2,841 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |
5.1 ROOF PLATE | A516-60 | t 5, RR=54000 | 2356 | 4115 | N/A | N/A | 124.89 | FCAW(1G) BUTT OR SINGLE LAP | 3130.8 | 14.58 | 70.0 | 511.90 | 3200 | 1.00 | 1,638 | FCAW ROOF (OD 1.4 DS 7100), About Unit Price = 3200 (¿ø/kg) |
5.2 ROOF PLATE to Rafter/Girder | A36 | H396X199X7X11 | 28806(L) | 80 Rafters + 7 Rings(L:826.3m) | 177.2 | FCAW (4F) ©ª1.2 DS7100 E71T-1C | 3130.8 | 29.16 | 70.0 | 1023.80 | 3200 | 1.00 | 3,276 | FCAW(DS7100), About Unit Price = 3200 (¿ø/kg) | ||
A. TK-001 (VPDM) TANK Weld Metal Total = | 5081.65 | kg | 34,706 | (õ¿ø) | ||||||||||||
B. Turkey SECL (1 ONE-FOOT) TANK, D= 31.6 (m), H= 15.2 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 7th) | A516-70 | t 15.5 ~ 8.5 | 15200 | 16553 | 6 | 42 | 122.2 | SAW-2G (¼öÆò¿ëÁ¢) | 792.0 | 95.34 | 98.0 | 106.06 | 3900 | 1.00 | 403 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 127.27 | 3300 | 1.00 | 419 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 91.2 | -7.00 | 90.0 | -0.76 | 3800 | 1.00 | -3 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A283-C | t 8¡¿©ª30380 | 2438 | 6096 | N/A | N/A | 45.52 | FCAW FILLET (2F) | 297.5 | 38.40 | 90.0 | 100.00 | 3800 | 1.00 | 380 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A516-70 | t 11¡¿(©ª31766 - ©ª30280) | 743 | N/A | 12 | 5.97 | SMAW V-GROOVE (1G+4G) | 8.9 | 68.30 | 60.0 | 7.97 | 59000 | 1.00 | 470 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
4. WIND STIFFENER | A516-70 | L150x15 | 16553 | 6 | 2 °³¼Ò (¾çÂÊÇÊ·¿¿¬¼Ó) | 3.53 | FCAW FILLET (2F+4F) ¾ç¸éÇÊ·¿¿¬¼Ó¿ëÁ¢ | 198.0 | 270.00 | 90.0 | 466.29 | 2850 | 1.00 | 1,329 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |
5.1 ROOF PLATE | A516-60 | t 5, RR=25280 | 2482 | 4687 | N/A | N/A | 38.09 | FCAW(1G) BUTT OR SINGLE LAP | 739.5 | 14.58 | 70.0 | 120.91 | 3200 | 1.00 | 387 | FCAW ROOF (OD 1.4 DS 7100), About Unit Price = 3200 (¿ø/kg) |
5.2 ROOF PLATE to Rafter/Girder | A36 | H194X150X6X9 | 14060(L) | 40 Rafters + 3 Rings(L:177.1m) | 22.63 | FCAW (4F) ©ª1.2 DS7100 E71T-1C | 739.5 | 29.16 | 70.0 | 241.83 | 3200 | 1.00 | 774 | FCAW(DS7100), About Unit Price = 3200 (¿ø/kg) | ||
B. Turkey SECL (1 ONE-FOOT) TANK Weld Metal Total = | 1221.60 | kg | 4,159 | (õ¿ø) | ||||||||||||
INNER/OUTER TANK TOTAL = | 1221.60 | kg | 4,159 | (õ¿ø) |
A) ¸µÄÁ X-Groove ¿ëÁ¢ºÎ ´Ü¸éÀû °è»ê![]() | B) ¶Ç ´Ù¸¥ ¿ëÁ¢ºÎ ´Ü¸éÀû °è»ê![]() |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
B. Turkey SECL (1 ONE-FOOT) TANK Net Weight (¼³°èÁß·®) ¡¡¡¡D= 31.6 (m), H= 15.2 (m) | Horizontal Weld (¼öÆò¿ëÁ¢ : 2G) [ÀÚµ¿:SAW or ¼öµ¿:SMAW] [¿ëÂøÈ¿À²:SAW (95%) / ¼öµ¿:SMAW (60%)] | Vertical Weld (¼öÁ÷¿ëÁ¢) [ FCAW ¿ëÂøÈ¿À²: (90%) ] | ÇÕ°èÁß·® | REMARK | ![]() [»õâ¿¡¼] B. Turkey SECL (1 ONE-FOOT) TANK Å« À̹ÌÁö ·Î º¸±â [»õâ¿¡¼] PDF µµ¸é º¸±â [»õâ¿¡¼] SHOP_WPS_PQR_SUMBAWA_50K PDF º¸±â |
||||||||||||||||
No. | Material | Thickness (mm) | Width (mm) | Length (mm) | Qty (SHT) | Weight (Ton) | Joint No. | ¼öÆò¿ëÁ¢ ÃѱæÀÌ (m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | Joint No. | shCirQty=[6] ¼öÁ÷¿ëÁ¢ ÃѱæÀÌ VL = 6 PCS * Each S.W(m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ¼öÆò+¼öÁ÷ ¿ëÁ¢ºÀÁß·® (kg) | REMARK | |
7 | A516-70 (Comp. Ring+Top Shell) | 8.5 | 800 | 16550 | 6 | 5.298 | 2G-H7 | 99 | 42.48 | 33.01 | 95 | 34.75 | 3G-V7 | 0.8m *6= 4.8 m | -1.00 | -0.04 | 90 | -0.04 | 34.71 | ||
6 | A516-70 | 6.0 | 2400 | 16548 | 6 | 11.226 | 2G-H6 | 99 | -1.00 | -0.78 | 95 | -0.82 | 3G-V6 | 2.4m *6= 14.4 m | -1.00 | -0.11 | 90 | -0.12 | -0.94 | ||
5 | A516-70 | 7.0 | 2400 | 16549 | 6 | 13.092 | 2G-H5 | 99 | -1.00 | -0.78 | 95 | -0.82 | 3G-V5 | 2.4m *6= 14.4 m | -1.00 | -0.11 | 90 | -0.12 | -0.94 | ||
4 | A516-70 | 9.0 | 2400 | 16550 | 6 | 16.836 | 2G-H4 | 99 | -1.00 | -0.78 | 95 | -0.82 | 3G-V4 | 2.4m *6= 14.4 m | -1.00 | -0.11 | 90 | -0.12 | -0.94 | ||
3 | A516-70 | 11.5 | 2400 | 16551 | 6 | 21.516 | 2G-H3 | 99 | -1.00 | -0.78 | 95 | -0.82 | 3G-V3 | 2.4m *6= 14.4 m | -1.00 | -0.11 | 90 | -0.12 | -0.94 | ||
2 | A516-70 | 13.5 | 2400 | 16552 | 6 | 25.260 | 2G-H2 | 99 | -1.00 | -0.78 | 95 | -0.82 | 3G-V2 | 2.4m *6= 14.4 m | -1.00 | -0.11 | 90 | -0.12 | -0.94 | ||
1 | A516-70 | 15.5 | 2400 | 16553 | 6 | 29.004 | 2G-H1 | 99 | -1.00 | -0.78 | 98 | -0.82 | 3G-V1 | 2.4m *6= 14.4 m | -1.00 | -0.11 | 90 | -0.12 | -0.94 | ||
A) | 1st Shell + Annular Plate | t1st= 15.5 tAnn= 10.5 | 2400 | 16553 | N/A | N/A | 1F-An | 99.0 | 58.86 | 45.74 | 60 | 76.23 | - | - | - | - | - | - | -0.82 | ||
B. Turkey SECL (1 ONE-FOOT) TANK Total = | 42 | 122.2 | HLEN = | 792.0 | 95.34 | 74.07 | 98 | 106.06 | VLEN = | 91.200 | -7.00 | -0.70 | 90 | -0.76 | 105.30 | ||||||
A. Turkey SECL (2 ONE-FOOT) TANK Net Weight (¼³°èÁß·®) ¡¡¡¡D= 41.6 (m), H= 15.2 (m) | Horizontal Weld (¼öÆò¿ëÁ¢ : 2G) [ÀÚµ¿:SAW or ¼öµ¿:SMAW] [¿ëÂøÈ¿À²:SAW (95%) / ¼öµ¿:SMAW (60%)] | Vertical Weld (¼öÁ÷¿ëÁ¢) [ FCAW ¿ëÂøÈ¿À²: (90%) ] | ÇÕ°èÁß·® | REMARK | ![]() [»õâ¿¡¼] A. Turkey SECL (2 ONE-FOOT) TANK Å« À̹ÌÁö ·Î º¸±â [»õâ¿¡¼] PDF µµ¸é º¸±â [»õâ¿¡¼] SHOP_WPS_PQR_SUMBAWA_50K PDF º¸±â |
||||||||||||||||
No. | Material | Thickness (mm) | Width (mm) | Length (mm) | Qty (SHT) | Weight (Ton) | Joint No. | ¼öÆò¿ëÁ¢ ÃѱæÀÌ (m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | Joint No. | shCirQty=[10] ¼öÁ÷¿ëÁ¢ ÃѱæÀÌ VL = 10 PCS * Each S.W(m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ¼öÆò+¼öÁ÷ ¿ëÁ¢ºÀÁß·® (kg) | REMARK | |
7 | A516-70 (Comp. Ring+Top Shell) | 11.5 | 800 | 13072 | 10 | 9.440 | 2G-H7 | 130 | 77.76 | 79.35 | 95 | 83.53 | 3G-V7 | 0.8m *10= 8 m | -1.00 | -0.06 | 90 | -0.07 | 83.46 | ||
6 | A516-70 | 8.0 | 2400 | 13071 | 10 | 19.700 | 2G-H6 | 130 | -1.00 | -1.02 | 95 | -1.07 | 3G-V6 | 2.4m *10= 24 m | -1.00 | -0.19 | 90 | -0.21 | -1.28 | ||
5 | A516-70 | 8.5 | 2400 | 13071 | 10 | 20.930 | 2G-H5 | 130 | -1.00 | -1.02 | 95 | -1.07 | 3G-V5 | 2.4m *10= 24 m | -1.00 | -0.19 | 90 | -0.21 | -1.28 | ||
4 | A516-70 | 11.5 | 2400 | 13072 | 10 | 28.320 | 2G-H4 | 130 | -1.00 | -1.02 | 95 | -1.07 | 3G-V4 | 2.4m *10= 24 m | -1.00 | -0.19 | 90 | -0.21 | -1.28 | ||
3 | A516-70 | 14.0 | 2400 | 13073 | 10 | 34.480 | 2G-H3 | 130 | -1.00 | -1.02 | 95 | -1.07 | 3G-V3 | 2.4m *10= 24 m | -1.00 | -0.19 | 90 | -0.21 | -1.28 | ||
2 | A516-70 | 17.0 | 2400 | 13074 | 10 | 41.870 | 2G-H2 | 130 | -1.00 | -1.02 | 95 | -1.07 | 3G-V2 | 2.4m *10= 24 m | -1.00 | -0.19 | 90 | -0.21 | -1.28 | ||
1 | A516-70 | 20.0 | 2400 | 13075 | 10 | 49.270 | 2G-H1 | 130 | -1.00 | -1.02 | 98 | -1.07 | 3G-V1 | 2.4m *10= 24 m | -1.00 | -0.19 | 90 | -0.21 | -1.28 | ||
A) | 1st Shell + Annular Plate | t1st= 20 tAnn= 13 | 2400 | 13075 | N/A | N/A | 1F-An | 130.0 | 98.00 | 100.01 | 60 | 166.68 | - | - | - | - | - | - | -1.07 | ||
A. Turkey SECL (2 ONE-FOOT) TANK Total = | 70 | 204.0 | HLEN = | 1040.0 | 169.76 | 173.24 | 98 | 243.79 | VLEN = | 152.000 | -7.00 | -1.20 | 90 | -1.33 | 242.46 |
A. TK-001 (VPDM) TANK, D= 60 (m), H= 23 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 12th) | A537-CL2 | t 39.5 ~ 8 | 23000 | 11788 | 16 | 192 | 934.1 | SAW-2G (¼öÆò¿ëÁ¢) | 2444.0 | 408.89 | 98.0 | 981.52 | 6600 | 1.00 | 5,987 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 1177.82 | 3500 | 1.00 | 4,122 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 368.0 | -12.00 | 90.0 | -3.22 | 6100 | 1.00 | -20 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A283-C | t 9.5¡¿©ª57622 | 2438 | 6096 | N/A | N/A | 194.47 | FCAW FILLET (2F) | 935.2 | 54.15 | 90.0 | 442.00 | 6100 | 1.00 | 2,696 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A537-CL2 | t 26¡¿(©ª60262 - ©ª57522) | 1370 | N/A | 32 | 51.73 | SMAW V-GROOVE (1G+4G) | 43.8 | 418.60 | 60.0 | 240.1 | 59000 | 1.00 | 14,166 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
4. WIND STIFFENER | A537-CL2 | L150x15 | 11788 | 16 | 2 °³¼Ò (¾çÂÊÇÊ·¿¿¬¼Ó) | 6.68 | FCAW FILLET (2F+4F) ¾ç¸éÇÊ·¿¿¬¼Ó¿ëÁ¢ | 377.0 | 270.00 | 90.0 | 887.83 | 3200 | 1.00 | 2,841 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |
5.1 ROOF PLATE | A516-60 | t 5, RR=54000 | 2356 | 4115 | N/A | N/A | 124.89 | FCAW(1G) BUTT OR SINGLE LAP | 3130.8 | 14.58 | 70.0 | 511.90 | 3200 | 1.00 | 1,638 | FCAW ROOF (OD 1.4 DS 7100), About Unit Price = 3200 (¿ø/kg) |
5.2 ROOF PLATE to Rafter/Girder | A36 | H396X199X7X11 | 28806(L) | 80 Rafters + 7 Rings(L:826.3m) | 177.2 | FCAW (4F) ©ª1.2 DS7100 E71T-1C | 3130.8 | 29.16 | 70.0 | 1023.80 | 3200 | 1.00 | 3,276 | FCAW(DS7100), About Unit Price = 3200 (¿ø/kg) | ||
A. TK-001 (VPDM) TANK Weld Metal Total = | 5081.65 | kg | 34,706 | (õ¿ø) | ||||||||||||
B. Turkey SECL (1 ONE-FOOT) TANK, D= 31.6 (m), H= 15.2 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 7th) | A516-70 | t 15.5 ~ 8.5 | 15200 | 16553 | 6 | 42 | 122.2 | SAW-2G (¼öÆò¿ëÁ¢) | 792.0 | 95.34 | 98.0 | 106.06 | 3900 | 1.00 | 403 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 127.27 | 3300 | 1.00 | 419 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 91.2 | -7.00 | 90.0 | -0.76 | 3800 | 1.00 | -3 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A283-C | t 8¡¿©ª30380 | 2438 | 6096 | N/A | N/A | 45.52 | FCAW FILLET (2F) | 297.5 | 38.40 | 90.0 | 100.00 | 3800 | 1.00 | 380 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A516-70 | t 11¡¿(©ª31766 - ©ª30280) | 743 | N/A | 12 | 5.97 | SMAW V-GROOVE (1G+4G) | 8.9 | 68.30 | 60.0 | 7.97 | 59000 | 1.00 | 470 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
4. WIND STIFFENER | A516-70 | L150x15 | 16553 | 6 | 2 °³¼Ò (¾çÂÊÇÊ·¿¿¬¼Ó) | 3.53 | FCAW FILLET (2F+4F) ¾ç¸éÇÊ·¿¿¬¼Ó¿ëÁ¢ | 198.0 | 270.00 | 90.0 | 466.29 | 2850 | 1.00 | 1,329 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |
5.1 ROOF PLATE | A516-60 | t 5, RR=25280 | 2482 | 4687 | N/A | N/A | 38.09 | FCAW(1G) BUTT OR SINGLE LAP | 739.5 | 14.58 | 70.0 | 120.91 | 3200 | 1.00 | 387 | FCAW ROOF (OD 1.4 DS 7100), About Unit Price = 3200 (¿ø/kg) |
5.2 ROOF PLATE to Rafter/Girder | A36 | H194X150X6X9 | 14060(L) | 40 Rafters + 3 Rings(L:177.1m) | 22.63 | FCAW (4F) ©ª1.2 DS7100 E71T-1C | 739.5 | 29.16 | 70.0 | 241.83 | 3200 | 1.00 | 774 | FCAW(DS7100), About Unit Price = 3200 (¿ø/kg) | ||
B. Turkey SECL (1 ONE-FOOT) TANK Weld Metal Total = | 1221.60 | kg | 4,159 | (õ¿ø) | ||||||||||||
INNER/OUTER TANK TOTAL = | 1221.60 | kg | 4,159 | (õ¿ø) | ||||||||||||
A. Turkey SECL (2 ONE-FOOT) TANK, D= 41.6 (m), H= 15.2 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 7th) | A516-70 | t 20 ~ 11.5 | 15200 | 13075 | 10 | 70 | 204.0 | SAW-2G (¼öÆò¿ëÁ¢) | 1040.0 | 169.76 | 98.0 | 243.79 | 3900 | 1.00 | 926 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 292.55 | 3300 | 1.00 | 965 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 152.0 | -7.00 | 90.0 | -1.33 | 3800 | 1.00 | -5 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A283-C | t 8¡¿©ª40188 | 2438 | 6096 | N/A | N/A | 79.66 | FCAW FILLET (2F) | 487.2 | 38.40 | 90.0 | 163.00 | 3800 | 1.00 | 619 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A516-70 | t 13¡¿(©ª41784 - ©ª40088) | 848 | N/A | 20 | 11.13 | SMAW V-GROOVE (1G+4G) | 17.0 | 104.70 | 60.0 | 23.23 | 59000 | 1.00 | 1,371 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
5.1 ROOF PLATE | A516-60 | t 5, RR=33280 | 2334 | 3893 | N/A | N/A | 66.01 | FCAW(1G) BUTT OR SINGLE LAP | 1502.4 | 14.58 | 70.0 | 245.66 | 3200 | 1.00 | 786 | FCAW ROOF (OD 1.4 DS 7100), About Unit Price = 3200 (¿ø/kg) |
5.2 ROOF PLATE to Rafter/Girder | A36 | H300X150X6.5X9 | 19464(L) | 56 Rafters + 5 Rings(L:412.4m) | 55.14 | FCAW (4F) ©ª1.2 DS7100 E71T-1C | 1502.4 | 29.16 | 70.0 | 491.30 | 3200 | 1.00 | 1,572 | FCAW(DS7100), About Unit Price = 3200 (¿ø/kg) | ||
A. Turkey SECL (2 ONE-FOOT) TANK Weld Metal Total = | 1494.97 | kg | 6,234 | (õ¿ø) | ||||||||||||
INNER/OUTER TANK TOTAL = | 1494.97 | kg | 6,234 | (õ¿ø) |
A) ¸µÄÁ X-Groove ¿ëÁ¢ºÎ ´Ü¸éÀû °è»ê![]() | B) ¶Ç ´Ù¸¥ ¿ëÁ¢ºÎ ´Ü¸éÀû °è»ê![]() |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
A. Turkey SECL (2 ONE-FOOT) TANK Net Weight (¼³°èÁß·®) ¡¡¡¡D= 41.6 (m), H= 15.2 (m) | Horizontal Weld (¼öÆò¿ëÁ¢ : 2G) [ÀÚµ¿:SAW or ¼öµ¿:SMAW] [¿ëÂøÈ¿À²:SAW (95%) / ¼öµ¿:SMAW (60%)] | Vertical Weld (¼öÁ÷¿ëÁ¢) [ FCAW ¿ëÂøÈ¿À²: (90%) ] | ÇÕ°èÁß·® | REMARK | ![]() [»õâ¿¡¼] A. Turkey SECL (2 ONE-FOOT) TANK Å« À̹ÌÁö ·Î º¸±â [»õâ¿¡¼] PDF µµ¸é º¸±â [»õâ¿¡¼] SHOP_WPS_PQR_SUMBAWA_50K PDF º¸±â |
||||||||||||||||
No. | Material | Thickness (mm) | Width (mm) | Length (mm) | Qty (SHT) | Weight (Ton) | Joint No. | ¼öÆò¿ëÁ¢ ÃѱæÀÌ (m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | Joint No. | shCirQty=[10] ¼öÁ÷¿ëÁ¢ ÃѱæÀÌ VL = 10 PCS * Each S.W(m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ¼öÆò+¼öÁ÷ ¿ëÁ¢ºÀÁß·® (kg) | REMARK | |
7 | A516-70 (Comp. Ring+Top Shell) | 11.5 | 800 | 13072 | 10 | 9.440 | 2G-H7 | 130 | 77.76 | 79.35 | 95 | 83.53 | 3G-V7 | 0.8m *10= 8 m | -1.00 | -0.06 | 90 | -0.07 | 83.46 | ||
6 | A516-70 | 8.0 | 2400 | 13071 | 10 | 19.700 | 2G-H6 | 130 | -1.00 | -1.02 | 95 | -1.07 | 3G-V6 | 2.4m *10= 24 m | -1.00 | -0.19 | 90 | -0.21 | -1.28 | ||
5 | A516-70 | 8.5 | 2400 | 13071 | 10 | 20.930 | 2G-H5 | 130 | -1.00 | -1.02 | 95 | -1.07 | 3G-V5 | 2.4m *10= 24 m | -1.00 | -0.19 | 90 | -0.21 | -1.28 | ||
4 | A516-70 | 11.5 | 2400 | 13072 | 10 | 28.320 | 2G-H4 | 130 | -1.00 | -1.02 | 95 | -1.07 | 3G-V4 | 2.4m *10= 24 m | -1.00 | -0.19 | 90 | -0.21 | -1.28 | ||
3 | A516-70 | 14.0 | 2400 | 13073 | 10 | 34.480 | 2G-H3 | 130 | -1.00 | -1.02 | 95 | -1.07 | 3G-V3 | 2.4m *10= 24 m | -1.00 | -0.19 | 90 | -0.21 | -1.28 | ||
2 | A516-70 | 17.0 | 2400 | 13074 | 10 | 41.870 | 2G-H2 | 130 | -1.00 | -1.02 | 95 | -1.07 | 3G-V2 | 2.4m *10= 24 m | -1.00 | -0.19 | 90 | -0.21 | -1.28 | ||
1 | A516-70 | 20.0 | 2400 | 13075 | 10 | 49.270 | 2G-H1 | 130 | -1.00 | -1.02 | 98 | -1.07 | 3G-V1 | 2.4m *10= 24 m | -1.00 | -0.19 | 90 | -0.21 | -1.28 | ||
A) | 1st Shell + Annular Plate | t1st= 20 tAnn= 13 | 2400 | 13075 | N/A | N/A | 1F-An | 130.0 | 98.00 | 100.01 | 60 | 166.68 | - | - | - | - | - | - | -1.07 | ||
A. Turkey SECL (2 ONE-FOOT) TANK Total = | 70 | 204.0 | HLEN = | 1040.0 | 169.76 | 173.24 | 98 | 243.79 | VLEN = | 152.000 | -7.00 | -1.20 | 90 | -1.33 | 242.46 | ||||||
B. TK-002 (ONE-FOOT) TANK Net Weight (¼³°èÁß·®) ¡¡¡¡D= 40 (m), H= 23 (m) | Horizontal Weld (¼öÆò¿ëÁ¢ : 2G) [ÀÚµ¿:SAW or ¼öµ¿:SMAW] [¿ëÂøÈ¿À²:SAW (95%) / ¼öµ¿:SMAW (60%)] | Vertical Weld (¼öÁ÷¿ëÁ¢) [ FCAW ¿ëÂøÈ¿À²: (90%) ] | ÇÕ°èÁß·® | REMARK | ![]() [»õâ¿¡¼] B. TK-002 (ONE-FOOT) TANK Å« À̹ÌÁö ·Î º¸±â [»õâ¿¡¼] PDF µµ¸é º¸±â [»õâ¿¡¼] SHOP_WPS_PQR_SUMBAWA_50K PDF º¸±â |
||||||||||||||||
No. | Material | Thickness (mm) | Width (mm) | Length (mm) | Qty (SHT) | Weight (Ton) | Joint No. | ¼öÆò¿ëÁ¢ ÃѱæÀÌ (m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | Joint No. | shCirQty=[10] ¼öÁ÷¿ëÁ¢ ÃѱæÀÌ VL = 10 PCS * Each S.W(m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ¼öÆò+¼öÁ÷ ¿ëÁ¢ºÀÁß·® (kg) | REMARK | |
12 | A516-70 (Comp. Ring+Top Shell) | 13.0 | 1000 | 12570 | 10 | 12.830 | 2G-H12 | 125 | 99.37 | 97.51 | 95 | 102.64 | 3G-V12 | 1m *10= 10 m | -1.00 | -0.08 | 90 | -0.09 | 102.55 | ||
11 | A516-70 | 8.0 | 2000 | 12568 | 10 | 15.790 | 2G-H11 | 125 | -1.00 | -0.98 | 95 | -1.03 | 3G-V11 | 2m *10= 20 m | -1.00 | -0.16 | 90 | -0.18 | -1.21 | ||
10 | A516-70 | 10.0 | 2000 | 12569 | 10 | 19.730 | 2G-H10 | 125 | -1.00 | -0.98 | 95 | -1.03 | 3G-V10 | 2m *10= 20 m | -1.00 | -0.16 | 90 | -0.18 | -1.21 | ||
9 | A516-70 | 13.0 | 2000 | 12570 | 10 | 25.660 | 2G-H9 | 125 | -1.00 | -0.98 | 95 | -1.03 | 3G-V9 | 2m *10= 20 m | -1.00 | -0.16 | 90 | -0.18 | -1.21 | ||
8 | A516-70 | 15.5 | 2000 | 12571 | 10 | 30.590 | 2G-H8 | 125 | -1.00 | -0.98 | 95 | -1.03 | 3G-V8 | 2m *10= 20 m | -1.00 | -0.16 | 90 | -0.18 | -1.21 | ||
7 | A516-70 | 18.0 | 2000 | 12572 | 10 | 35.530 | 2G-H7 | 125 | -1.00 | -0.98 | 95 | -1.03 | 3G-V7 | 2m *10= 20 m | -1.00 | -0.16 | 90 | -0.18 | -1.21 | ||
6 | A516-70 | 21.0 | 2000 | 12572 | 10 | 41.450 | 2G-H6 | 125 | -1.00 | -0.98 | 95 | -1.03 | 3G-V6 | 2m *10= 20 m | -1.00 | -0.16 | 90 | -0.18 | -1.21 | ||
5 | A516-70 | 23.5 | 2000 | 12573 | 10 | 46.390 | 2G-H5 | 125 | -1.00 | -0.98 | 95 | -1.03 | 3G-V5 | 2m *10= 20 m | -1.00 | -0.16 | 90 | -0.18 | -1.21 | ||
4 | A516-70 | 26.0 | 2000 | 12574 | 10 | 51.330 | 2G-H4 | 125 | -1.00 | -0.98 | 95 | -1.03 | 3G-V4 | 2m *10= 20 m | -1.00 | -0.16 | 90 | -0.18 | -1.21 | ||
3 | A516-70 | 29.0 | 2000 | 12575 | 10 | 57.250 | 2G-H3 | 125 | -1.00 | -0.98 | 95 | -1.03 | 3G-V3 | 2m *10= 20 m | -1.00 | -0.16 | 90 | -0.18 | -1.21 | ||
2 | A537-CL2 | 25.5 | 2000 | 12574 | 10 | 50.340 | 2G-H2 | 125 | -1.00 | -0.98 | 95 | -1.03 | 3G-V2 | 2m *10= 20 m | -1.00 | -0.16 | 90 | -0.18 | -1.21 | ||
1 | A537-CL2 | 27.5 | 2000 | 12575 | 10 | 54.290 | 2G-H1 | 125 | -1.00 | -0.98 | 98 | -1.03 | 3G-V1 | 2m *10= 20 m | -1.00 | -0.16 | 90 | -0.18 | -1.21 | ||
A) | 1st Shell + Annular Plate | t1st= 27.5 tAnn= 18 | 2000 | 12575 | N/A | N/A | 1F-An | 125.0 | 185.28 | 181.81 | 60 | 303.02 | - | - | - | - | - | - | -1.03 | ||
B. TK-002 (ONE-FOOT) TANK Total = | 120 | 441.2 | HLEN = | 1625.0 | 273.65 | 268.54 | 98 | 394.33 | VLEN = | 230.000 | -12.00 | -1.84 | 90 | -2.07 | 392.26 |
A. TK-001 (VPDM) TANK, D= 60 (m), H= 23 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 12th) | A537-CL2 | t 39.5 ~ 8 | 23000 | 11788 | 16 | 192 | 934.1 | SAW-2G (¼öÆò¿ëÁ¢) | 2444.0 | 408.89 | 98.0 | 981.52 | 6600 | 1.00 | 5,987 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 1177.82 | 3500 | 1.00 | 4,122 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 368.0 | -12.00 | 90.0 | -3.22 | 6100 | 1.00 | -20 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A283-C | t 9.5¡¿©ª57622 | 2438 | 6096 | N/A | N/A | 194.47 | FCAW FILLET (2F) | 935.2 | 54.15 | 90.0 | 442.00 | 6100 | 1.00 | 2,696 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A537-CL2 | t 26¡¿(©ª60262 - ©ª57522) | 1370 | N/A | 32 | 51.73 | SMAW V-GROOVE (1G+4G) | 43.8 | 418.60 | 60.0 | 240.1 | 59000 | 1.00 | 14,166 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
4. WIND STIFFENER | A537-CL2 | L150x15 | 11788 | 16 | 2 °³¼Ò (¾çÂÊÇÊ·¿¿¬¼Ó) | 6.68 | FCAW FILLET (2F+4F) ¾ç¸éÇÊ·¿¿¬¼Ó¿ëÁ¢ | 377.0 | 270.00 | 90.0 | 887.83 | 3200 | 1.00 | 2,841 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |
5.1 ROOF PLATE | A516-60 | t 5, RR=54000 | 2356 | 4115 | N/A | N/A | 124.89 | FCAW(1G) BUTT OR SINGLE LAP | 3130.8 | 14.58 | 70.0 | 511.90 | 3200 | 1.00 | 1,638 | FCAW ROOF (OD 1.4 DS 7100), About Unit Price = 3200 (¿ø/kg) |
5.2 ROOF PLATE to Rafter/Girder | A36 | H396X199X7X11 | 28806(L) | 80 Rafters + 7 Rings(L:826.3m) | 177.2 | FCAW (4F) ©ª1.2 DS7100 E71T-1C | 3130.8 | 29.16 | 70.0 | 1023.80 | 3200 | 1.00 | 3,276 | FCAW(DS7100), About Unit Price = 3200 (¿ø/kg) | ||
A. TK-001 (VPDM) TANK Weld Metal Total = | 5081.65 | kg | 34,706 | (õ¿ø) | ||||||||||||
B. Turkey SECL (1 ONE-FOOT) TANK, D= 31.6 (m), H= 15.2 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 7th) | A516-70 | t 15.5 ~ 8.5 | 15200 | 16553 | 6 | 42 | 122.2 | SAW-2G (¼öÆò¿ëÁ¢) | 792.0 | 95.34 | 98.0 | 106.06 | 3900 | 1.00 | 403 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 127.27 | 3300 | 1.00 | 419 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 91.2 | -7.00 | 90.0 | -0.76 | 3800 | 1.00 | -3 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A283-C | t 8¡¿©ª30380 | 2438 | 6096 | N/A | N/A | 45.52 | FCAW FILLET (2F) | 297.5 | 38.40 | 90.0 | 100.00 | 3800 | 1.00 | 380 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A516-70 | t 11¡¿(©ª31766 - ©ª30280) | 743 | N/A | 12 | 5.97 | SMAW V-GROOVE (1G+4G) | 8.9 | 68.30 | 60.0 | 7.97 | 59000 | 1.00 | 470 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
4. WIND STIFFENER | A516-70 | L150x15 | 16553 | 6 | 2 °³¼Ò (¾çÂÊÇÊ·¿¿¬¼Ó) | 3.53 | FCAW FILLET (2F+4F) ¾ç¸éÇÊ·¿¿¬¼Ó¿ëÁ¢ | 198.0 | 270.00 | 90.0 | 466.29 | 2850 | 1.00 | 1,329 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |
5.1 ROOF PLATE | A516-60 | t 5, RR=25280 | 2482 | 4687 | N/A | N/A | 38.09 | FCAW(1G) BUTT OR SINGLE LAP | 739.5 | 14.58 | 70.0 | 120.91 | 3200 | 1.00 | 387 | FCAW ROOF (OD 1.4 DS 7100), About Unit Price = 3200 (¿ø/kg) |
5.2 ROOF PLATE to Rafter/Girder | A36 | H194X150X6X9 | 14060(L) | 40 Rafters + 3 Rings(L:177.1m) | 22.63 | FCAW (4F) ©ª1.2 DS7100 E71T-1C | 739.5 | 29.16 | 70.0 | 241.83 | 3200 | 1.00 | 774 | FCAW(DS7100), About Unit Price = 3200 (¿ø/kg) | ||
B. Turkey SECL (1 ONE-FOOT) TANK Weld Metal Total = | 1221.60 | kg | 4,159 | (õ¿ø) | ||||||||||||
INNER/OUTER TANK TOTAL = | 1221.60 | kg | 4,159 | (õ¿ø) | ||||||||||||
A. Turkey SECL (2 ONE-FOOT) TANK, D= 41.6 (m), H= 15.2 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 7th) | A516-70 | t 20 ~ 11.5 | 15200 | 13075 | 10 | 70 | 204.0 | SAW-2G (¼öÆò¿ëÁ¢) | 1040.0 | 169.76 | 98.0 | 243.79 | 3900 | 1.00 | 926 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 292.55 | 3300 | 1.00 | 965 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 152.0 | -7.00 | 90.0 | -1.33 | 3800 | 1.00 | -5 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A283-C | t 8¡¿©ª40188 | 2438 | 6096 | N/A | N/A | 79.66 | FCAW FILLET (2F) | 487.2 | 38.40 | 90.0 | 163.00 | 3800 | 1.00 | 619 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A516-70 | t 13¡¿(©ª41784 - ©ª40088) | 848 | N/A | 20 | 11.13 | SMAW V-GROOVE (1G+4G) | 17.0 | 104.70 | 60.0 | 23.23 | 59000 | 1.00 | 1,371 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
5.1 ROOF PLATE | A516-60 | t 5, RR=33280 | 2334 | 3893 | N/A | N/A | 66.01 | FCAW(1G) BUTT OR SINGLE LAP | 1502.4 | 14.58 | 70.0 | 245.66 | 3200 | 1.00 | 786 | FCAW ROOF (OD 1.4 DS 7100), About Unit Price = 3200 (¿ø/kg) |
5.2 ROOF PLATE to Rafter/Girder | A36 | H300X150X6.5X9 | 19464(L) | 56 Rafters + 5 Rings(L:412.4m) | 55.14 | FCAW (4F) ©ª1.2 DS7100 E71T-1C | 1502.4 | 29.16 | 70.0 | 491.30 | 3200 | 1.00 | 1,572 | FCAW(DS7100), About Unit Price = 3200 (¿ø/kg) | ||
A. Turkey SECL (2 ONE-FOOT) TANK Weld Metal Total = | 1494.97 | kg | 6,234 | (õ¿ø) | ||||||||||||
INNER/OUTER TANK TOTAL = | 1494.97 | kg | 6,234 | (õ¿ø) | ||||||||||||
B. TK-002 (ONE-FOOT) TANK, D= 40 (m), H= 23 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 12th) | A537-CL2 | t 27.5 ~ 13 | 23000 | 12575 | 10 | 120 | 441.2 | SAW-2G (¼öÆò¿ëÁ¢) | 1625.0 | 273.65 | 98.0 | 394.33 | 6600 | 1.00 | 2,405 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 473.20 | 3500 | 1.00 | 1,656 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 230.0 | -12.00 | 90.0 | -2.07 | 6100 | 1.00 | -13 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A283-C | t 9.5¡¿©ª38354 | 2438 | 6096 | N/A | N/A | 86.16 | FCAW FILLET (2F) | 454.0 | 54.15 | 90.0 | 214.00 | 6100 | 1.00 | 1,305 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A537-CL2 | t 18¡¿(©ª40214 - ©ª38254) | 980 | N/A | 20 | 17.07 | SMAW V-GROOVE (1G+4G) | 19.6 | 200.60 | 60.0 | 51.43 | 59000 | 1.00 | 3,034 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
5.1 ROOF PLATE | A516-60 | t 5, RR=36000 | 2417 | 4550 | N/A | N/A | 59.34 | FCAW(1G) BUTT OR SINGLE LAP | 1250.4 | 14.58 | 70.0 | 204.44 | 3200 | 1.00 | 654 | FCAW ROOF (OD 1.4 DS 7100), About Unit Price = 3200 (¿ø/kg) |
5.2 ROOF PLATE to Rafter/Girder | A36 | H300X150X6.5X9 | 18202(L) | 52 Rafters + 4 Rings(L:303.9m) | 45.89 | FCAW (4F) ©ª1.2 DS7100 E71T-1C | 1250.4 | 29.16 | 70.0 | 408.89 | 3200 | 1.00 | 1,308 | FCAW(DS7100), About Unit Price = 3200 (¿ø/kg) | ||
B. TK-002 (ONE-FOOT) TANK Weld Metal Total = | 1752.79 | kg | 10,349 | (õ¿ø) | ||||||||||||
INNER/OUTER TANK TOTAL = | 1752.79 | kg | 10,349 | (õ¿ø) |
A) ¸µÄÁ X-Groove ¿ëÁ¢ºÎ ´Ü¸éÀû °è»ê![]() | B) ¶Ç ´Ù¸¥ ¿ëÁ¢ºÎ ´Ü¸éÀû °è»ê![]() |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
[SECL] LP Ethylene / INNER TANK Net Weight (¼³°èÁß·®) ¡¡¡¡D= 42 (m), H= 35.8 (m) | Horizontal Weld (¼öÆò¿ëÁ¢ : 2G) [ÀÚµ¿:SAW or ¼öµ¿:SMAW] [¿ëÂøÈ¿À²:SAW (95%) / ¼öµ¿:SMAW (60%)] | Vertical Weld (¼öÁ÷¿ëÁ¢) [ FCAW ¿ëÂøÈ¿À²: (90%) ] | ÇÕ°èÁß·® | REMARK | ![]() [»õâ¿¡¼] [SECL] LP Ethylene / INNER TANK Å« À̹ÌÁö ·Î º¸±â [»õâ¿¡¼] PDF µµ¸é º¸±â [»õâ¿¡¼] ÀúÀåÅÊÅ© ¿ëÁ¢ Ç¥ÁØÈ CAD ÆÄÀÏ (dwg) [»õâ¿¡¼] STE_ÀúÀåÅÊÅ©_¿ëÁ¢ºÎ_°³¼±Ç¥ÁØ_Ȳ»óÈ (pdf) [»õâ¿¡¼] SHOP_WPS_PQR_SUMBAWA_50K PDF º¸±â [»õâ¿¡¼] ¿ëÁ¢ºÎ_¿ëÀÔ¸éÀû_»êÃâ_ÀÌÇѳª.pdf |
||||||||||||||||
No. | Material | Thickness (mm) | Width (mm) | Length (mm) | Qty (SHT) | Weight (Ton) | Joint No. | ¼öÆò¿ëÁ¢ ÃѱæÀÌ (m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | Joint No. | shCirQty=[10] ¼öÁ÷¿ëÁ¢ ÃѱæÀÌ VL = 10 PCS * Each S.W(m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ¼öÆò+¼öÁ÷ ¿ëÁ¢ºÀÁß·® (kg) | REMARK | |
11 | A553-TYPE1 | 6.4 | 3200 | 13196 | 10 | 21.050 | 2G-H11 | 131 | -1.00 | -1.03 | 95 | -1.08 | 3G-V11 | 3.2m *10= 32 m | -1.00 | -0.25 | 90 | -0.28 | -1.36 | ||
10 | A553-TYPE1 | 6.4 | 3260 | 13196 | 10 | 21.440 | 2G-H10 | 131 | -1.00 | -1.03 | 95 | -1.08 | 3G-V10 | 3.26m *10= 32.6 m | -1.00 | -0.26 | 90 | -0.29 | -1.37 | ||
9 | A553-TYPE1 | 7.5 | 3260 | 13197 | 10 | 25.330 | 2G-H9 | 131 | -1.00 | -1.03 | 95 | -1.08 | 3G-V9 | 3.26m *10= 32.6 m | -1.00 | -0.26 | 90 | -0.29 | -1.37 | ||
8 | A553-TYPE1 | 9.0 | 3260 | 13197 | 10 | 30.400 | 2G-H8 | 131 | -1.00 | -1.03 | 95 | -1.08 | 3G-V8 | 3.26m *10= 32.6 m | -1.00 | -0.26 | 90 | -0.29 | -1.37 | ||
7 | A553-TYPE1 | 10.5 | 3260 | 13197 | 10 | 35.460 | 2G-H7 | 131 | -1.00 | -1.03 | 95 | -1.08 | 3G-V7 | 3.26m *10= 32.6 m | -1.00 | -0.26 | 90 | -0.29 | -1.37 | ||
6 | A553-TYPE1 | 12.5 | 3260 | 13198 | 10 | 42.220 | 2G-H6 | 131 | -1.00 | -1.03 | 95 | -1.08 | 3G-V6 | 3.26m *10= 32.6 m | -1.00 | -0.26 | 90 | -0.29 | -1.37 | ||
5 | A553-TYPE1 | 14.0 | 3260 | 13199 | 10 | 47.290 | 2G-H5 | 131 | -1.00 | -1.03 | 95 | -1.08 | 3G-V5 | 3.26m *10= 32.6 m | -1.00 | -0.26 | 90 | -0.29 | -1.37 | ||
4 | A553-TYPE1 | 15.5 | 3260 | 13199 | 10 | 52.360 | 2G-H4 | 131 | -1.00 | -1.03 | 95 | -1.08 | 3G-V4 | 3.26m *10= 32.6 m | -1.00 | -0.26 | 90 | -0.29 | -1.37 | ||
3 | A553-TYPE1 | 17.5 | 3260 | 13200 | 10 | 59.120 | 2G-H3 | 132 | -1.00 | -1.04 | 95 | -1.09 | 3G-V3 | 3.26m *10= 32.6 m | -1.00 | -0.26 | 90 | -0.29 | -1.38 | ||
2 | A553-TYPE1 | 19.0 | 3260 | 13200 | 10 | 64.180 | 2G-H2 | 132 | -1.00 | -1.04 | 95 | -1.09 | 3G-V2 | 3.26m *10= 32.6 m | -1.00 | -0.26 | 90 | -0.29 | -1.38 | ||
1 | A553-TYPE1 | 20.5 | 3260 | 13201 | 10 | 69.250 | 2G-H1 | 132 | -1.00 | -1.04 | 98 | -1.09 | 3G-V1 | 3.26m *10= 32.6 m | -1.00 | -0.26 | 90 | -0.29 | -1.38 | ||
A) | 1st Shell + Annular Plate | t1st= 20.5 tAnn= 13.5 | 3260 | 13201 | N/A | N/A | 1F-An | 132.0 | 102.96 | 106.69 | 60 | 177.82 | - | - | - | - | - | - | -1.09 | ||
[SECL] LP Ethylene / INNER TANK Total = | 110 | 468.1 | HLEN = | 1576.0 | 91.96 | 95.33 | 98 | 165.91 | VLEN = | 358.000 | -11.00 | -2.85 | 90 | -3.18 | 162.73 | ||||||
[SECL] LP Ethylene / OUTER TANK Net Weight (¼³°èÁß·®) ¡¡¡¡D= 44 (m), H= 37.8 (m) | Horizontal Weld (¼öÆò¿ëÁ¢ : 2G) [ÀÚµ¿:SAW or ¼öµ¿:SMAW] [¿ëÂøÈ¿À²:SAW (95%) / ¼öµ¿:SMAW (60%)] | Vertical Weld (¼öÁ÷¿ëÁ¢) [ FCAW ¿ëÂøÈ¿À²: (90%) ] | ÇÕ°èÁß·® | REMARK | ![]() [»õâ¿¡¼] [SECL] LP Ethylene / OUTER TANK Å« À̹ÌÁö ·Î º¸±â [»õâ¿¡¼] PDF µµ¸é º¸±â [»õâ¿¡¼] SHOP_WPS_PQR_SUMBAWA_50K PDF º¸±â |
||||||||||||||||
No. | Material | Thickness (mm) | Width (mm) | Length (mm) | Qty (SHT) | Weight (Ton) | Joint No. | ¼öÆò¿ëÁ¢ ÃѱæÀÌ (m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | Joint No. | shCirQty=[10] ¼öÁ÷¿ëÁ¢ ÃѱæÀÌ VL = 10 PCS * Each S.W(m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ¼öÆò+¼öÁ÷ ¿ëÁ¢ºÀÁß·® (kg) | REMARK | |
11 | A553-TYPE1 (Comp. Ring+Top Shell) | 35.0 | 1800 | 13834 | 10 | 68.420 | 2G-H11 | 138 | 720.30 | 780.30 | 95 | 821.37 | 3G-V11 | 1.8m *10= 18 m | -1.00 | -0.14 | 90 | -0.16 | 821.21 | ||
10 | A553-TYPE1 | 7.9 | 3600 | 13825 | 10 | 31.010 | 2G-H10 | 138 | -1.00 | -1.08 | 95 | -1.14 | 3G-V10 | 3.6m *10= 36 m | -1.00 | -0.28 | 90 | -0.31 | -1.45 | ||
9 | A553-TYPE1 | 8.0 | 3600 | 13825 | 10 | 31.260 | 2G-H9 | 138 | -1.00 | -1.08 | 95 | -1.14 | 3G-V9 | 3.6m *10= 36 m | -1.00 | -0.28 | 90 | -0.31 | -1.45 | ||
8 | A553-TYPE1 | 10.0 | 3600 | 13826 | 10 | 39.070 | 2G-H8 | 138 | -1.00 | -1.08 | 95 | -1.14 | 3G-V8 | 3.6m *10= 36 m | -1.00 | -0.28 | 90 | -0.31 | -1.45 | ||
7 | A553-TYPE1 | 11.5 | 3600 | 13826 | 10 | 44.930 | 2G-H7 | 138 | -1.00 | -1.08 | 95 | -1.14 | 3G-V7 | 3.6m *10= 36 m | -1.00 | -0.28 | 90 | -0.31 | -1.45 | ||
6 | A553-TYPE1 | 13.5 | 3600 | 13827 | 10 | 52.750 | 2G-H6 | 138 | -1.00 | -1.08 | 95 | -1.14 | 3G-V6 | 3.6m *10= 36 m | -1.00 | -0.28 | 90 | -0.31 | -1.45 | ||
5 | A553-TYPE1 | 15.5 | 3600 | 13827 | 10 | 60.570 | 2G-H5 | 138 | -1.00 | -1.08 | 95 | -1.14 | 3G-V5 | 3.6m *10= 36 m | -1.00 | -0.28 | 90 | -0.31 | -1.45 | ||
4 | A553-TYPE1 | 17.5 | 3600 | 13828 | 10 | 68.390 | 2G-H4 | 138 | -1.00 | -1.08 | 95 | -1.14 | 3G-V4 | 3.6m *10= 36 m | -1.00 | -0.28 | 90 | -0.31 | -1.45 | ||
3 | A553-TYPE1 | 19.5 | 3600 | 13829 | 10 | 76.210 | 2G-H3 | 138 | -1.00 | -1.08 | 95 | -1.14 | 3G-V3 | 3.6m *10= 36 m | -1.00 | -0.28 | 90 | -0.31 | -1.45 | ||
2 | A553-TYPE1 | 21.5 | 3600 | 13829 | 10 | 84.020 | 2G-H2 | 138 | -1.00 | -1.08 | 95 | -1.14 | 3G-V2 | 3.6m *10= 36 m | -1.00 | -0.28 | 90 | -0.31 | -1.45 | ||
1 | A553-TYPE1 | 23.0 | 3600 | 13830 | 10 | 89.890 | 2G-H1 | 138 | -1.00 | -1.08 | 98 | -1.14 | 3G-V1 | 3.6m *10= 36 m | -1.00 | -0.28 | 90 | -0.31 | -1.45 | ||
A) | 1st Shell + Annular Plate | t1st= 23 tAnn= 15 | 3600 | 13830 | N/A | N/A | 1F-An | 138.0 | 129.60 | 140.40 | 60 | 234.00 | - | - | - | - | - | - | -1.14 | ||
[SECL] LP Ethylene / OUTER TANK Total = | 110 | 646.5 | HLEN = | 1656.0 | 839.90 | 909.90 | 98 | 1043.97 | VLEN = | 378.000 | -11.00 | -2.94 | 90 | -3.26 | 1040.71 |
[SECL] LP Ethylene / INNER TANK, D= 42 (m), H= 35.8 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 11th) | A553-TYPE1 | t 20.5 ~ 6.35 | 35800 | 13201 | 10 | 110 | 468.1 | SAW-2G (¼öÆò¿ëÁ¢) | 1576.0 | 91.96 | 98.0 | 165.91 | 89000 | 1.00 | 17,089 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 199.09 | 5500 | 1.00 | 1,094 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 358.0 | -11.00 | 90.0 | -3.18 | 103000 | 1.00 | -328 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A553-TYPE1 | t 7¡¿©ª40282 | 3048 | 12192 | N/A | N/A | 70.03 | FCAW FILLET (2F) | 391.7 | 29.40 | 90.0 | 100.00 | 103000 | 1.00 | 10,300 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A553-TYPE1 | t 14¡¿(©ª42186 - ©ª40182) | 1002 | N/A | 20 | 13.74 | SMAW V-GROOVE (1G+4G) | 20.0 | 112.90 | 60.0 | 29.6 | 59000 | 1.00 | 1,746 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
4. STIFFENER / TOP GIRDER | A553-TYPE1 | L450x6.35+120x6.35 FB 170x6 | 13201 | 10 | 18 °³¼Ò (¾çÂÊÇÊ·¿¿¬¼Ó) | 26.85 | FCAW FILLET (2F+4F) ¾ç¸éÇÊ·¿¿¬¼Ó¿ëÁ¢ | 2376.0 | 120.00 | 90.0 | 2486.88 | 103000 | 1.00 | 256,149 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |
[SECL] LP Ethylene / INNER TANK Weld Metal Total = | 3008.70 | kg | 286,050 | (õ¿ø) | ||||||||||||
[SECL] LP Ethylene / OUTER TANK, D= 44 (m), H= 37.8 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 11th) | A553-TYPE1 | t 23 ~ 35 | 37800 | 13830 | 10 | 110 | 646.5 | SAW-2G (¼öÆò¿ëÁ¢) | 1656.0 | 839.90 | 98.0 | 1043.97 | 89000 | 1.00 | 107,529 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 1252.76 | 5500 | 1.00 | 6,890 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 378.0 | -11.00 | 90.0 | -3.26 | 103000 | 1.00 | -336 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A553-TYPE1 | t 7¡¿©ª39986 | 2438 | 6096 | N/A | N/A | 69.0 | FCAW FILLET (2F) | 483.7 | 29.40 | 90.0 | 124.00 | 103000 | 1.00 | 12,772 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A553-TYPE1 | t 15¡¿(©ª44196 - ©ª39886) | 2155 | N/A | 20 | 33.51 | SMAW V-GROOVE (1G+4G) | 43.1 | 139.30 | 60.0 | 78.55 | 59000 | 1.00 | 4,634 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
4. WIND STIFFENER | A553-TYPE1 | L150x15 | 13830 | 10 | 2 °³¼Ò (¾çÂÊÇÊ·¿¿¬¼Ó) | 4.91 | FCAW FILLET (2F+4F) ¾ç¸éÇÊ·¿¿¬¼Ó¿ëÁ¢ | 276.0 | 270.00 | 90.0 | 649.98 | 103000 | 1.00 | 66,948 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |
5.1 ROOF PLATE | A516-70 | t 7, RR=35200 | 2468 | 4152 | N/A | N/A | 88.89 | FCAW(1G) BUTT OR SINGLE LAP | 1590.9 | 42.25 | 70.0 | 753.79 | 3200 | 1.00 | 2,412 | FCAW ROOF (OD 1.4 DS 7100), About Unit Price = 3200 (¿ø/kg) |
5.2 ROOF PLATE to Rafter/Girder | A36 | H346X174X6X9 | 20761(L) | 56 Rafters + 5 Rings(L:428.3m) | 65.86 | FCAW (4F) ©ª1.2 DS7100 E71T-1C | 1590.9 | 42.25 | 70.0 | 753.79 | 3200 | 1.00 | 2,412 | FCAW(DS7100), About Unit Price = 3200 (¿ø/kg) | ||
[SECL] LP Ethylene / OUTER TANK Weld Metal Total = | 4635.03 | kg | 203,261 | (õ¿ø) | ||||||||||||
INNER/OUTER TANK TOTAL = | 7643.73 | kg | 489,312 | (õ¿ø) |
A) ¸µÄÁ X-Groove ¿ëÁ¢ºÎ ´Ü¸éÀû °è»ê![]() | B) ¶Ç ´Ù¸¥ ¿ëÁ¢ºÎ ´Ü¸éÀû °è»ê![]() |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
ÇÑÈ-´ë»ê LPG / INNER TANK Net Weight (¼³°èÁß·®) ¡¡¡¡D= 62.2 (m), H= 40.23 (m) | Horizontal Weld (¼öÆò¿ëÁ¢ : 2G) [ÀÚµ¿:SAW or ¼öµ¿:SMAW] [¿ëÂøÈ¿À²:SAW (95%) / ¼öµ¿:SMAW (60%)] | Vertical Weld (¼öÁ÷¿ëÁ¢) [ FCAW ¿ëÂøÈ¿À²: (90%) ] | ÇÕ°èÁß·® | REMARK | ![]() [»õâ¿¡¼] ÇÑÈ-´ë»ê LPG / INNER TANK Å« À̹ÌÁö ·Î º¸±â [»õâ¿¡¼] PDF µµ¸é º¸±â [»õâ¿¡¼] ÀúÀåÅÊÅ© ¿ëÁ¢ Ç¥ÁØÈ CAD ÆÄÀÏ (dwg) [»õâ¿¡¼] STE_ÀúÀåÅÊÅ©_¿ëÁ¢ºÎ_°³¼±Ç¥ÁØ_Ȳ»óÈ (pdf) [»õâ¿¡¼] SHOP_WPS_PQR_SUMBAWA_50K PDF º¸±â [»õâ¿¡¼] ¿ëÁ¢ºÎ_¿ëÀÔ¸éÀû_»êÃâ_ÀÌÇѳª.pdf |
||||||||||||||||
No. | Material | Thickness (mm) | Width (mm) | Length (mm) | Qty (SHT) | Weight (Ton) | Joint No. | ¼öÆò¿ëÁ¢ ÃѱæÀÌ (m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | Joint No. | shCirQty=[16] ¼öÁ÷¿ëÁ¢ ÃѱæÀÌ VL = 16 PCS * Each S.W(m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ¼öÆò+¼öÁ÷ ¿ëÁ¢ºÀÁß·® (kg) | REMARK | |
12 | A537-CL2+S5 | 11.0 | 3347 | 12215 | 16 | 56.480 | 2G-H12 | 195 | -1.00 | -1.53 | 95 | -1.61 | 3G-V12 | 3.347m *16= 53.552 m | -1.00 | -0.42 | 90 | -0.47 | -2.08 | ||
11 | A537-CL2+S5 | 12.0 | 3353 | 12215 | 16 | 61.728 | 2G-H11 | 195 | -1.00 | -1.53 | 95 | -1.61 | 3G-V11 | 3.353m *16= 53.648 m | -1.00 | -0.42 | 90 | -0.47 | -2.08 | ||
10 | A537-CL2+S5 | 12.0 | 3353 | 12215 | 16 | 61.728 | 2G-H10 | 195 | -1.00 | -1.53 | 95 | -1.61 | 3G-V10 | 3.353m *16= 53.648 m | -1.00 | -0.42 | 90 | -0.47 | -2.08 | ||
9 | A537-CL2+S5 | 14.0 | 3353 | 12215 | 16 | 72.016 | 2G-H9 | 195 | -1.00 | -1.53 | 95 | -1.61 | 3G-V9 | 3.353m *16= 53.648 m | -1.00 | -0.42 | 90 | -0.47 | -2.08 | ||
8 | A537-CL2+S5 | 18.0 | 3353 | 12216 | 16 | 92.608 | 2G-H8 | 195 | -1.00 | -1.53 | 95 | -1.61 | 3G-V8 | 3.353m *16= 53.648 m | -1.00 | -0.42 | 90 | -0.47 | -2.08 | ||
7 | A537-CL2+S5 | 22.0 | 3353 | 12217 | 16 | 113.184 | 2G-H7 | 195 | -1.00 | -1.53 | 95 | -1.61 | 3G-V7 | 3.353m *16= 53.648 m | -1.00 | -0.42 | 90 | -0.47 | -2.08 | ||
6 | A537-CL2+S5 | 26.0 | 3353 | 12218 | 16 | 133.776 | 2G-H6 | 195 | -1.00 | -1.53 | 95 | -1.61 | 3G-V6 | 3.353m *16= 53.648 m | -1.00 | -0.42 | 90 | -0.47 | -2.08 | ||
5 | A537-CL2+S5 | 29.0 | 3353 | 12218 | 16 | 149.216 | 2G-H5 | 195 | -1.00 | -1.53 | 95 | -1.61 | 3G-V5 | 3.353m *16= 53.648 m | -1.00 | -0.42 | 90 | -0.47 | -2.08 | ||
4 | A537-CL2+S5 | 33.0 | 3353 | 12219 | 16 | 169.808 | 2G-H4 | 195 | -1.00 | -1.53 | 95 | -1.61 | 3G-V4 | 3.353m *16= 53.648 m | -1.00 | -0.42 | 90 | -0.47 | -2.08 | ||
3 | A537-CL2+S5 | 36.0 | 3353 | 12220 | 16 | 185.264 | 2G-H3 | 195 | -1.00 | -1.53 | 95 | -1.61 | 3G-V3 | 3.353m *16= 53.648 m | -1.00 | -0.42 | 90 | -0.47 | -2.08 | ||
2 | A537-CL2+S5 | 39.0 | 3353 | 12220 | 16 | 200.704 | 2G-H2 | 195 | -1.00 | -1.53 | 95 | -1.61 | 3G-V2 | 3.353m *16= 53.648 m | -1.00 | -0.42 | 90 | -0.47 | -2.08 | ||
1 | A537-CL2+S5 | 42.0 | 3353 | 12221 | 16 | 216.160 | 2G-H1 | 195 | -1.00 | -1.53 | 98 | -1.61 | 3G-V1 | 3.353m *16= 53.648 m | -1.00 | -0.42 | 90 | -0.47 | -2.08 | ||
A) | 1st Shell + Annular Plate | t1st= 42 tAnn= 27.5 | 3353 | 12221 | N/A | N/A | 1F-An | 195.0 | 432.18 | 661.56 | 60 | 1102.60 | - | - | - | - | - | - | -1.61 | ||
ÇÑÈ-´ë»ê LPG / INNER TANK Total = | 192 | 1512.7 | HLEN = | 2535.0 | 420.18 | 643.20 | 98 | 1083.28 | VLEN = | 643.680 | -12.00 | -5.04 | 90 | -5.64 | 1077.64 | ||||||
ÇÑÈ-´ë»ê LPG / OUTER TANK Net Weight (¼³°èÁß·®) ¡¡¡¡D= 64.2 (m), H= 42.2 (m) | Horizontal Weld (¼öÆò¿ëÁ¢ : 2G) [ÀÚµ¿:SAW or ¼öµ¿:SMAW] [¿ëÂøÈ¿À²:SAW (95%) / ¼öµ¿:SMAW (60%)] | Vertical Weld (¼öÁ÷¿ëÁ¢) [ FCAW ¿ëÂøÈ¿À²: (90%) ] | ÇÕ°èÁß·® | REMARK | ![]() [»õâ¿¡¼] ÇÑÈ-´ë»ê LPG / OUTER TANK Å« À̹ÌÁö ·Î º¸±â [»õâ¿¡¼] PDF µµ¸é º¸±â [»õâ¿¡¼] SHOP_WPS_PQR_SUMBAWA_50K PDF º¸±â |
||||||||||||||||
No. | Material | Thickness (mm) | Width (mm) | Length (mm) | Qty (SHT) | Weight (Ton) | Joint No. | ¼öÆò¿ëÁ¢ ÃѱæÀÌ (m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | Joint No. | shCirQty=[16] ¼öÁ÷¿ëÁ¢ ÃѱæÀÌ VL = 16 PCS * Each S.W(m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ¼öÆò+¼öÁ÷ ¿ëÁ¢ºÀÁß·® (kg) | REMARK | |
12 | A537-CL2+S5 (Comp. Ring+Top Shell) | 16.0 | 840 | 12608 | 16 | 21.280 | 2G-H12 | 201 | 150.53 | 237.51 | 95 | 250.01 | 3G-V12 | 0.84m *16= 13.44 m | -1.00 | -0.11 | 90 | -0.12 | 249.89 | ||
11 | A537-CL2+S5 | 16.0 | 3760 | 12608 | 16 | 95.264 | 2G-H11 | 201 | -1.00 | -1.58 | 95 | -1.66 | 3G-V11 | 3.76m *16= 60.16 m | -1.00 | -0.47 | 90 | -0.52 | -2.18 | ||
10 | A537-CL2+S5 | 16.0 | 3760 | 12608 | 16 | 95.264 | 2G-H10 | 201 | -1.00 | -1.58 | 95 | -1.66 | 3G-V10 | 3.76m *16= 60.16 m | -1.00 | -0.47 | 90 | -0.52 | -2.18 | ||
9 | A537-CL2+S5 | 17.0 | 3760 | 12608 | 16 | 101.216 | 2G-H9 | 201 | -1.00 | -1.58 | 95 | -1.66 | 3G-V9 | 3.76m *16= 60.16 m | -1.00 | -0.47 | 90 | -0.52 | -2.18 | ||
8 | A537-CL2+S5 | 17.0 | 3760 | 12608 | 16 | 101.216 | 2G-H8 | 201 | -1.00 | -1.58 | 95 | -1.66 | 3G-V8 | 3.76m *16= 60.16 m | -1.00 | -0.47 | 90 | -0.52 | -2.18 | ||
7 | A537-CL2+S5 | 19.0 | 3760 | 12609 | 16 | 113.136 | 2G-H7 | 201 | -1.00 | -1.58 | 95 | -1.66 | 3G-V7 | 3.76m *16= 60.16 m | -1.00 | -0.47 | 90 | -0.52 | -2.18 | ||
6 | A537-CL2+S5 | 23.0 | 3760 | 12610 | 16 | 136.976 | 2G-H6 | 201 | -1.00 | -1.58 | 95 | -1.66 | 3G-V6 | 3.76m *16= 60.16 m | -1.00 | -0.47 | 90 | -0.52 | -2.18 | ||
5 | A537-CL2+S5 | 27.0 | 3760 | 12610 | 16 | 160.784 | 2G-H5 | 201 | -1.00 | -1.58 | 95 | -1.66 | 3G-V5 | 3.76m *16= 60.16 m | -1.00 | -0.47 | 90 | -0.52 | -2.18 | ||
4 | A537-CL2+S5 | 31.0 | 3760 | 12611 | 16 | 184.624 | 2G-H4 | 201 | -1.00 | -1.58 | 95 | -1.66 | 3G-V4 | 3.76m *16= 60.16 m | -1.00 | -0.47 | 90 | -0.52 | -2.18 | ||
3 | A537-CL2+S5 | 35.0 | 3760 | 12612 | 16 | 208.464 | 2G-H3 | 201 | -1.00 | -1.58 | 95 | -1.66 | 3G-V3 | 3.76m *16= 60.16 m | -1.00 | -0.47 | 90 | -0.52 | -2.18 | ||
2 | A537-CL2+S5 | 39.0 | 3760 | 12613 | 16 | 232.304 | 2G-H2 | 201 | -1.00 | -1.58 | 95 | -1.66 | 3G-V2 | 3.76m *16= 60.16 m | -1.00 | -0.47 | 90 | -0.52 | -2.18 | ||
1 | A537-CL2+S5 | 43.0 | 3760 | 12614 | 16 | 256.160 | 2G-H1 | 201 | -1.00 | -1.58 | 98 | -1.66 | 3G-V1 | 3.76m *16= 60.16 m | -1.00 | -0.47 | 90 | -0.52 | -2.18 | ||
A) | 1st Shell + Annular Plate | t1st= 43 tAnn= 28 | 3760 | 12614 | N/A | N/A | 1F-An | 201.0 | 453.00 | 714.77 | 60 | 1191.28 | - | - | - | - | - | - | -1.66 | ||
ÇÑÈ-´ë»ê LPG / OUTER TANK Total = | 192 | 1706.7 | HLEN = | 2613.0 | 592.53 | 934.90 | 98 | 1423.03 | VLEN = | 675.200 | -12.00 | -5.28 | 90 | -5.84 | 1417.19 |
ÇÑÈ-´ë»ê LPG / INNER TANK, D= 62.2 (m), H= 40.23 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 12th) | A537-CL2+S5 | t 42 ~ 11 | 40230 | 12221 | 16 | 192 | 1512.7 | SAW-2G (¼öÆò¿ëÁ¢) | 2535.0 | 420.18 | 98.0 | 1083.28 | 6600 | 1.00 | 6,608 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 1299.94 | 3500 | 1.00 | 4,549 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 643.7 | -12.00 | 90.0 | -5.64 | 6100 | 1.00 | -34 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A516-60N+S5 | t 8¡¿©ª58718 | 2438 | 6096 | N/A | N/A | 170.06 | FCAW FILLET (2F) | 966.6 | 38.40 | 90.0 | 324.00 | 6100 | 1.00 | 1,976 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A537-CL2+S5 | t 28¡¿(©ª62472 - ©ª58618) | 1927 | N/A | 32 | 79.12 | SMAW V-GROOVE (1G+4G) | 61.7 | 468.30 | 60.0 | 377.82 | 59000 | 1.00 | 22,291 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
4. STIFFENER / TOP GIRDER | A537-CL2+S5 | L450x11+120x11 FB 230x12 | 12221 | 16 | 7 °³¼Ò (¾çÂÊÇÊ·¿¿¬¼Ó) | 37.83 | FCAW FILLET (2F+4F) ¾ç¸éÇÊ·¿¿¬¼Ó¿ëÁ¢ | 1368.0 | 270.00 | 90.0 | 3221.64 | 3200 | 1.00 | 10,309 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |
ÇÑÈ-´ë»ê LPG / INNER TANK Weld Metal Total = | 5983.22 | kg | 45,699 | (õ¿ø) | ||||||||||||
ÇÑÈ-´ë»ê LPG / OUTER TANK, D= 64.2 (m), H= 42.2 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 12th) | A537-CL2+S5 | t 43 ~ 16 | 42200 | 12614 | 16 | 192 | 1706.7 | SAW-2G (¼öÆò¿ëÁ¢) | 2613.0 | 592.53 | 98.0 | 1423.03 | 6600 | 1.00 | 8,680 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 1707.64 | 3500 | 1.00 | 5,976 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 675.2 | -12.00 | 90.0 | -5.84 | 6100 | 1.00 | -36 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A516-60N+S5 | t 8¡¿©ª58342 | 2438 | 6096 | N/A | N/A | 167.89 | FCAW FILLET (2F) | 956.0 | 38.40 | 90.0 | 320.00 | 6100 | 1.00 | 1,952 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A537-CL2+S5 | t 28¡¿(©ª64476 - ©ª58242) | 3117 | N/A | 32 | 132.07 | SMAW V-GROOVE (1G+4G) | 99.7 | 485.50 | 60.0 | 633.57 | 59000 | 1.00 | 37,381 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
5.1 ROOF PLATE | A516-70 | t 6, RR=57780 | 2401 | 4433 | N/A | N/A | 169.83 | FCAW(1G) BUTT OR SINGLE LAP | 3482.4 | 36.00 | 70.0 | 1405.89 | 3200 | 1.00 | 4,499 | FCAW ROOF (OD 1.4 DS 7100), About Unit Price = 3200 (¿ø/kg) |
5.2 ROOF PLATE to Rafter/Girder | A36 | H396X199X7X11 | 31033(L) | 84 Rafters + 7 Rings(L:875.6m) | 197.09 | FCAW (4F) ©ª1.2 DS7100 E71T-1C | 3482.4 | 36.00 | 70.0 | 1405.89 | 3200 | 1.00 | 4,499 | FCAW(DS7100), About Unit Price = 3200 (¿ø/kg) | ||
ÇÑÈ-´ë»ê LPG / OUTER TANK Weld Metal Total = | 6316.61 | kg | 62,951 | (õ¿ø) | ||||||||||||
INNER/OUTER TANK TOTAL = | 12299.83 | kg | 108,651 | (õ¿ø) |
A) ¸µÄÁ X-Groove ¿ëÁ¢ºÎ ´Ü¸éÀû °è»ê![]() | B) ¶Ç ´Ù¸¥ ¿ëÁ¢ºÎ ´Ü¸éÀû °è»ê![]() |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
T-201 SUMBAWA 50000 KL LNG / INNER TANK Net Weight (¼³°èÁß·®) ¡¡¡¡D= 60 (m), H= 23.37 (m) | Horizontal Weld (¼öÆò¿ëÁ¢ : 2G) [ÀÚµ¿:SAW or ¼öµ¿:SMAW] [¿ëÂøÈ¿À²:SAW (95%) / ¼öµ¿:SMAW (60%)] | Vertical Weld (¼öÁ÷¿ëÁ¢) [ FCAW ¿ëÂøÈ¿À²: (90%) ] | ÇÕ°èÁß·® | REMARK | ![]() [»õâ¿¡¼] T-201 SUMBAWA 50000 KL LNG / INNER TANK Å« À̹ÌÁö ·Î º¸±â [»õâ¿¡¼] PDF µµ¸é º¸±â [»õâ¿¡¼] ÀúÀåÅÊÅ© ¿ëÁ¢ Ç¥ÁØÈ CAD ÆÄÀÏ (dwg) [»õâ¿¡¼] STE_ÀúÀåÅÊÅ©_¿ëÁ¢ºÎ_°³¼±Ç¥ÁØ_Ȳ»óÈ (pdf) [»õâ¿¡¼] SHOP_WPS_PQR_SUMBAWA_50K PDF º¸±â [»õâ¿¡¼] ¿ëÁ¢ºÎ_¿ëÀÔ¸éÀû_»êÃâ_ÀÌÇѳª.pdf |
||||||||||||||||
No. | Material | Thickness (mm) | Width (mm) | Length (mm) | Qty (SHT) | Weight (Ton) | Joint No. | ¼öÆò¿ëÁ¢ ÃѱæÀÌ (m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | Joint No. | shCirQty=[16] ¼öÁ÷¿ëÁ¢ ÃѱæÀÌ VL = 16 PCS * Each S.W(m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ¼öÆò+¼öÁ÷ ¿ëÁ¢ºÀÁß·® (kg) | REMARK | |
6 | A553-TYPE1 | 11.0 | 3880 | 11783 | 16 | 63.168 | 2G-H6 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V6 | 3.88m *16= 62.08 m | -1.00 | -0.49 | 90 | -0.54 | -2.10 | ||
5 | A553-TYPE1 | 11.0 | 3880 | 11783 | 16 | 63.168 | 2G-H5 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V5 | 3.88m *16= 62.08 m | -1.00 | -0.49 | 90 | -0.54 | -2.10 | ||
4 | A553-TYPE1 | 11.0 | 3880 | 11783 | 16 | 63.168 | 2G-H4 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V4 | 3.88m *16= 62.08 m | -1.00 | -0.49 | 90 | -0.54 | -2.10 | ||
3 | A553-TYPE1 | 12.0 | 3910 | 11783 | 16 | 69.440 | 2G-H3 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V3 | 3.91m *16= 62.56 m | -1.00 | -0.49 | 90 | -0.54 | -2.10 | ||
2 | A553-TYPE1 | 14.0 | 3910 | 11783 | 16 | 81.008 | 2G-H2 | 188 | -1.00 | -1.48 | 95 | -1.56 | 3G-V2 | 3.91m *16= 62.56 m | -1.00 | -0.49 | 90 | -0.54 | -2.10 | ||
1 | A553-TYPE1 | 16.5 | 3910 | 11784 | 16 | 95.488 | 2G-H1 | 188 | -1.00 | -1.48 | 98 | -1.56 | 3G-V1 | 3.91m *16= 62.56 m | -1.00 | -0.49 | 90 | -0.54 | -2.10 | ||
A) | 1st Shell + Annular Plate | t1st= 16.5 tAnn= 11 | 3910 | 11784 | N/A | N/A | 1F-An | 188.0 | 66.70 | 98.44 | 60 | 164.07 | - | - | - | - | - | - | -1.56 | ||
T-201 SUMBAWA 50000 KL LNG / INNER TANK Total = | 96 | 435.4 | HLEN = | 1316.0 | 60.70 | 89.56 | 98 | 154.71 | VLEN = | 373.920 | -6.00 | -2.94 | 90 | -3.24 | 151.47 | ||||||
T-201 SUMBAWA 50000 KL LNG / OUTER TANK Net Weight (¼³°èÁß·®) ¡¡¡¡D= 62 (m), H= 24.14 (m) | Horizontal Weld (¼öÆò¿ëÁ¢ : 2G) [ÀÚµ¿:SAW or ¼öµ¿:SMAW] [¿ëÂøÈ¿À²:SAW (95%) / ¼öµ¿:SMAW (60%)] | Vertical Weld (¼öÁ÷¿ëÁ¢) [ FCAW ¿ëÂøÈ¿À²: (90%) ] | ÇÕ°èÁß·® | REMARK | ![]() [»õâ¿¡¼] T-201 SUMBAWA 50000 KL LNG / OUTER TANK Å« À̹ÌÁö ·Î º¸±â [»õâ¿¡¼] PDF µµ¸é º¸±â [»õâ¿¡¼] SHOP_WPS_PQR_SUMBAWA_50K PDF º¸±â |
||||||||||||||||
No. | Material | Thickness (mm) | Width (mm) | Length (mm) | Qty (SHT) | Weight (Ton) | Joint No. | ¼öÆò¿ëÁ¢ ÃѱæÀÌ (m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | Joint No. | shCirQty=[16] ¼öÁ÷¿ëÁ¢ ÃѱæÀÌ VL = 16 PCS * Each S.W(m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ¼öÆò+¼öÁ÷ ¿ëÁ¢ºÀÁß·® (kg) | REMARK | |
7 | A553-TYPE1 (Comp. Ring+Top Shell) | 13.0 | 3440 | 12176 | 16 | 68.384 | 2G-H7 | 194 | 99.37 | 151.33 | 95 | 159.29 | 3G-V7 | 3.44m *16= 55.04 m | -1.00 | -0.43 | 90 | -0.48 | 158.81 | ||
6 | A553-TYPE1 | 13.0 | 3450 | 12176 | 16 | 68.592 | 2G-H6 | 194 | -1.00 | -1.52 | 95 | -1.60 | 3G-V6 | 3.45m *16= 55.2 m | -1.00 | -0.43 | 90 | -0.48 | -2.08 | ||
5 | A553-TYPE1 | 13.5 | 3450 | 12176 | 16 | 71.232 | 2G-H5 | 194 | -1.00 | -1.52 | 95 | -1.60 | 3G-V5 | 3.45m *16= 55.2 m | -1.00 | -0.43 | 90 | -0.48 | -2.08 | ||
4 | A553-TYPE1 | 14.5 | 3450 | 12176 | 16 | 76.496 | 2G-H4 | 194 | -1.00 | -1.52 | 95 | -1.60 | 3G-V4 | 3.45m *16= 55.2 m | -1.00 | -0.43 | 90 | -0.48 | -2.08 | ||
3 | A553-TYPE1 | 16.0 | 3450 | 12176 | 16 | 84.416 | 2G-H3 | 194 | -1.00 | -1.52 | 95 | -1.60 | 3G-V3 | 3.45m *16= 55.2 m | -1.00 | -0.43 | 90 | -0.48 | -2.08 | ||
2 | A553-TYPE1 | 18.0 | 3450 | 12177 | 16 | 94.976 | 2G-H2 | 194 | -1.00 | -1.52 | 95 | -1.60 | 3G-V2 | 3.45m *16= 55.2 m | -1.00 | -0.43 | 90 | -0.48 | -2.08 | ||
1 | A553-TYPE1 | 20.0 | 3450 | 12177 | 16 | 105.536 | 2G-H1 | 194 | -1.00 | -1.52 | 98 | -1.60 | 3G-V1 | 3.45m *16= 55.2 m | -1.00 | -0.43 | 90 | -0.48 | -2.08 | ||
A) | 1st Shell + Annular Plate | t1st= 20 tAnn= 13 | 3450 | 12177 | N/A | N/A | 1F-An | 194.0 | 98.00 | 149.24 | 60 | 248.73 | - | - | - | - | - | - | -1.60 | ||
T-201 SUMBAWA 50000 KL LNG / OUTER TANK Total = | 112 | 569.6 | HLEN = | 1552.0 | 191.37 | 291.45 | 98 | 398.42 | VLEN = | 386.240 | -7.00 | -3.01 | 90 | -3.36 | 395.06 |
T-201 SUMBAWA 50000 KL LNG / INNER TANK, D= 60 (m), H= 23.37 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 6th) | A553-TYPE1 | t 16.5 ~ 11 | 23370 | 11784 | 16 | 96 | 435.4 | SAW-2G (¼öÆò¿ëÁ¢) | 1316.0 | 60.70 | 98.0 | 154.71 | 89000 | 1.00 | 15,935 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 185.65 | 5500 | 1.00 | 1,021 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 373.9 | -6.00 | 90.0 | -3.24 | 103000 | 1.00 | -334 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A553-TYPE1 | t 5¡¿©ª57984 | 2438 | 6096 | N/A | N/A | 103.64 | FCAW FILLET (2F) | 945.8 | 15.00 | 90.0 | 124.00 | 103000 | 1.00 | 12,772 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A553-TYPE1 | t 11¡¿(©ª60170 - ©ª57884) | 1143 | N/A | 32 | 18.3 | SMAW V-GROOVE (1G+4G) | 36.6 | 74.90 | 60.0 | 35.85 | 59000 | 1.00 | 2,115 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
4. STIFFENER / TOP GIRDER | A553-TYPE1 | L450x11+120x11 FB 180x11 | 11784 | 16 | 7 °³¼Ò (¾çÂÊÇÊ·¿¿¬¼Ó) | 25.09 | FCAW FILLET (2F+4F) ¾ç¸éÇÊ·¿¿¬¼Ó¿ëÁ¢ | 1319.0 | 145.20 | 90.0 | 1670.47 | 103000 | 1.00 | 172,058 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |
T-201 SUMBAWA 50000 KL LNG / INNER TANK Weld Metal Total = | 2191.59 | kg | 203,567 | (õ¿ø) | ||||||||||||
T-201 SUMBAWA 50000 KL LNG / OUTER TANK, D= 62 (m), H= 24.14 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 7th) | A553-TYPE1 | t 20 ~ 13 | 24140 | 12177 | 16 | 112 | 569.6 | SAW-2G (¼öÆò¿ëÁ¢) | 1552.0 | 191.37 | 98.0 | 398.42 | 89000 | 1.00 | 41,037 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 478.10 | 5500 | 1.00 | 2,629 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 386.2 | -7.00 | 90.0 | -3.36 | 103000 | 1.00 | -346 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A553-TYPE1 | t 5¡¿©ª57700 | 2438 | 6096 | N/A | N/A | 102.63 | FCAW FILLET (2F) | 937.5 | 15.00 | 90.0 | 123.00 | 103000 | 1.00 | 12,669 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A553-TYPE1 | t 13¡¿(©ª62184 - ©ª57600) | 2292 | N/A | 32 | 44.01 | SMAW V-GROOVE (1G+4G) | 73.3 | 104.70 | 60.0 | 100.47 | 59000 | 1.00 | 5,928 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
5.1 ROOF PLATE | A516-60 | t 7, RR=49600 | 2435 | 4355 | N/A | N/A | 190.06 | FCAW(1G) BUTT OR SINGLE LAP | 3290.5 | 49.00 | 70.0 | 1808.13 | 3200 | 1.00 | 5,786 | FCAW ROOF (OD 1.4 DS 7100), About Unit Price = 3200 (¿ø/kg) |
5.2 ROOF PLATE to Rafter/Girder | A36 | H396X199X7X11 | 30485(L) | 80 Rafters + 7 Rings(L:851.7m) | 186.24 | FCAW (4F) ©ª1.2 DS7100 E71T-1C | 3290.5 | 49.00 | 70.0 | 1808.13 | 3200 | 1.00 | 5,786 | FCAW(DS7100), About Unit Price = 3200 (¿ø/kg) | ||
T-201 SUMBAWA 50000 KL LNG / OUTER TANK Weld Metal Total = | 4672.42 | kg | 73,489 | (õ¿ø) | ||||||||||||
INNER/OUTER TANK TOTAL = | 6864.01 | kg | 277,056 | (õ¿ø) |
A) ¸µÄÁ X-Groove ¿ëÁ¢ºÎ ´Ü¸éÀû °è»ê![]() | B) ¶Ç ´Ù¸¥ ¿ëÁ¢ºÎ ´Ü¸éÀû °è»ê![]() |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
[T201] CAP2 LP Ethylene / INNER TANK Net Weight (¼³°èÁß·®) ¡¡¡¡D= 46.3 (m), H= 16.3 (m) | Horizontal Weld (¼öÆò¿ëÁ¢ : 2G) [ÀÚµ¿:SAW or ¼öµ¿:SMAW] [¿ëÂøÈ¿À²:SAW (95%) / ¼öµ¿:SMAW (60%)] | Vertical Weld (¼öÁ÷¿ëÁ¢) [ FCAW ¿ëÂøÈ¿À²: (90%) ] | ÇÕ°èÁß·® | REMARK | ![]() [»õâ¿¡¼] [T201] CAP2 LP Ethylene / INNER TANK Å« À̹ÌÁö ·Î º¸±â [»õâ¿¡¼] PDF µµ¸é º¸±â [»õâ¿¡¼] ÀúÀåÅÊÅ© ¿ëÁ¢ Ç¥ÁØÈ CAD ÆÄÀÏ (dwg) [»õâ¿¡¼] STE_ÀúÀåÅÊÅ©_¿ëÁ¢ºÎ_°³¼±Ç¥ÁØ_Ȳ»óÈ (pdf) [»õâ¿¡¼] SHOP_WPS_PQR_SUMBAWA_50K PDF º¸±â [»õâ¿¡¼] ¿ëÁ¢ºÎ_¿ëÀÔ¸éÀû_»êÃâ_ÀÌÇѳª.pdf |
||||||||||||||||
No. | Material | Thickness (mm) | Width (mm) | Length (mm) | Qty (SHT) | Weight (Ton) | Joint No. | ¼öÆò¿ëÁ¢ ÃѱæÀÌ (m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | Joint No. | shCirQty=[10] ¼öÁ÷¿ëÁ¢ ÃѱæÀÌ VL = 10 PCS * Each S.W(m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ¼öÆò+¼öÁ÷ ¿ëÁ¢ºÀÁß·® (kg) | REMARK | |
5 | A553-TYPE1 | 10.0 | 3260 | 14548 | 10 | 37.230 | 2G-H5 | 145 | -1.00 | -1.14 | 95 | -1.20 | 3G-V5 | 3.26m *10= 32.6 m | -1.00 | -0.26 | 90 | -0.29 | -1.49 | ||
4 | A553-TYPE1 | 11.0 | 3260 | 14549 | 10 | 40.960 | 2G-H4 | 145 | -1.00 | -1.14 | 95 | -1.20 | 3G-V4 | 3.26m *10= 32.6 m | -1.00 | -0.26 | 90 | -0.29 | -1.49 | ||
3 | A553-TYPE1 | 14.0 | 3260 | 14549 | 10 | 52.130 | 2G-H3 | 145 | -1.00 | -1.14 | 95 | -1.20 | 3G-V3 | 3.26m *10= 32.6 m | -1.00 | -0.26 | 90 | -0.29 | -1.49 | ||
2 | A553-TYPE1 | 18.0 | 3260 | 14551 | 10 | 67.030 | 2G-H2 | 145 | -1.00 | -1.14 | 95 | -1.20 | 3G-V2 | 3.26m *10= 32.6 m | -1.00 | -0.26 | 90 | -0.29 | -1.49 | ||
1 | A553-TYPE1 | 20.0 | 3260 | 14551 | 10 | 74.470 | 2G-H1 | 145 | -1.00 | -1.14 | 98 | -1.20 | 3G-V1 | 3.26m *10= 32.6 m | -1.00 | -0.26 | 90 | -0.29 | -1.49 | ||
A) | 1st Shell + Annular Plate | t1st= 20 tAnn= 13 | 3260 | 14551 | N/A | N/A | 1F-An | 145.0 | 98.00 | 111.55 | 60 | 185.92 | - | - | - | - | - | - | -1.20 | ||
[T201] CAP2 LP Ethylene / INNER TANK Total = | 50 | 271.8 | HLEN = | 870.0 | 93.00 | 105.85 | 98 | 179.92 | VLEN = | 163.000 | -5.00 | -1.30 | 90 | -1.45 | 178.47 | ||||||
[T201] CAP2 LP Ethylene / OUTER TANK Net Weight (¼³°èÁß·®) ¡¡¡¡D= 48.3 (m), H= 18.4 (m) | Horizontal Weld (¼öÆò¿ëÁ¢ : 2G) [ÀÚµ¿:SAW or ¼öµ¿:SMAW] [¿ëÂøÈ¿À²:SAW (95%) / ¼öµ¿:SMAW (60%)] | Vertical Weld (¼öÁ÷¿ëÁ¢) [ FCAW ¿ëÂøÈ¿À²: (90%) ] | ÇÕ°èÁß·® | REMARK | ![]() [»õâ¿¡¼] [T201] CAP2 LP Ethylene / OUTER TANK Å« À̹ÌÁö ·Î º¸±â [»õâ¿¡¼] PDF µµ¸é º¸±â [»õâ¿¡¼] SHOP_WPS_PQR_SUMBAWA_50K PDF º¸±â |
||||||||||||||||
No. | Material | Thickness (mm) | Width (mm) | Length (mm) | Qty (SHT) | Weight (Ton) | Joint No. | ¼öÆò¿ëÁ¢ ÃѱæÀÌ (m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | Joint No. | shCirQty=[12] ¼öÁ÷¿ëÁ¢ ÃѱæÀÌ VL = 12 PCS * Each S.W(m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ¼öÆò+¼öÁ÷ ¿ëÁ¢ºÀÁß·® (kg) | REMARK | |
6 | A553-TYPE1 (Comp. Ring+Top Shell) | 45.5 | 400 | 12656 | 12 | 21.696 | 2G-H6 | 151 | 1217.31 | 1442.94 | 95 | 1518.88 | 3G-V6 | 0.4m *12= 4.8 m | -1.00 | -0.04 | 90 | -0.04 | 1518.84 | ||
5 | A553-TYPE1 | 12.0 | 3600 | 12648 | 12 | 51.468 | 2G-H5 | 151 | -1.00 | -1.19 | 95 | -1.25 | 3G-V5 | 3.6m *12= 43.2 m | -1.00 | -0.34 | 90 | -0.38 | -1.63 | ||
4 | A553-TYPE1 | 12.0 | 3600 | 12648 | 12 | 51.468 | 2G-H4 | 151 | -1.00 | -1.19 | 95 | -1.25 | 3G-V4 | 3.6m *12= 43.2 m | -1.00 | -0.34 | 90 | -0.38 | -1.63 | ||
3 | A553-TYPE1 | 13.0 | 3600 | 12648 | 12 | 55.764 | 2G-H3 | 151 | -1.00 | -1.19 | 95 | -1.25 | 3G-V3 | 3.6m *12= 43.2 m | -1.00 | -0.34 | 90 | -0.38 | -1.63 | ||
2 | A553-TYPE1 | 15.0 | 3600 | 12648 | 12 | 64.332 | 2G-H2 | 151 | -1.00 | -1.19 | 95 | -1.25 | 3G-V2 | 3.6m *12= 43.2 m | -1.00 | -0.34 | 90 | -0.38 | -1.63 | ||
1 | A553-TYPE1 | 16.0 | 3600 | 12649 | 12 | 68.628 | 2G-H1 | 151 | -1.00 | -1.19 | 98 | -1.25 | 3G-V1 | 3.6m *12= 43.2 m | -1.00 | -0.34 | 90 | -0.38 | -1.63 | ||
A) | 1st Shell + Annular Plate | t1st= 16 tAnn= 10.5 | 3600 | 12649 | N/A | N/A | 1F-An | 151.0 | 62.72 | 74.35 | 60 | 123.92 | - | - | - | - | - | - | -1.25 | ||
[T201] CAP2 LP Ethylene / OUTER TANK Total = | 72 | 313.4 | HLEN = | 1057.0 | 1275.03 | 1511.34 | 98 | 1636.55 | VLEN = | 220.800 | -6.00 | -1.74 | 90 | -1.94 | 1634.61 |
[T201] CAP2 LP Ethylene / INNER TANK, D= 46.3 (m), H= 16.3 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 5th) | A553-TYPE1 | t 20 ~ 10 | 16300 | 14551 | 10 | 50 | 271.8 | SAW-2G (¼öÆò¿ëÁ¢) | 870.0 | 93.00 | 98.0 | 179.92 | 89000 | 1.00 | 18,532 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 215.90 | 5500 | 1.00 | 1,187 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 163.0 | -5.00 | 90.0 | -1.45 | 103000 | 1.00 | -149 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A553-TYPE1 | t 6.5¡¿©ª43714 | 3048 | 12192 | N/A | N/A | 76.58 | FCAW FILLET (2F) | 449.3 | 25.35 | 90.0 | 99.00 | 103000 | 1.00 | 10,197 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A553-TYPE1 | t 13¡¿(©ª46484 - ©ª43614) | 1435 | N/A | 20 | 20.73 | SMAW V-GROOVE (1G+4G) | 28.7 | 104.70 | 60.0 | 39.32 | 59000 | 1.00 | 2,320 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
4. STIFFENER / TOP GIRDER | A553-TYPE1 | L450x10+120x10 FB 150x11 | 14551 | 10 | 5 °³¼Ò (¾çÂÊÇÊ·¿¿¬¼Ó) | 12.69 | FCAW FILLET (2F+4F) ¾ç¸éÇÊ·¿¿¬¼Ó¿ëÁ¢ | 727.0 | 145.20 | 90.0 | 920.72 | 103000 | 1.00 | 94,834 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |
[T201] CAP2 LP Ethylene / INNER TANK Weld Metal Total = | 1474.09 | kg | 126,921 | (õ¿ø) | ||||||||||||
[T201] CAP2 LP Ethylene / OUTER TANK, D= 48.3 (m), H= 18.4 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 6th) | A553-TYPE1 | t 16 ~ 45.5 | 18400 | 12649 | 12 | 72 | 313.4 | SAW-2G (¼öÆò¿ëÁ¢) | 1057.0 | 1275.03 | 98.0 | 1636.55 | 89000 | 1.00 | 168,565 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 1963.86 | 5500 | 1.00 | 10,801 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 220.8 | -6.00 | 90.0 | -1.94 | 103000 | 1.00 | -200 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A553-TYPE1 | t 6.5¡¿©ª43446 | 2438 | 6096 | N/A | N/A | 75.64 | FCAW FILLET (2F) | 563.8 | 25.35 | 90.0 | 125.00 | 103000 | 1.00 | 12,875 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A553-TYPE1 | t 11¡¿(©ª48468 - ©ª43346) | 2561 | N/A | 24 | 30.44 | SMAW V-GROOVE (1G+4G) | 61.5 | 68.30 | 60.0 | 54.92 | 59000 | 1.00 | 3,240 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
5.1 ROOF PLATE | A516-70 | t 7, RR=43470 | 2371 | 4521 | N/A | N/A | 104.14 | FCAW(1G) BUTT OR SINGLE LAP | 1912.0 | 42.25 | 70.0 | 905.91 | 3200 | 1.00 | 2,899 | FCAW ROOF (OD 1.4 DS 7100), About Unit Price = 3200 (¿ø/kg) |
5.2 ROOF PLATE to Rafter/Girder | A36 | H346X174X6X9 | 22603(L) | 64 Rafters + 5 Rings(L:465.4m) | 79.16 | FCAW (4F) ©ª1.2 DS7100 E71T-1C | 1912.0 | 42.25 | 70.0 | 905.91 | 3200 | 1.00 | 2,899 | FCAW(DS7100), About Unit Price = 3200 (¿ø/kg) | ||
[T201] CAP2 LP Ethylene / OUTER TANK Weld Metal Total = | 5595.29 | kg | 201,079 | (õ¿ø) | ||||||||||||
INNER/OUTER TANK TOTAL = | 7069.38 | kg | 328,000 | (õ¿ø) |
A) ¸µÄÁ X-Groove ¿ëÁ¢ºÎ ´Ü¸éÀû °è»ê![]() | B) ¶Ç ´Ù¸¥ ¿ëÁ¢ºÎ ´Ü¸éÀû °è»ê![]() |
![]() S-Tank Engineering |
COST ESTIMATION SUMMARY °ßÀû¿ø°¡³»¿ª¼ | Page | [$CP] / [$TP] | |||||
[AAA1] | [AAA2] | |||||||
Doc. No. : [AAA3] | Rev. No. | [AAA4] |
[301] CAP2 Propane(C3/C4) / INNER TANK Net Weight (¼³°èÁß·®) ¡¡¡¡D= 70 (m), H= 27.5 (m) | Horizontal Weld (¼öÆò¿ëÁ¢ : 2G) [ÀÚµ¿:SAW or ¼öµ¿:SMAW] [¿ëÂøÈ¿À²:SAW (95%) / ¼öµ¿:SMAW (60%)] | Vertical Weld (¼öÁ÷¿ëÁ¢) [ FCAW ¿ëÂøÈ¿À²: (90%) ] | ÇÕ°èÁß·® | REMARK | ![]() [»õâ¿¡¼] [301] CAP2 Propane(C3/C4) / INNER TANK Å« À̹ÌÁö ·Î º¸±â [»õâ¿¡¼] PDF µµ¸é º¸±â [»õâ¿¡¼] ÀúÀåÅÊÅ© ¿ëÁ¢ Ç¥ÁØÈ CAD ÆÄÀÏ (dwg) [»õâ¿¡¼] STE_ÀúÀåÅÊÅ©_¿ëÁ¢ºÎ_°³¼±Ç¥ÁØ_Ȳ»óÈ (pdf) [»õâ¿¡¼] SHOP_WPS_PQR_SUMBAWA_50K PDF º¸±â [»õâ¿¡¼] ¿ëÁ¢ºÎ_¿ëÀÔ¸éÀû_»êÃâ_ÀÌÇѳª.pdf |
||||||||||||||||
No. | Material | Thickness (mm) | Width (mm) | Length (mm) | Qty (SHT) | Weight (Ton) | Joint No. | ¼öÆò¿ëÁ¢ ÃѱæÀÌ (m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | Joint No. | shCirQty=[16] ¼öÁ÷¿ëÁ¢ ÃѱæÀÌ VL = 16 PCS * Each S.W(m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ¼öÆò+¼öÁ÷ ¿ëÁ¢ºÀÁß·® (kg) | REMARK | |
9 | A537-CL2+S5 | 9.5 | 3052 | 13746 | 16 | 50.192 | 2G-H9 | 219 | -1.00 | -1.72 | 95 | -1.81 | 3G-V9 | 3.052m *16= 48.832 m | -1.00 | -0.38 | 90 | -0.42 | -2.23 | ||
8 | A537-CL2+S5 | 12.0 | 3056 | 13746 | 16 | 63.312 | 2G-H8 | 219 | -1.00 | -1.72 | 95 | -1.81 | 3G-V8 | 3.056m *16= 48.896 m | -1.00 | -0.38 | 90 | -0.42 | -2.23 | ||
7 | A537-CL2+S5 | 14.0 | 3056 | 13747 | 16 | 73.872 | 2G-H7 | 219 | -1.00 | -1.72 | 95 | -1.81 | 3G-V7 | 3.056m *16= 48.896 m | -1.00 | -0.38 | 90 | -0.42 | -2.23 | ||
6 | A537-CL2+S5 | 18.0 | 3056 | 13748 | 16 | 94.992 | 2G-H6 | 219 | -1.00 | -1.72 | 95 | -1.81 | 3G-V6 | 3.056m *16= 48.896 m | -1.00 | -0.38 | 90 | -0.42 | -2.23 | ||
5 | A537-CL2+S5 | 24.0 | 3056 | 13749 | 16 | 126.656 | 2G-H5 | 219 | -1.00 | -1.72 | 95 | -1.81 | 3G-V5 | 3.056m *16= 48.896 m | -1.00 | -0.38 | 90 | -0.42 | -2.23 | ||
4 | A537-CL2+S5 | 29.0 | 3056 | 13750 | 16 | 153.056 | 2G-H4 | 220 | -1.00 | -1.73 | 95 | -1.82 | 3G-V4 | 3.056m *16= 48.896 m | -1.00 | -0.38 | 90 | -0.42 | -2.24 | ||
3 | A537-CL2+S5 | 34.0 | 3056 | 13751 | 16 | 179.456 | 2G-H3 | 220 | -1.00 | -1.73 | 95 | -1.82 | 3G-V3 | 3.056m *16= 48.896 m | -1.00 | -0.38 | 90 | -0.42 | -2.24 | ||
2 | A537-CL2+S5 | 38.0 | 3056 | 13751 | 16 | 200.560 | 2G-H2 | 220 | -1.00 | -1.73 | 95 | -1.82 | 3G-V2 | 3.056m *16= 48.896 m | -1.00 | -0.38 | 90 | -0.42 | -2.24 | ||
1 | A537-CL2+S5 | 41.0 | 3056 | 13752 | 16 | 216.416 | 2G-H1 | 220 | -1.00 | -1.73 | 98 | -1.82 | 3G-V1 | 3.056m *16= 48.896 m | -1.00 | -0.38 | 90 | -0.42 | -2.24 | ||
A) | 1st Shell + Annular Plate | t1st= 41 tAnn= 27 | 3056 | 13752 | N/A | N/A | 1F-An | 220.0 | 411.85 | 711.26 | 60 | 1185.43 | - | - | - | - | - | - | -1.82 | ||
[301] CAP2 Propane(C3/C4) / INNER TANK Total = | 144 | 1158.5 | HLEN = | 2195.0 | 402.85 | 695.74 | 98 | 1169.10 | VLEN = | 440.000 | -9.00 | -3.42 | 90 | -3.78 | 1165.32 | ||||||
[301] CAP2 Propane(C3/C4) / OUTER TANK Net Weight (¼³°èÁß·®) ¡¡¡¡D= 72 (m), H= 30 (m) | Horizontal Weld (¼öÆò¿ëÁ¢ : 2G) [ÀÚµ¿:SAW or ¼öµ¿:SMAW] [¿ëÂøÈ¿À²:SAW (95%) / ¼öµ¿:SMAW (60%)] | Vertical Weld (¼öÁ÷¿ëÁ¢) [ FCAW ¿ëÂøÈ¿À²: (90%) ] | ÇÕ°èÁß·® | REMARK | ![]() [»õâ¿¡¼] [301] CAP2 Propane(C3/C4) / OUTER TANK Å« À̹ÌÁö ·Î º¸±â [»õâ¿¡¼] PDF µµ¸é º¸±â [»õâ¿¡¼] SHOP_WPS_PQR_SUMBAWA_50K PDF º¸±â |
||||||||||||||||
No. | Material | Thickness (mm) | Width (mm) | Length (mm) | Qty (SHT) | Weight (Ton) | Joint No. | ¼öÆò¿ëÁ¢ ÃѱæÀÌ (m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | Joint No. | shCirQty=[18] ¼öÁ÷¿ëÁ¢ ÃѱæÀÌ VL = 18 PCS * Each S.W(m) | ¿ëÀԺΠ´Ü¸éÀû A(mm©÷) | ¿ëÁ¢ºÀ NETÁß·® (kg) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ¼öÆò+¼öÁ÷ ¿ëÁ¢ºÀÁß·® (kg) | REMARK | |
10 | A537-CL2+S5 (Comp. Ring+Top Shell) | 18.0 | 3000 | 12569 | 18 | 95.904 | 2G-H10 | 226 | 190.51 | 337.98 | 95 | 355.77 | 3G-V10 | 3m *18= 54 m | -1.00 | -0.42 | 90 | -0.47 | 355.30 | ||
9 | A537-CL2+S5 | 18.0 | 3000 | 12569 | 18 | 95.904 | 2G-H9 | 226 | -1.00 | -1.77 | 95 | -1.86 | 3G-V9 | 3m *18= 54 m | -1.00 | -0.42 | 90 | -0.47 | -2.33 | ||
8 | A537-CL2+S5 | 18.0 | 3000 | 12569 | 18 | 95.904 | 2G-H8 | 226 | -1.00 | -1.77 | 95 | -1.86 | 3G-V8 | 3m *18= 54 m | -1.00 | -0.42 | 90 | -0.47 | -2.33 | ||
7 | A537-CL2+S5 | 18.0 | 3000 | 12569 | 18 | 95.904 | 2G-H7 | 226 | -1.00 | -1.77 | 95 | -1.86 | 3G-V7 | 3m *18= 54 m | -1.00 | -0.42 | 90 | -0.47 | -2.33 | ||
6 | A537-CL2+S5 | 18.0 | 3000 | 12569 | 18 | 95.904 | 2G-H6 | 226 | -1.00 | -1.77 | 95 | -1.86 | 3G-V6 | 3m *18= 54 m | -1.00 | -0.42 | 90 | -0.47 | -2.33 | ||
5 | A537-CL2+S5 | 19.0 | 3000 | 12569 | 18 | 101.232 | 2G-H5 | 226 | -1.00 | -1.77 | 95 | -1.86 | 3G-V5 | 3m *18= 54 m | -1.00 | -0.42 | 90 | -0.47 | -2.33 | ||
4 | A537-CL2+S5 | 23.0 | 3000 | 12570 | 18 | 122.562 | 2G-H4 | 226 | -1.00 | -1.77 | 95 | -1.86 | 3G-V4 | 3m *18= 54 m | -1.00 | -0.42 | 90 | -0.47 | -2.33 | ||
3 | A537-CL2+S5 | 26.0 | 3000 | 12570 | 18 | 138.546 | 2G-H3 | 226 | -1.00 | -1.77 | 95 | -1.86 | 3G-V3 | 3m *18= 54 m | -1.00 | -0.42 | 90 | -0.47 | -2.33 | ||
2 | A537-CL2+S5 | 30.0 | 3000 | 12571 | 18 | 159.858 | 2G-H2 | 226 | -1.00 | -1.77 | 95 | -1.86 | 3G-V2 | 3m *18= 54 m | -1.00 | -0.42 | 90 | -0.47 | -2.33 | ||
1 | A537-CL2+S5 | 34.0 | 3000 | 12572 | 18 | 181.188 | 2G-H1 | 226 | -1.00 | -1.77 | 98 | -1.86 | 3G-V1 | 3m *18= 54 m | -1.00 | -0.42 | 90 | -0.47 | -2.33 | ||
A) | 1st Shell + Annular Plate | t1st= 34 tAnn= 22.5 | 3000 | 12572 | N/A | N/A | 1F-An | 226.0 | 283.22 | 502.46 | 60 | 837.43 | - | - | - | - | - | - | -1.86 | ||
[301] CAP2 Propane(C3/C4) / OUTER TANK Total = | 180 | 1182.9 | HLEN = | 2486.0 | 464.73 | 824.51 | 98 | 1176.46 | VLEN = | 540.000 | -10.00 | -4.20 | 90 | -4.70 | 1171.76 |
[301] CAP2 Propane(C3/C4) / INNER TANK, D= 70 (m), H= 27.5 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 9th) | A537-CL2+S5 | t 41 ~ 9.525 | 27500 | 13752 | 16 | 144 | 1158.5 | SAW-2G (¼öÆò¿ëÁ¢) | 2195.0 | 402.85 | 98.0 | 1169.10 | 6600 | 1.00 | 7,132 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 1402.92 | 3500 | 1.00 | 4,910 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 440.0 | -9.00 | 90.0 | -3.78 | 6100 | 1.00 | -23 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A537-CL2+S5 | t 8¡¿©ª65944 | 2438 | 6096 | N/A | N/A | 214.49 | FCAW FILLET (2F) | 1180.2 | 38.40 | 90.0 | 395.00 | 6100 | 1.00 | 2,410 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A537-CL2+S5 | t 27¡¿(©ª70268 - ©ª65844) | 2212 | N/A | 32 | 100.24 | SMAW V-GROOVE (1G+4G) | 70.8 | 451.40 | 60.0 | 418.03 | 59000 | 1.00 | 24,664 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
4. STIFFENER / TOP GIRDER | A537-CL2+S5 | L450x9.525+120x9.525 FB 170x12 | 13752 | 16 | 6 °³¼Ò (¾çÂÊÇÊ·¿¿¬¼Ó) | 33.96 | FCAW FILLET (2F+4F) ¾ç¸éÇÊ·¿¿¬¼Ó¿ëÁ¢ | 1320.0 | 270.00 | 90.0 | 3108.60 | 3200 | 1.00 | 9,948 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |
[301] CAP2 Propane(C3/C4) / INNER TANK Weld Metal Total = | 6131.84 | kg | 49,041 | (õ¿ø) | ||||||||||||
[301] CAP2 Propane(C3/C4) / OUTER TANK, D= 72 (m), H= 30 (m) | 1. Weld Metal Estimate Weight and Price (õ¿ø) 2. [WPS/PQR/Welding Positioon/ ¿ëÁ¢È¨ / ÅÊÅ©¿ëÁ¢°øºÎ / MORE DETAIL] 3.¿ëÁ¢ºÀ ¹ßÁÖ ¿¹»óÁß·®(kg) = 7850(kg/m©ø) ¡¿ A(mm©÷) / 106 ¡¿ L(m) ¡¿ (100/¿ëÂøÈ¿À²) | |||||||||||||||
Welding Location (ITEM NAME) | Shell Plate Main Material | Thickness 1st ~ top shell (mm) | Width (Height) W(mm) | Length L(mm) | Circum. QTY(PCS) | QTY (PCS) | BASE Metal Weight (Ton) | Welding Process ( Position ) | ÃѱæÀÌ L(m) | ¿ëÁ¢ºÎ ´Ü¸éÀû A(mm©÷) | ¿ëÂø È¿À² (%) | ¿ëÁ¢ºÀ ¹ßÁÖ¿¹»ó Áß·®(kg) | ´Ü°¡ (¿ø/kg) | ÇÒÁõ Loss Æ÷ÇÔ | ÃÑ ±¸¸Å ¿¹»ó±Ý¾× (õ¿ø) | Remark |
1. SHELL PLATE (1st ~ 10th) | A537-CL2+S5 | t 34 ~ 18 | 30000 | 12572 | 18 | 180 | 1182.9 | SAW-2G (¼öÆò¿ëÁ¢) | 2486.0 | 464.73 | 98.0 | 1176.46 | 6600 | 1.00 | 7,176 | SAW WIRE (LNS NiCrMo60/16) ©ª2.4 ERNiCrMo-4 |
À§ ¿Í µ¿ÀÏ, FLUX Áß·®(kg) = SAWÁß·® ¡¿ 120% | FLUX (For SAW-2G) | SAWÁß·®¡¿120%= | 1411.75 | 3500 | 1.00 | 4,941 | SAW FLUX (P2007) | |||||||||
À§ ¿Í µ¿ÀÏ | FCAW-3G (¼öÁ÷¿ëÁ¢) | 540.0 | -10.00 | 90.0 | -4.70 | 6100 | 1.00 | -29 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 | |||||||
2. BOTTOM PLATE | A516-60N+S5 | t 8¡¿©ª65604 | 2438 | 6096 | N/A | N/A | 212.28 | FCAW FILLET (2F) | 1167.1 | 38.40 | 90.0 | 391.00 | 6100 | 1.00 | 2,385 | FCAW (Supercore 625P) ©ª1.2 ENiCrMo3T1-4 |
3. ANNULAR PLATE | A537-CL2+S5 | t 23¡¿(©ª72240 - ©ª65504) | 3368 | N/A | 36 | 128.71 | SMAW V-GROOVE (1G+4G) | 121.2 | 313.50 | 60.0 | 497.32 | 59000 | 1.00 | 29,342 | SMAW(NYLOID 2) ©ª4.0 ENiCrMo-6 | |
5.1 ROOF PLATE | A516-70 | t 9, RR=64800 | 2356 | 4396 | N/A | N/A | 302.6 | FCAW(1G) BUTT OR SINGLE LAP | 4507.4 | 72.25 | 70.0 | 3652.06 | 3200 | 1.00 | 11,687 | FCAW ROOF (OD 1.4 DS 7100), About Unit Price = 3200 (¿ø/kg) |
5.2 ROOF PLATE to Rafter/Girder | A36 | H400X200X8X13 | 35168(L) | 96 Rafters + 8 Rings(L:1131.3m) | 297.49 | FCAW (4F) ©ª1.2 DS7100 E71T-1C | 4507.4 | 72.25 | 70.0 | 3652.06 | 3200 | 1.00 | 11,687 | FCAW(DS7100), About Unit Price = 3200 (¿ø/kg) | ||
[301] CAP2 Propane(C3/C4) / OUTER TANK Weld Metal Total = | 10338.63 | kg | 67,189 | (õ¿ø) | ||||||||||||
INNER/OUTER TANK TOTAL = | 16470.47 | kg | 116,230 | (õ¿ø) |
A) ¸µÄÁ X-Groove ¿ëÁ¢ºÎ ´Ü¸éÀû °è»ê![]() | B) ¶Ç ´Ù¸¥ ¿ëÁ¢ºÎ ´Ü¸éÀû °è»ê![]() |